[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-4399069":3,"bid-related-4399069":35,"bid-history-4399069":82,"union-latest":86},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":17,"bidCategoryName":18,"bidTypeName":19,"categoryText":20,"regionText":21,"deadlineTime":15,"openingDate":22,"qualificationText":23,"aiSummary":24,"aiSummaryGated":25,"aiSummaryTruncated":26,"sourceUrl":27,"dataSourceCode":28,"budgetTaxIncluded":15,"documentUrls":29,"businessExperience":26,"localOffice":26,"securityRequirement":31,"qualifications":32,"certifications":33,"organization":34},4399069,"狩場台特1高層高区配水場場内整備工事",3472,28,2,14,1,"神戸市","兵庫県","2026-09-01T15:00:00.000Z","2026-09-24T15:00:00.000Z",null,"active","神戸市水道事業管理者（発注担当：神戸市行財政局契約監理課）","土木","一般競争入札","工事","神戸市西区狩場台1丁目56番地","2026-09-29T15:00:00.000Z","・単独企業であること\n・土木工事業の許可を有し、登録業種が土木一般で等級がB又はCであること\n・有効な経営事項審査の結果を有すること\n・神戸市内に本店を有すること\n・共通事項の本市工事成績による入札制限の条件を満たすこと（令和3年4月1日以降の実績が対象）\n・資本関係・人的関係調書（様式第4号）を提出すること\n・神戸市契約等からの暴力団関係者排除、労働者の適正な労働条件に係る誓約書(元請用)(様式第4号の2)を提出すること\n・入札参加申込の受付期間中に全ての提出書類を電子入札システムにより提出すること","【案件概要】\n神戸市水道事業管理者が、狩場台特1高層高区配水場場内整備工事について事後審査型制限付一般競争入札を実施。工事場所は神戸市西区狩場台1丁目56番地。予定価格は事後公表。工事完成期限は令和9年3月31日。入札参加資格は神戸市内に本店を有し、土木工事業の許可（等級B又はC）を持つ単独企業。\n\n【業務内容】\n- 作業土工\n- 構造物撤去工\n- 植栽撤去","工\n- 舗装工\n- 施設工\n\n【応募要件】\n- 形態：単独企業\n- 土木工事業の許可を有すること（等級B又はC）\n- 有効な経営事項審査の結果を有すること\n- 神戸市内に本店を有すること\n- 登録業種：土木一般\n- 共通事項の本市工事成績による入札制限の条件を満たすこと（指定日：令和3年4月1日以降の実績が対象）\n- 資本関係・人的関係調書（様式第4号）を提出すること\n- 神戸市契約等からの暴力団関係者排除、労働者の適正な労働条件に係る誓約書(元請用)(様式第4号の2)を提出すること\n\n【工期・期間】\n契約締結日から令和9年3月31日まで。余裕期間制度の適用については共通事項及び特記仕様書に定めるところによる。",true,"(redacted)","e-hyogo",[30],{"url":27,"name":27},false,[],[],{"id":6,"name":11,"categoryId":15,"parentId":15,"parentName":15,"bidInfoUrl":15},{"sameOrganization":36,"samePrefecture":57,"similar":81},[37,42,46,50,53],{"id":38,"title":39,"organizationName":11,"prefectureName":12,"publishedDate":40,"deadlineDate":14,"budget":41,"status":16},4404555,"玉津処理場 送風機電気設備他更新工事","2026-09-03T15:00:00.000Z",192803000,{"id":43,"title":44,"organizationName":11,"prefectureName":12,"publishedDate":40,"deadlineDate":45,"budget":15,"status":16},4404553,"葺合中学校昇降路設置他工事","2026-09-28T15:00:00.000Z",{"id":47,"title":48,"organizationName":11,"prefectureName":12,"publishedDate":40,"deadlineDate":49,"budget":15,"status":16},4404552,"(仮称)いぶき明生支援学校分校設置工事","2026-10-07T15:00:00.000Z",{"id":51,"title":52,"organizationName":11,"prefectureName":12,"publishedDate":40,"deadlineDate":45,"budget":15,"status":16},4404551,"(仮称)からと中央住宅4号棟給排水ガス設備工事",{"id":54,"title":55,"organizationName":11,"prefectureName":12,"publishedDate":40,"deadlineDate":56,"budget":15,"status":16},4404550,"令和8年度農道舗装工事","2026-09-14T15:00:00.000Z",[58,63,67,71,75],{"id":59,"title":60,"organizationName":61,"prefectureName":12,"publishedDate":62,"deadlineDate":15,"budget":15,"status":16},2954301,"播磨中継加圧ポンプ場電気設備更新工事","兵庫県 企業庁 利水事務所","2027-03-24T15:00:00.000Z",{"id":64,"title":65,"organizationName":11,"prefectureName":12,"publishedDate":40,"deadlineDate":56,"budget":66,"status":16},4404549,"神戸空港島北側施設整備工事",11733000,{"id":68,"title":69,"organizationName":11,"prefectureName":12,"publishedDate":40,"deadlineDate":56,"budget":70,"status":16},4399063,"二瀬橋補修工事",36880000,{"id":72,"title":73,"organizationName":11,"prefectureName":12,"publishedDate":40,"deadlineDate":74,"budget":15,"status":16},4393789,"新在家南町3丁目地区他汚水管改築工事","2026-09-30T15:00:00.000Z",{"id":76,"title":77,"organizationName":78,"prefectureName":12,"publishedDate":40,"deadlineDate":79,"budget":80,"status":16},4393783,"令和8年度市営天神川第2団地2・3号館外壁及び屋上防水改修工事","伊丹市","2026-09-13T15:00:00.000Z",130100000,[],[83],{"year":84,"count":85},2026,30,[87,93,99,105],{"title":88,"link":89,"date":90,"thumb":91,"cat":92},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":94,"link":95,"date":96,"thumb":97,"cat":98},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":100,"link":101,"date":102,"thumb":103,"cat":104},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":106,"link":107,"date":108,"thumb":109,"cat":110},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]