[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-4363544":3,"bid-history-4363544":36,"bid-related-4363544":40,"union-latest":77},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":17,"bidCategoryName":18,"bidTypeName":19,"categoryText":20,"regionText":11,"deadlineTime":21,"openingDate":22,"qualificationText":23,"aiSummary":24,"aiSummaryGated":25,"aiSummaryTruncated":26,"sourceUrl":27,"dataSourceCode":28,"budgetTaxIncluded":15,"documentUrls":29,"businessExperience":26,"localOffice":26,"securityRequirement":31,"qualifications":32,"certifications":33,"organization":34},4363544,"松渕川公園施設改築工事(8−1)",3246,39,2,17,1,"高知県高知市","高知県","2026-09-02T15:00:00.000Z","2026-09-17T15:00:00.000Z",null,"active","高知市総務部契約課","造園","一般競争入札","工事","17:00:00","2026-09-23T15:00:00.000Z","・高知市内に主たる営業所（本社）を有する単体の建設業者であること\n・造園工事の建設業許可を有すること（特定又は一般）\n・公告日時点の格付等級がB、A又はC級の者（C級の場合は造園工事の2年又は3年平均完成工事高が900万円以上であること）\n・平成23年4月1日以降に、元請として完成・引渡しが完了した造園工事の施工実績を有すること\n・過去実績工事の発注者が国又は地方公共団体等であること\n・実績工事の最終請負金額（税込）が300万円以上であること\n・配置技術者は本工事の許可業種に係る建設業法第26条の主任技術者又は監理技術者資格を保有する者\n・監理技術者として配置する場合は、造園工事における監理技術者資格者証及び監理技術者講習修了証を保有すること\n・配置技術者は入札資格要件確認時点で雇用されていること\n・請負代金が4,500万円以上の場合、配置技術者は専任配置とし、公告日の3ヶ月以上前から申請者との雇用関係が継続している者であること","【案件概要】\n高知市が松渕川公園施設改築工事（8−1）について、電子入札による事後審査型制限付き一般競争入札を実施する。工事場所は高知市本町二丁目で、複合遊具1基の設置と土舗装111㎡の施工が対象。予定価格及び最低制限価格は事後公表される。公告日は令和8年9月3日で、完成期限は令和9年2月28日。本工事は週休2日制工事（月単位）として実施される。\n\n【業務内","容】\n- 複合遊具N=1基の設置\n- 土舗装A=111㎡の施工\n- 施設整備に係る造園工事一式\n\n【応募要件】\n- 高知市内に主たる営業所（本社）を有する単体の建設業者\n- 造園工事の建設業許可を有すること（特定又は一般）\n- 公告日時点の格付等級がB、A又はC級の者（C級の場合は造園工事の2年又は3年平均完成工事高が900万円以上）\n- 平成23年4月1日以降に、元請として完成・引渡しが完了した造園工事の施工実績を有すること\n- 過去実績は国又は地方公共団体等からの受注であることが必須\n- 実績工事の最終請負金額（税込）が300万円以上であること\n- 配置技術者は本工事の許可業種に係る建設業法第26条の主任技術者又は監理技術者資格を保有する者\n- 監理技術者として配置する場合は、造園工事における監理技術者資格者証及び監理技術者講習修了証を保有すること\n- 配置技術者は入札資格要件確認時点で雇用されていること\n- 請負代金が4,500万円以上の場合、配置技術者は専任配置とし、公告日の3ヶ月以上前から雇用関係が継続している者であること\n\n【工期・期間】\n完成期限：令和9年2月28日\n設計図書閲覧：令和8年9月3日9時00分から開札日時まで\n質疑受付：令和8年9月3日9時00分から9月10日12時00分まで\n入札書提出受付期間：令和8年9月16日8時00分から9月18日17時00分まで\n開札日時：令和8年9月24日10時50分\n予定価格に係る積算疑義申立期間：令和8年9月24日13時00分から9月25日16時00分まで",true,"(redacted)","kkj",[30],{"url":27,"name":27},false,[],[],{"id":6,"name":11,"categoryId":35,"parentId":15,"parentName":15,"bidInfoUrl":15},52,[37],{"year":38,"count":39},2026,45,{"sameOrganization":41,"samePrefecture":57,"similar":76},[42,45,48,51,54],{"id":43,"title":44,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},4363550,"高知市斎場火葬棟トイレ等改修電気設備工事",{"id":46,"title":47,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},4363549,"江ノ口鴨田堰ゲート操作盤更新工事",{"id":49,"title":50,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},4363548,"朝倉丙字明法谷測量設計委託業務",{"id":52,"title":53,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},4363547,"神田地区がけくずれ災害復旧工事​​",{"id":55,"title":56,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},4363546,"高須102号線道路改良工事​​",[58,61,64,67,70],{"id":59,"title":60,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},4363545,"わんぱーくこうち管理棟ウッドデッキほか改修工事",{"id":62,"title":63,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},4363543,"横浜二号公園施設改築工事(8−1)",{"id":65,"title":66,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},4363542,"春野町弘岡下中央墓地公園区画変状に伴う地盤調査委託業務",{"id":68,"title":69,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},4363541,"内ノ谷地区中継ポンプ更新工事",{"id":71,"title":72,"organizationName":73,"prefectureName":12,"publishedDate":74,"deadlineDate":75,"budget":15,"status":16},4295876,"(こ第08054号)野市東こども園4・5歳児棟外壁等改修工事【9月2日公告】","高知県香南市","2026-09-01T15:00:00.000Z","2026-10-06T15:00:00.000Z",[],[78,84,90,96],{"title":79,"link":80,"date":81,"thumb":82,"cat":83},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":85,"link":86,"date":87,"thumb":88,"cat":89},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":91,"link":92,"date":93,"thumb":94,"cat":95},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":97,"link":98,"date":99,"thumb":100,"cat":101},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]