[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-4550596":3,"bid-history-4550596":36,"bid-related-4550596":40,"union-latest":115},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":11,"bidCategoryName":17,"bidTypeName":18,"categoryText":19,"regionText":20,"deadlineTime":21,"openingDate":22,"qualificationText":23,"aiSummary":24,"aiSummaryGated":25,"aiSummaryTruncated":26,"sourceUrl":27,"dataSourceCode":28,"budgetTaxIncluded":15,"documentUrls":29,"businessExperience":26,"localOffice":31,"securityRequirement":31,"qualifications":32,"certifications":33,"organization":34},4550596,"(二)市川水系 市川 テレメータ装置更新工事",2683,28,2,23,1,"兵庫県 中播磨県民センター 本局(総務防災課 - 土木・まちづくり)","兵庫県","2026-09-06T15:00:00.000Z","2026-09-17T15:00:00.000Z",null,"active","通信","一般競争入札","電気通信","姫路市北条","17:00:00","2026-10-12T15:00:00.000Z","・兵庫県の建設工事入札参加資格者名簿に登載されていること\n・地方自治法施行令第167条の４に基づく入札参加資格制限に該当しないこと\n・建設業法に基づく電気通信工事業に係る建設業の許可を有すること\n・入札参加資格者名簿における工種が電気通信工事であること\n・総合評定値通知書の有効期間が契約締結予定日（令和8年10月下旬）まであること\n・電気通信工事における総合評定値が600点以上であること\n・平成23年度以降にテレメータ設備工事を元請として完成した施工実績を有すること（共同企業体の場合は出資比率20パーセント以上）\n・県の指名停止基準に基づく指名停止を受けていないこと\n・会社更生法に基づく更生手続開始の申立て等がなされていないこと\n・本件工事に係る設計業務等の受託者でなく、かつ当該受託者との資本関係・人的関係がないこと\n・電気通信工事に係る低入札価格調査基準価格を下回った価格で契約を締結した工事を申込期限日までに完了しない場合は、平均工事成績点が65点以上であること\n・電子署名及び認証業務に関する法律に基づき認定を受けた特定認証業務を行う者が発行したICカードを電子入札システムに登録していること\n・資本関係又は人的関係がある者同士の同一入札への参加を制限する運用基準に該当しないこと\n・配置予定技術者として平成23年度以降にテレメータ設備工事を元請として完成した施工実績を有する者を配置できること\n・配置予定技術者は直接的かつ恒常的な雇用関係（申込期限日以前に3か月以上）がある者であること\n・現場代理人を適正に配置できること\n・現場代理人は直接的かつ恒常的な雇用関係（申込期限日以前に3か月以上）がある者であること\n・単独企業による申込み","【案件概要】\n兵庫県中播磘県民センターが実施する公募型一般競争入札（事後審査型）。（二）市川水系市川他テレメータ装置更新工事の発注。工事場所は姫路市北条。監視局装置更新1.0式を実施する。本件工事はフレックス方式を採用し、受注者が工期の始期日及び終期日を任意に設定できる。全体工期は令和9年3月25日まで。電子入札システムにより入札参加申込み及び入札書の提出を","実施。\n\n【業務内容】\n- 監視局装置更新 1.0式\n- テレメータ装置の更新工事\n\n【応募要件】\n- 兵庫県の建設工事入札参加資格者名簿に登載されていること\n- 建設業法に基づく電気通信工事業に係る建設業の許可を有すること\n- 入札参加資格者名簿の電気通信工事における総合評定値が600点以上であること\n- 平成23年度以降にテレメータ設備工事を元請として完成した施工実績を有すること（共同企業体の場合は出資比率20パーセント以上）\n- 県の指名停止基準に基づく指名停止を受けていないこと\n- 会社更生法に基づく更生手続開始の申立て等がなされていないこと\n- 本件工事に係る設計業務等の受託者でないこと\n- 電子署名及び認証業務に関する法律に基づき認定を受けた特定認証業務を行う者が発行したICカードを電子入札システムに登録していること\n- 配置予定技術者として平成23年度以降にテレメータ設備工事を元請として完成した施工実績を有する者を配置できること\n- 現場代理人を適正に配置できること\n- 単独企業による申込み\n\n【工期・期間】\n全体工期：令和9年3月25日まで（余裕期間：契約締結日から工期の始期日の前日まで）\n入札参加申込期間：令和8年9月7日（月）から9月18日（金）まで（午前9時から午後5時まで）\n入札期間：令和8年10月8日（木）から10月9日（金）まで（10月9日は正午まで）\n開札日時：令和8年10月13日（火）午前10時00分",true,"(redacted)","ppi-core-hyogo",[30],{"url":27,"name":27},false,[],[],{"id":6,"name":11,"categoryId":35,"parentId":15,"parentName":15,"bidInfoUrl":15},15,[37],{"year":38,"count":39},2026,43,{"sameOrganization":41,"samePrefecture":63,"similar":84},[42,46,50,55,60],{"id":43,"title":44,"organizationName":11,"prefectureName":12,"publishedDate":45,"deadlineDate":15,"budget":15,"status":16},4071380,"姫路港 広畑港区 広畑-7.5m岸壁修繕工事","2026-08-27T15:00:00.000Z",{"id":47,"title":48,"organizationName":11,"prefectureName":12,"publishedDate":45,"deadlineDate":49,"budget":15,"status":16},4036922,"(二)夢前川水系 夢前川 