[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-4352675":3,"bid-history-4352675":37,"bid-related-4352675":41,"union-latest":120},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":17,"bidCategoryName":18,"bidTypeName":19,"categoryText":20,"regionText":21,"deadlineTime":22,"openingDate":23,"qualificationText":24,"aiSummary":25,"aiSummaryGated":26,"aiSummaryTruncated":27,"sourceUrl":28,"dataSourceCode":29,"budgetTaxIncluded":30,"documentUrls":31,"businessExperience":30,"localOffice":27,"securityRequirement":30,"qualifications":33,"certifications":34,"organization":35},4352675,"【9\u002F1・上下水3】中筋5丁目地区雨水放流ゲート整備工事",3436,28,2,14,1,"高砂市","兵庫県","2026-08-31T15:00:00.000Z","2026-09-16T15:00:00.000Z",9089000,"active","高砂市上下水道部技術管理室管きょ課","土木","一般競争入札","工事","高砂市中筋5丁目地内","17:00:00","2026-09-23T15:00:00.000Z","・高砂市入札参加資格者名簿(建設工事)に土木一式工事で登録されていること\n・建設業法に規定する土木一式工事業において建設業許可を有すること\n・本店の所在地が高砂市内であること\n・開札日において土木一式工事に係る経営事項審査結果の総合評定値が1点以上649点以下であること\n・開札日において有効な経営規模等評価結果通知書の総合評定値通知書の写しが事前に高砂市契約管財課へ提出されていること\n・高砂市指名停止基準に基づく指名停止を公告日及び開札日のいずれにおいても受けていないこと\n・地方自治法施行令第167条の4に規定する資格制限に該当しないこと\n・会社更生法に基づく更生手続開始の申立てがなされていないこと及び民事再生法に基づく再生手続開始の申立てがなされていないこと\n・国税の納税証明書及び市税完納証明書の写しが開札日までに提出されていること\n・高砂市と契約した手持工事が4件以内であること\n・同一入札に参加する者が資本関係又は人的関係にないこと\n・配置予定技術者は土木工事業の主任技術者資格を有し高砂市に登録していること\n・配置予定技術者は開札日において他の工事に専任配置されていないこと","【案件概要】\n高砂市が中筋5丁目地区雨水放流ゲート整備工事の地域公募型条件付一般競争入札(電子入札)を実施。工事場所は兵庫県高砂市中筋5丁目地内で、建設工事の種類は土木一式工事。予定価格は9,089,000円(税抜)。本店が高砂市内にある建設業許可取得企業が対象。工期は契約締結日の翌日から令和9年2月19日までの約150日間。\n\n【業務内容】\n- 放流ゲート","設置工　1式\n- 付帯工　1式\n\n【応募要件】\n- 高砂市入札参加資格者名簿(建設工事)に土木一式工事で登録されていること\n- 建設業法に規定する土木一式工事業において建設業許可を有すること\n- 本店の所在地が高砂市内であること\n- 開札日において土木一式工事に係る経営事項審査結果の総合評定値が1点以上649点以下であること\n- 開札日において有効な経営規模等評価結果通知書の総合評定値通知書の写しが事前に高砂市契約管財課へ提出されていること\n- 高砂市指名停止基準に基づく指名停止を公告日及び開札日のいずれにおいても受けていないこと\n- 地方自治法施行令第167条の4に規定する資格制限に該当しないこと\n- 会社更生法に基づく更生手続開始の申立てがなされていないこと及び民事再生法に基づく再生手続開始の申立てがなされていないこと(ただし、更生計画又は再生計画の認可の決定が参加申込期日以前になされている場合を除く)\n- 国税の納税証明書及び市税完納証明書の写しが開札日までに高砂市契約管財課へ提出されていること\n- 高砂市と契約した手持工事が4件以内であること\n- 同一入札に参加する者が資本関係又は人的関係にないこと\n- 配置予定技術者は土木工事業の主任技術者資格を有し高砂市に登録していること\n- 配置予定技術者は開札日において他の工事に専任配置されていないこと\n\n【工期・期間】\n申込期間：令和8年9月1日(火)から令和8年9月9日(水)まで、午前9時から午後8時(電子入札システム稼働時間内)。ただし紙入札の場合は午前9時から午後5時(正午から午後1時までを除く)。設計図書等閲覧期間：令和8年9月1日(火)から令和8年9月9日(水)。設計図書等に関する質問期間：令和8年9月1日(火)から令和8年9月9日(水)。入札受付期間：令和8年9月15日(火)午前9時から令和8年9月17日(木)午後5時(電子入札システム稼働時間内)。開札日時：令和8年9月24日(木)午前9時45分予定。工事工期：契約締結日の翌日から令和9年2月19日まで。",true,"(redacted)","e-hyogo",false,[32],{"url":28,"name":28},[],[],{"id":6,"name":11,"categoryId":36,"parentId":36,"parentName":36,"bidInfoUrl":36},null,[38],{"year":39,"count":40},2026,5,{"sameOrganization":42,"samePrefecture":62,"similar":86},[43,47,51,55],{"id":44,"title":45,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":46,"status":16},4358101,"【9\u002F1・市1】阿弥陀町地徳地内局部補修工事",8027000,{"id":48,"title":49,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":50,"status":16},4352677,"【9\u002F1・上下水2】日之出町地区他配水管布設替工事",111120000,{"id":52