[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-4551424":3,"bid-related-4551424":32,"bid-history-4551424":101,"union-latest":105},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":11,"publishedDate":12,"deadlineDate":13,"budget":13,"status":14,"department":15,"bidCategoryName":16,"bidTypeName":17,"categoryText":16,"regionText":18,"deadlineTime":13,"openingDate":13,"qualificationText":19,"aiSummary":20,"aiSummaryGated":21,"aiSummaryTruncated":22,"sourceUrl":23,"dataSourceCode":24,"budgetTaxIncluded":13,"documentUrls":25,"businessExperience":22,"localOffice":27,"securityRequirement":27,"qualifications":28,"certifications":29,"organization":30},4551424,"熊本県警察本部交通管制センター 交通管制システム整備工事",3395,43,2,21,4,"熊本県","2026-09-06T15:00:00.000Z",null,"active","警察本部","電気","随意契約","熊本県警察本部交通管制センター","・工事施工に必要な官公庁及び関係機関への申請手続きを受注者が実施すること\n・電源契約の申請（変更）及び通信事業者回線の新設（変更）手続きを受注者が実施すること\n・施工計画書の提出が必須\n・既存システム及び交通管制端末の動作に影響を与えないよう施工すること\n・監督員の立会指示に従うこと\n・通信事業者回線新設に伴う施設設置負担金（中央装置側分）を負担すること\n・工事実績情報システム（CORINS）への登録を実施すること\n・請負金額100万円以上の場合、建設副産物情報交換システム（COBRIS）に登録すること\n・週休2日試行工事への対応（熊本県土木部実施要領に基づく）\n・業務に関する知識・情報を第三者に漏洩しないこと\n・既存施設への損害発生時は受注者の責任において解決すること","【案件概要】\n熊本県警察本部が交通管制センターの交通管制システム整備工事を随意契約で発注。本工事は、交通管制端末の新設・更新に伴う中央装置の設定追加、ソフトウェア改修・機能追加、交通管理リンク年度更新設定、および光回線等を使用した端末接続回線装置の追加整備と設定を実施するもの。履行場所は熊本県警察本部交通管制センター。工事期間は契約翌日から令和9年3月26日","（金）までの予定。\n\n【業務内容】\n- 交通管制端末の新設・更新に伴う端末対応ユニットの調整及び収容変更\n- 交通管制システム中央装置への設定追加及び調整\n- 交通管制システム中央装置のソフトウェア改修及び機能追加\n- 交通管理リンク年度更新に伴う上位装置（システム管理ブロック、交通情報ブロック）設定の年度更新\n- 端末接続回線装置2式の設置（光回線またはMVNO回線経由での通信対応）\n- LANケーブル敷設によるネットワーク接続\n- 信号制御機の集中制御化対応及び伝送方式変更対応\n- 車両感知器・光ビーコン・交通情報板等の更新・撤去対応機能の改修\n- 交通情報提供設定の追加・更新\n- システム総合調整及び動作確認\n- 工事完成図書（システム構成図、ネットワーク構成図、設定一覧表等）の作成・提出\n\n【応募要件】\n- 工事施工に必要な官公庁及び関係機関への申請手続きは受注者が実施し、費用負担も受注者負担\n- 電源契約申請（変更）及び通信事業者回線新設（変更）の手続きも受注者負担\n- 施工計画書の提出が必須\n- 既存システム及び交通管制端末の動作に影響を与えないよう十分注意して施工\n- 監督員の立会指示に従い、監督員の承認を得た上で工事施工\n- 通信事業者回線新設に伴う施設設置負担金（中央装置側分）は受注者負担\n- 工事実績情報システム（CORINS）への登録及び工事カルテ受領書写しの提出\n- 建設副産物情報交換システム（COBRIS）への登録（請負金額100万円以上の場合）\n- 週休2日試行工事への対応（熊本県土木部実施要領に基づく）\n- 知識・情報の第三者漏洩禁止及び厳格な秘密保持\n- 既存施設への損害発生時は受注者の責任において解決\n\n【工期・期間】\n契約の翌日から令和9年（2027年）3月26日（金）まで\n\n【その他特記事項】\n- 交通流への影響が少ない時間帯での作業実施を努力目標\n- 執務時間外の作業時には事前に監督員の承認が必要\n- 導入機器に起因する不具合及び設定内容の不具合については無償で修復処理\n- 既存施設・設備及び従事者並びに第三者への危害発生時は直ちに監督員に報告",true,"(redacted)","kumamoto-ebid",[26],{"url":23,"name":23},false,[],[],{"id":6,"name":11,"categoryId":31,"parentId":13,"parentName":13,"bidInfoUrl":13},50,{"sameOrganization":33,"samePrefecture":50,"similar":72},[34,38,41,44,47],{"id":35,"title":36,"organizationName":11,"prefectureName":11,"publishedDate":12,"deadlineDate":37,"budget":13,"status":14},4551430,"宇城管内単県河川等災害関連事業(地質その1)委託","2027-03-11T15:00:00.000Z",{"id":39,"title":40,"organizationName":11,"prefectureName":11,"publishedDate":12,"deadlineDate":37,"budget":13,"status":14},4551429,"宇城管内単県河川等災害関連事業(地質その3)委託",{"id":42,"title":43,"organizationName":11,"prefectureName":11,"publishedDate":12,"deadlineDate":37,"budget":13,"status":14},4551428,"宇城管内単県河川等災害関連事業(地質その4)委託",{"id":45,"title":46,"organizationName":11,"prefectureName":11,"publishedDate":12,"deadlineDate":37,"budget":13,"status":14},4551427,"宇城管内単県河川等災害関連事業(地質その8)委託",{"id":48,"title":49,"organizationName":11,"prefectureName":11,"publishedDate":12,"deadlineDate":37,"budget":13,"status":14},4551426,"宇城管内単県河川等災害関連事業(地質その2)委託",[51,54,59,63,67],{"id":52,"title":53,"organizationName":11,"prefectureName":11,"publishedDate":12,"deadlineDate":37,"budget":13,"status":14},4551425,"宇城管内単県河川等災害関連事業(地質その6)委託",{"id":55,"title":56,"organizationName":11,"prefectureName":11,"publishedDate":12,"deadlineDate":57,"budget":58,"status":14},4551422,"熊本市北区龍田町上立田交差点外 集中制御機更新等工事","2026-10-01T15:00:00.000Z",23159000,{"id":60,"title":61,"organizationName":11,"prefectureName":11,"publishedDate":12,"deadlineDate":57,"budget":62,"status":14},4551421,"球磨郡錦町井手ノ口交差点外 信号機移設等工事",23332000,{"id":64,"title":65,"organizationName":11,"prefectureName":11,"publishedDate":12,"deadlineDate":57,"budget":66,"status":14},4551420,"熊本市南区南高江バス停前外 車両感知器撤去等工事",26046000,{"id":68,"title":69,"organizationName":11,"prefectureName":11,"publishedDate":12,"deadlineDate":70,"budget":71,"status":14},4551419,"黒石2期地区農村地域防災減災事業(農地保全)第12号工事 他合併","2027-03-22T15:00:00.000Z",19576000,[73,78,85,90,96],{"id":74,"title":75,"organizationName":76,"prefectureName":77,"publishedDate":12,"deadlineDate":13,"budget":13,"status":14},4551410,"(仮称)新埼玉中部環境センター外周道路設計業務委託","鴻巣市 総務部 契約検査課","埼玉県",{"id":79,"title":80,"organizationName":81,"prefectureName":82,"publishedDate":12,"deadlineDate":83,"budget":84,"status":14},4551017,"鳥羽水環境保全センター 水処理施設実施設計委託（その８）","京都市","京都府","2026-10-20T15:00:00.000Z",293600000,{"id":86,"title":87,"organizationName":88,"prefectureName":77,"publishedDate":12,"deadlineDate":89,"budget":13,"status":14},4550716,"ハイブリッド乗用自動車(1台)(熊谷建築安全センター)","埼玉県 総務部 入札課","2026-10-08T15:00:00.000Z",{"id":91,"title":92,"organizationName":93,"prefectureName":94,"publishedDate":12,"deadlineDate":95,"budget":13,"status":14},4550694,"トナーカートリッジほか 購入(福祉相談センター)","茨城県 福祉部 福祉相談センター","茨城県","2026-09-16T15:00:00.000Z",{"id":97,"title":98,"organizationName":99,"prefectureName":94,"publishedDate":12,"deadlineDate":100,"budget":13,"status":14},4550691,"いばらき量子ビーム研究センター等で使用する電気の供給","茨城県 産業戦略部 技術振興局科学技術振興課","2026-10-18T15:00:00.000Z",[102],{"year":103,"count":104},2026,265,[106,112,118,124],{"title":107,"link":108,"date":109,"thumb":110,"cat":111},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":113,"link":114,"date":115,"thumb":116,"cat":117},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":119,"link":120,"date":121,"thumb":122,"cat":123},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":125,"link":126,"date":127,"thumb":128,"cat":129},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]