[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-4551038":3,"bid-history-4551038":41,"bid-related-4551038":45,"union-latest":121},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":11,"bidCategoryName":17,"bidTypeName":18,"categoryText":19,"regionText":20,"deadlineTime":21,"openingDate":22,"qualificationText":23,"aiSummary":24,"aiSummaryGated":25,"aiSummaryTruncated":26,"sourceUrl":27,"dataSourceCode":28,"budgetTaxIncluded":26,"documentUrls":29,"businessExperience":35,"localOffice":26,"securityRequirement":35,"qualifications":36,"certifications":37,"organization":38},4551038,"08県単道修 第08-51-519-0-001号 道路舗装修繕工事(とりおりA3\u002F3)",2212,8,2,15,1,"茨城県 土木部 水戸土木事務所","茨城県","2026-09-06T15:00:00.000Z","2026-10-01T15:00:00.000Z",13750000,"active","舗装","一般競争入札","舗装工事","主要地方道 水戸神栖線(東茨城郡茨城町海老沢)","17:00:00","2026-10-04T15:00:00.000Z","・舗装工事について令和7・8年度茨城県建設工事入札参加資格者名簿にA等級で登載されていること\n・舗装工事に係る特定建設業の許可を受けていること\n・茨城県水戸土木事務所管内に建設業法に基づく本店があること\n・契約締結日から1年7月以内の経営事項審査を受けていること\n・対象工事の設計業務等の受託者でないこと、また受託者と資本・人事面で関連がないこと\n・配置予定技術者は1級土木施工管理技士等、舗装工事について建設業法第26条に規定する主任または監理技術者になり得る者であること\n・配置予定技術者は本工事のみへの専任配置が必要（建設業法第26条第3項第1号、第2号に該当する場合を除く）\n・配置予定技術者は競争参加資格確認申請日以前に3月以上の直接的かつ恒常的な雇用関係があること","【案件概要】\n茨城県水戸土木事務所が実施する道路舗装修繕工事の一般競争入札（総合評価方式・事後審査）。主要地方道水戸神栖線の東茨城郡茨城町海老沢地先において、路面切削及び表層舗装工を施工する。予定価格は13,750,000円（税込）で、工期は契約日翌日から90日間。電子契約対象工事であり、分割発注の同一工種複数工事のうち第3番目の工事（とりおりA3\u002F3）とな","る。公告日は令和8年9月7日、入札締切は令和8年10月2日。\n\n【業務内容】\n- 道路舗装修繕工事 延長240m、幅員6m、厚さ5cm\n- 路面切削工 厚さ5cm、面積1,420m2\n- 表層工 厚さ5cm、面積1,420m2\n- 区画線工 一式\n\n【応募要件】\n・舗装工事について令和7・8年度茨城県建設工事入札参加資格者名簿にA等級で登載されていること\n・舗装工事に係る特定建設業の許可を受けていること\n・茨城県水戸土木事務所管内に建設業法に基づく本店があること\n・契約締結日から1年7月以内の経営事項審査を受けていること\n・対象工事の設計業務等の受託者でないこと、また受託者と資本・人事面で関連がないこと\n・配置予定技術者は1級土木施工管理技士等、舗装工事について建設業法第26条に規定する主任または監理技術者になり得る者であること\n・配置予定技術者は本工事のみへの専任配置が必要（建設業法第26条第3項第1号、第2号に該当する場合を除く）\n・配置予定技術者は競争参加資格確認申請日以前に3月以上の直接的かつ恒常的な雇用関係があること（専任不要の場合は3月未満でも可）\n\n【工期・期間】\n契約日の翌日から90日間",true,"(redacted)","koukai-ibaraki",[30,31,32,33,34],{"url":27,"name":27},{"url":27,"name":27},{"url":27,"name":27},{"url":27,"name":27},{"url":27,"name":27},false,[],[],{"id":6,"name":11,"categoryId":39,"parentId":40,"parentName":40,"bidInfoUrl":40},50,null,[42],{"year":43,"count":44},2026,81,{"sameOrganization":46,"samePrefecture":72,"similar":98},[47,51,55,60,66],{"id":48,"title":49,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":50,"status":16},4551039,"08県単道修 第08-51-520-0-001号 道路舗装修繕工事(とりおりA1\u002F3)",19668000,{"id":52,"title":53,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":54,"status":16},4551037,"08県単道修 第08-51-517-0-001号 道路舗装修繕工事(とりおりA2\u002F3)",18447000,{"id":56,"title":57,"organizationName":11,"prefectureName":12,"publishedDate":58,"deadlineDate":40,"budget":59,"status":16},4256448,"08県単河調 第08-51-910-0-051号 07県単河調 第07-05-801-0-052号 合併 治水計画検討業務委託","2026-09-01T15:00:00.000Z",5126000,{"id":61,"title":62,"organizationName":11,"prefectureName":12,"publishedDate":63,"deadlineDate":64,"budget":65,"status":16},4221880,"08国補公園 第08-08-869-0-001号 07国補公園 第07-08-869-0-002号 07国補公園単 