,"title":53,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":54,"status":16},4352676,"【9\u002F1・上下水1】曽根地区配水管布設替工事",120890000,{"id":56,"title":57,"organizationName":11,"prefectureName":12,"publishedDate":58,"deadlineDate":59,"budget":60,"status":61},4352674,"【8\u002F17・市】春日野・牛谷準幹線道路整備工事","2026-08-16T15:00:00.000Z","2026-09-02T15:00:00.000Z",120889000,"closed",[63,68,74,77,81],{"id":64,"title":65,"organizationName":66,"prefectureName":12,"publishedDate":67,"deadlineDate":36,"budget":36,"status":16},2954301,"播磨中継加圧ポンプ場電気設備更新工事","兵庫県 企業庁 利水事務所","2027-03-24T15:00:00.000Z",{"id":69,"title":70,"organizationName":71,"prefectureName":12,"publishedDate":72,"deadlineDate":73,"budget":36,"status":16},4384298,"【一般】姫路市営庄田住宅(第2期)中耐建替等(建築)工事(令和8年9月4日公告)","姫路市","2026-09-03T15:00:00.000Z","2026-10-18T15:00:00.000Z",{"id":75,"title":76,"organizationName":71,"prefectureName":12,"publishedDate":72,"deadlineDate":73,"budget":36,"status":16},4384297,"【一般】姫路市書写山観光施設大規模改修工事(令和8年9月4日公告)",{"id":78,"title":79,"organizationName":71,"prefectureName":12,"publishedDate":72,"deadlineDate":80,"budget":36,"status":16},4384296,"【一般】姫路市立中央体育館大規模改修等工事(令和8年9月4日公告)","2026-11-09T15:00:00.000Z",{"id":82,"title":83,"organizationName":84,"prefectureName":12,"publishedDate":72,"deadlineDate":85,"budget":36,"status":16},4379371,"R8国道29号狭戸地区物件調査等業務","国土交通省近畿地方整備局","2026-09-13T15:00:00.000Z",[87,93,99,107,114],{"id":88,"title":89,"organizationName":90,"prefectureName":91,"publishedDate":13,"deadlineDate":92,"budget":36,"status":16},4207135,"令和8年度 中筋川ダム外堆砂測量業務","国土交通省四国地方整備局","高知県","2026-09-10T15:00:00.000Z",{"id":94,"title":95,"organizationName":96,"prefectureName":97,"publishedDate":13,"deadlineDate":98,"budget":36,"status":16},4206117,"令和８年度上下水道局用地測量業務委託（単価契約）","川崎市","神奈川県","2026-09-07T15:00:00.000Z",{"id":100,"title":101,"organizationName":102,"prefectureName":103,"publishedDate":104,"deadlineDate":105,"budget":106,"status":16},4197839,"下野市上下水道料金徴収等業務委託プロポーザルの実施について","栃木県下野市","栃木県","2026-08-30T15:00:00.000Z","2026-10-20T15:00:00.000Z",155880000,{"id":108,"title":109,"organizationName":110,"prefectureName":111,"publishedDate":112,"deadlineDate":113,"budget":36,"status":61},3591780,"上下水道公営企業会計システム賃貸借","宮城県塩竃市","宮城県","2026-08-17T15:00:00.000Z","2026-08-19T15:00:00.000Z",{"id":115,"title":116,"organizationName":117,"prefectureName":118,"publishedDate":112,"deadlineDate":119,"budget":36,"status":16},3591191,"【上下水道局告示第122号】合流地区管渠改築工事(8-7工区)_下水道管渠維持補修_市内_単体 (PDF 138KB)","宮崎県宮崎市","宮崎県","2026-09-14T15:00:00.000Z",[121,127,133,139],{"title":122,"link":123,"date":124,"thumb":125,"cat":126},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":128,"link":129,"date":130,"thumb":131,"cat":132},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":134,"link":135,"date":136,"thumb":137,"cat":138},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":140,"link":141,"date":142,"thumb":143,"cat":144},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]