[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-4324579":3,"bid-related-4324579":35,"bid-history-4324579":76,"union-latest":80},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":8,"organizationName":10,"prefectureName":11,"publishedDate":12,"deadlineDate":13,"budget":14,"status":15,"department":16,"bidCategoryName":17,"bidTypeName":18,"categoryText":19,"regionText":20,"deadlineTime":21,"openingDate":22,"qualificationText":23,"aiSummary":24,"aiSummaryGated":25,"aiSummaryTruncated":26,"sourceUrl":27,"dataSourceCode":28,"budgetTaxIncluded":14,"documentUrls":29,"businessExperience":31,"localOffice":31,"securityRequirement":31,"qualifications":32,"certifications":33,"organization":34},4324579,"耐震性貯水槽更新工事(龍角寺)",2104,12,2,28,"栄町 企画財政課 企画財政課","千葉県","2026-09-02T15:00:00.000Z","2026-09-14T15:00:00.000Z",null,"active","栄町 企画財政課","その他工事","指名競争入札","建設工事（耐震性貯水槽更新工事）","千葉県印旛郡栄町龍角寺717","10:00:00","2026-09-15T15:00:00.000Z","・建設業の許可を有する企業であること\n・主任技術者等(建設業法第26条に規定する技術者)を設置できること\n・現場代理人を選定・配置できること\n・契約保証金の納付またはこれに代わる担保を提供できること(請負代金額の1\u002F10以上)\n・公正取引委員会による独占禁止法違反措置命令を受けていないこと\n・刑法第96条の6または第198条による刑が確定していないこと\n・暴力団または暴力団員が経営に実質的に関与していないこと\n・下請契約相手方の選定において暴力団関連者を排除していること","【案件概要】\n栄町企画財政課が発注する耐震性貯水槽更新工事(龍角寺)の建設工事請負契約。工事場所は千葉県印旛郡栄町龍角寺717番地。工期は契約締結日の翌日から令和9年3月19日までの約8ヶ月間。本案件は工事契約約款及び特約条項に基づき、標準的な建設工事請負契約として実施される。予算規模及び具体的な工事内容については、別紙設計図書及び仕様書を参照。\n\n【業務内","容】\n- 耐震性貯水槽の更新工事\n- 既設貯水槽の撤去・解体\n- 新規耐震性貯水槽の設置・施工\n- 建設工事に係る資材の再資源化等に関する法律に基づく解体工事手続き\n- 工事現場の管理・安全対策\n\n【応募要件】\n- 建設業の許可を有する企業（耐震性貯水槽工事に対応できる建設業者）\n- 主任技術者等(建設業法第26条に規定する技術者)を設置できること\n- 現場代理人を選定し配置できること\n- 契約保証金の納付またはこれに代わる担保を提供できること(請負代金の1\u002F10以上)\n- 公正取引委員会による独占禁止法違反措置命令を受けていないこと\n- 刑法第96条の6または第198条による刑が確定していないこと\n- 暴力団または暴力団員による経営への実質的関与がないこと\n\n【工期・期間】\n契約締結日の翌日から令和9年3月19日まで。工事の中止や工期延長の可能性があり、その場合は甲乙協議により変更される。主任技術者等は工事現場に常駐する必要があり、ただし甲の承諾があれば常駐を要しない場合もある。",true,"(redacted)","ppi-core-chiba",[30],{"url":27,"name":27},false,[],[],{"id":6,"name":10,"categoryId":14,"parentId":14,"parentName":14,"bidInfoUrl":14},{"sameOrganization":36,"samePrefecture":57,"similar":75},[37,40,46,49,53],{"id":38,"title":39,"organizationName":10,"prefectureName":11,"publishedDate":12,"deadlineDate":13,"budget":14,"status":15},4329680,"耐震性貯水槽新設工事(北)",{"id":41,"title":42,"organizationName":10,"prefectureName":11,"publishedDate":43,"deadlineDate":44,"budget":14,"status":45},3717692,"特定建築物定期報告調査業務委託","2026-08-20T15:00:00.000Z","2026-09-01T15:00:00.000Z","closed",{"id":47,"title":48,"organizationName":10,"prefectureName":11,"publishedDate":43,"deadlineDate":14,"budget":14,"status":15},3715311,"地籍調査支援システム賃貸借",{"id":50,"title":51,"organizationName":10,"prefectureName":11,"publishedDate":52,"deadlineDate":14,"budget":14,"status":15},3272772,"樹木管理業務委託(公園・緑地)","2026-08-04T15:00:00.000Z",{"id":54,"title":55,"organizationName":10,"prefectureName":11,"publishedDate":56,"deadlineDate":52,"budget":14,"status":45},2746613,"町道17001号線道路改良実施設計業務委託","2026-07-22T15:00:00.000Z",[58,63,66,69,72],{"id":59,"title":60,"organizationName":61,"prefectureName":11,"publishedDate":12,"deadlineDate":62,"budget":14,"status":15},4329485,"本庁舎1階レイアウト変更に伴う電気設備工事","成田市 総務部 契約検査課","2026-09-09T15:00:00.000Z",{"id":64,"title":65,"organizationName":61,"prefectureName":11,"publishedDate":12,"deadlineDate":62,"budget":14,"status":15},4329484,"内宿共同利用施設便所改修工事",{"id":67,"title":68,"organizationName":61,"prefectureName":11,"publishedDate":12,"deadlineDate":62,"budget":14,"status":15},4329483,"三里塚コミュニティセンター高圧ケーブル更新工事",{"id":70,"title":71,"organizationName":61,"prefectureName":11,"publishedDate":12,"deadlineDate":62,"budget":14,"status":15},4329482,"舗装修繕(江弁須珍重3号線)",{"id":73,"title":74,"organizationName":61,"prefectureName":11,"publishedDate":12,"deadlineDate":62,"budget":14,"status":15},4329481,"公園施設修繕(グリーンウォーターパーク他3公園)",[],[77],{"year":78,"count":79},2026,10,[81,87,93,99],{"title":82,"link":83,"date":84,"thumb":85,"cat":86},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":88,"link":89,"date":90,"thumb":91,"cat":92},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":94,"link":95,"date":96,"thumb":97,"cat":98},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":100,"link":101,"date":102,"thumb":103,"cat":104},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]