第07-08-119-0-004号 合併 偕楽園園路改修工事 ※総合評価","2026-08-31T15:00:00.000Z","2026-09-28T15:00:00.000Z",11759000,{"id":67,"title":68,"organizationName":11,"prefectureName":12,"publishedDate":69,"deadlineDate":70,"budget":71,"status":16},4174030,"08県単交安 第08-51-497-0-001号 07県単交安 第07-51-486-0-001号 合併 道路照明灯修繕工事(とりおりB1\u002F3)","2026-08-30T15:00:00.000Z","2026-09-24T15:00:00.000Z",14729000,[73,79,83,88,93],{"id":74,"title":75,"organizationName":76,"prefectureName":12,"publishedDate":13,"deadlineDate":77,"budget":78,"status":16},4554735,"08国補公下第3-1号・08市単公下第3-1号合併汚水管布設工事(高道祖第1)","下妻市 総務部 財政課","2026-09-17T15:00:00.000Z",37884000,{"id":80,"title":81,"organizationName":76,"prefectureName":12,"publishedDate":13,"deadlineDate":77,"budget":82,"status":16},4554734,"08国補公下第3-2号・08市単公下第3-2号合併汚水管布設工事(高道祖第2)",31801000,{"id":84,"title":85,"organizationName":76,"prefectureName":12,"publishedDate":13,"deadlineDate":86,"budget":87,"status":16},4554733,"08国補公下第1-1号・08市単公下第1-1号合併汚水管布設工事(小島第1)","2026-10-05T15:00:00.000Z",25707000,{"id":89,"title":90,"organizationName":91,"prefectureName":12,"publishedDate":13,"deadlineDate":40,"budget":92,"status":16},4554732,"08国補地道第08-03-003-0-051号 07国補地道第07-03-003-A-057号 合併 橋梁設計業務委託(横塚橋)","茨城県 土木部 境工事事務所",29051000,{"id":94,"title":95,"organizationName":96,"prefectureName":12,"publishedDate":13,"deadlineDate":40,"budget":97,"status":16},4554731,"08国補地道 第08-03-394-0-051号 土地評価業務委託","茨城県 土木部 竜ヶ崎工事事務所",5907000,[99,105,109,113,117],{"id":100,"title":101,"organizationName":102,"prefectureName":12,"publishedDate":103,"deadlineDate":40,"budget":104,"status":16},4398620,"【とりおり2\u002F3・情報共有・週休2日・熱中症補正】08県単道修 第08-55-657-0-002号 道路除草工事","茨城県 土木部 高萩工事事務所","2026-09-03T15:00:00.000Z",7645000,{"id":106,"title":107,"organizationName":102,"prefectureName":12,"publishedDate":103,"deadlineDate":40,"budget":108,"status":16},4398619,"【とりおり1\u002F3・情報共有・週休2日・熱中症補正】08県単道修 第08-55-656-0-002号 道路除草工事",7953000,{"id":110,"title":111,"organizationName":102,"prefectureName":12,"publishedDate":103,"deadlineDate":40,"budget":112,"status":16},4398618,"【とりおり3\u002F3・情報共有・週休2日・熱中症補正】08県単道修 第08-55-658-0-002号 道路除草工事",6842000,{"id":114,"title":115,"organizationName":102,"prefectureName":12,"publishedDate":103,"deadlineDate":40,"budget":116,"status":16},4393802,"【とりおり4\u002F4・情報共有・週休2日・熱中症補正】08県単道修 第08-55-662-0-002号 08県単道修 第08-55-605-0-001号 合併 道路除草工事",7909000,{"id":118,"title":119,"organizationName":102,"prefectureName":12,"publishedDate":103,"deadlineDate":40,"budget":120,"status":16},4393801,"【とりおり3\u002F4・情報共有・週休2日・熱中症補正】08県単道修 第08-55-655-0-002号 道路除草工事",7997000,[122,128,134,140],{"title":123,"link":124,"date":125,"thumb":126,"cat":127},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":129,"link":130,"date":131,"thumb":132,"cat":133},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":135,"link":136,"date":137,"thumb":138,"cat":139},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":141,"link":142,"date":143,"thumb":144,"cat":145},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]