護岸修繕工事その2","2026-09-14T15:00:00.000Z",{"id":51,"title":52,"organizationName":11,"prefectureName":12,"publishedDate":53,"deadlineDate":54,"budget":15,"status":16},4032477,"兵庫西流域下水汚泥広域処理場第1ケーキ貯留棟No1,2汚 泥用天井クレーン設備改築工事","2026-08-26T15:00:00.000Z","2026-10-06T15:00:00.000Z",{"id":56,"title":57,"organizationName":11,"prefectureName":12,"publishedDate":58,"deadlineDate":59,"budget":15,"status":16},4026621,"揖保川浄化センター他場内整備工事","2026-08-24T15:00:00.000Z","2026-09-08T15:00:00.000Z",{"id":61,"title":62,"organizationName":11,"prefectureName":12,"publishedDate":58,"deadlineDate":59,"budget":15,"status":16},4022894,"(主)宍粟香寺線 道路改良工事",[64,69,74,78,81],{"id":65,"title":66,"organizationName":67,"prefectureName":12,"publishedDate":68,"deadlineDate":15,"budget":15,"status":16},2954301,"播磨中継加圧ポンプ場電気設備更新工事","兵庫県 企業庁 利水事務所","2027-03-24T15:00:00.000Z",{"id":70,"title":71,"organizationName":72,"prefectureName":12,"publishedDate":13,"deadlineDate":73,"budget":15,"status":16},4554393,"小中学校理科教育振興法に基づく備品","宝塚市","2026-09-30T15:00:00.000Z",{"id":75,"title":76,"organizationName":77,"prefectureName":12,"publishedDate":13,"deadlineDate":15,"budget":15,"status":16},4550595,"(二)武庫川水系武庫川 堆積土砂撤去工事(井ノ草)","兵庫県 阪神北県民局 本局(総務防災課 - 土木・まちづくり)",{"id":79,"title":80,"organizationName":77,"prefectureName":12,"publishedDate":13,"deadlineDate":15,"budget":15,"status":16},4550594,"(二)武庫川水系武庫川 高水敷保全工事",{"id":82,"title":83,"organizationName":77,"prefectureName":12,"publishedDate":13,"deadlineDate":15,"budget":15,"status":16},4550593,"(一)淀川水系昆陽川捷水路 捷水路修繕工事(その2)",[85,91,94,102,108],{"id":86,"title":87,"organizationName":88,"prefectureName":89,"publishedDate":13,"deadlineDate":90,"budget":15,"status":16},4532324,"市川水道事務所葛南支所管内漏水調査業務委託","千葉県 企業局管理部 市川水道事務所","千葉県","2026-10-05T15:00:00.000Z",{"id":92,"title":93,"organizationName":88,"prefectureName":89,"publishedDate":13,"deadlineDate":90,"budget":15,"status":16},4532323,"市川水道事務所松戸支所管内漏水調査業務委託",{"id":95,"title":96,"organizationName":97,"prefectureName":98,"publishedDate":99,"deadlineDate":100,"budget":101,"status":16},4379379,"上水道施設テレメータ改良工事(その１)","宇治市","京都府","2026-09-03T15:00:00.000Z","2026-09-09T15:00:00.000Z",59235000,{"id":103,"title":104,"organizationName":105,"prefectureName":106,"publishedDate":107,"deadlineDate":100,"budget":15,"status":16},4364503,"大気汚染常時監視テレメータシステムの賃貸借ほか1件","埼玉県川越市","埼玉県","2026-09-02T15:00:00.000Z",{"id":109,"title":110,"organizationName":111,"prefectureName":98,"publishedDate":112,"deadlineDate":113,"budget":114,"status":16},4368897,"テレメータ設備点検整備（松ケ崎浄水場）","京都市","2026-09-01T15:00:00.000Z","2026-09-13T15:00:00.000Z",1069000,[116,122,128,134],{"title":117,"link":118,"date":119,"thumb":120,"cat":121},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":123,"link":124,"date":125,"thumb":126,"cat":127},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":129,"link":130,"date":131,"thumb":132,"cat":133},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":135,"link":136,"date":137,"thumb":138,"cat":139},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]