[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-4265726":3,"bid-related-4265726":42,"bid-history-4265726":112,"union-latest":116},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":11,"bidCategoryName":17,"bidTypeName":18,"categoryText":19,"regionText":20,"deadlineTime":21,"openingDate":14,"qualificationText":22,"aiSummary":23,"aiSummaryGated":24,"aiSummaryTruncated":25,"sourceUrl":26,"dataSourceCode":27,"budgetTaxIncluded":28,"documentUrls":29,"businessExperience":25,"localOffice":25,"securityRequirement":28,"qualifications":38,"certifications":39,"organization":40},4265726,"令和8年度 三尺南側用水路改修工事に伴う配水管切廻し工事",1778,11,2,20,1,"加須市 総合政策部 管理契約課","埼玉県","2026-09-01T15:00:00.000Z","2026-09-16T15:00:00.000Z",16940000,"active","管・空調","一般競争入札","管工事業（配水管布設工事、給排水設備工事）","加須市 細間外 地内","10:00:00","・施行令第167条の4に該当しない者であること\n・埼玉県内で建設業法に基づく営業停止処分を受けていないこと\n・加須市の契約に係る入札参加停止措置及び暴力団排除措置を受けていないこと\n・独占禁止法に基づく排除措置命令又は課徴金納付命令を受けていないこと\n・会社更生法及び民事再生法の再生手続開始申立てを受けていないこと（経営事項再審査を受けている場合を除く）\n・令和7・8年度加須市建設工事等競争入札参加資格者名簿に管工事業の給排水設備工事として登載されていること\n・管工事業の格付がB級以上であること\n・加須市内に契約権限を持つ本支店又は営業所を有し、社員を配置して営業活動を行っていること\n・過去5年度間（令和3年度～令和7年度）に、加須市発注の加須市内施工場所の請負代金額500万円以上の管布設工事又は管布設替工事を元請として受注し完成した実績があること\n・建設業法第26条に基づく配置技術者を配置できること（下請総額5,000万円以上の場合は監理技術者が必須）\n・建設業法等の関係法令を遵守し、技術者を適正に配置できること","【案件概要】\n加須市総合政策部管理契約課が発注する「令和8年度 三尺南側用水路改修工事に伴う配水管切廻し工事」の一般競争入札（事後審査型）。工事場所は加須市細間外地内で、予定価格は税抜16,940,000円。契約締結日から令和9年3月25日までの工事期間。電子入札システムにより実施され、令和8年9月2日に公告。\n\n【業務内容】\n- 配水管布設工事（総延長L=","56.1m、Φ150mm L=35.9m、Φ100mm L=12.2m、Φ75mm L=8.0m）\n- 仕切弁設置工（3箇所）\n- 排泥弁設置工（1箇所）\n- 仮設工事一式\n- 舗装本復旧工事一式\n\n【応募要件】\n- 令和7・8年度加須市建設工事等競争入札参加資格者名簿に、管工事業の給排水設備工事として登載されていること\n- 管工事業の格付がB級以上であること\n- 加須市内に契約権限を持つ本支店又は営業所を有し、社員を配置して営業活動を行っていること\n- 過去5年度間（令和3年度～令和7年度）に、加須市が発注した加須市内施工場所の請負代金額500万円以上の管布設工事又は管布設替工事を元請として受注し完成した実績があること\n- 建設業法第26条に基づく配置技術者を配置できること（下請総額5,000万円以上の場合は監理技術者が必須）\n- 建設業法等の関係法令を遵守し、技術者を適正に配置できること\n- 埼玉県内での営業停止処分、加須市の入札参加停止措置、独占禁止法関連の排除措置命令等を受けていないこと\n- 会社更生法又は民事再生法の再生手続開始申立てを受けていないこと（経営事項再審査を受けている場合を除く）\n\n【工期・期間】\n契約締結日から令和9年3月25日まで\n\n【入札スケジュール】\n- 設計図書公開開始：令和8年9月2日\n- 質問受付期間：令和8年9月2日午前9時～同月9日午後3時\n- 質問回答掲示：令和8年9月11日午後5時まで\n- 競争参加資格確認申請書提出期間：令和8年9月2日午前9時～同月14日午後5時\n- 入札書提出期間：令和8年9月15日午前9時～同月17日午前10時\n- 開札日時：令和8年9月17日午後2時20分\n- 審査書類提出期限：令和8年9月24日午後5時",true,"(redacted)","koukai-saitama",false,[30,31,32,33,34,35,36,37],{"url":26,"name":26},{"url":26,"name":26},{"url":26,"name":26},{"url":26,"name":26},{"url":26,"name":26},{"url":26,"name":26},{"url":26,"name":26},{"url":26,"name":26},[],[],{"id":6,"name":11,"categoryId":41,"parentId":41,"parentName":41,"bidInfoUrl":41},null,{"sameOrganization":43,"samePrefecture":65,"similar":90},[44,48,53,57,61],{"id":45,"title":46,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":47,"status":16},4265740,"令和8年度 市道騎3754号線側溝整備工事",8754000,{"id":49,"title":50,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":51,"budget":52,"status":16},4265739,"令和8年度 道通用排水路改修工事","2026-09-14T15:00:00.000Z",8551000,{"id":54,"title":55,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":56,"status":16},4265738,"令和8年度 上種足用水路改修工事(県補)",8539000,{"id":58,"title":59,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":60,"status":16},4265737,"令和8年度 南八ツ田用排水路改修工事",7564000,{"id":62,"title":63,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":64,"status":16},4265736,"令和8年度 嵯峨・柳町・休城用排水路改修工事",6050000,[66,72,77,80,84],{"id":67,"title":68,"organizationName":69,"prefectureName":12,"publishedDate":70,"deadlineDate":71,"budget":41,"status":16},4425133,"令和8年度マリンワーカー事業小笠原国立公園周辺海域における水温計測等業務","環境省関東地方環境事務所","2026-09-03T15:00:00.000Z","2026-09-13T15:00:00.000Z",{"id":73,"title":74,"organizationName":75,"prefectureName":12,"publishedDate":70,"deadlineDate":76,"budget":41,"status":16},4425132,"ヘリウム3ガス","国立研究開発法人理化学研究所","2026-09-23T15:00:00.000Z",{"id":78,"title":79,"organizationName":75,"prefectureName":12,"publishedDate":70,"deadlineDate":76,"budget":41,"status":16},4425131,"放射性同位体 Cf-252 非密封放射性線源",{"id":81,"title":82,"organizationName":75,"prefectureName":12,"publishedDate":70,"deadlineDate":83,"budget":41,"status":16},4425130,"局所排気装置及び特定施設の点検等業務","2026-09-24T15:00:00.000Z",{"id":85,"title":86,"organizationName":87,"prefectureName":12,"publishedDate":70,"deadlineDate":88,"budget":89,"status":16},4425129,"管財課:【第468号】旧春日部市勤労者会館用地測量業務委託","埼玉県春日部市","2026-09-27T15:00:00.000Z",6498800,[91,97,101,104,108],{"id":92,"title":93,"organizationName":94,"prefectureName":94,"publishedDate":70,"deadlineDate":95,"budget":96,"status":16},4439192,"公告日 令和8\u002F9\u002F4 【一抜け方式対象案件】 令和8年度宮川堰堤維持 第13001-04分2009号 宮川ダム単価契約河川等図面作成業務委託(その2)","三重県","2026-09-17T15:00:00.000Z",65927,{"id":98,"title":99,"organizationName":94,"prefectureName":94,"publishedDate":70,"deadlineDate":14,"budget":100,"status":16},4439191,"公告日 令和8\u002F9\u002F4 【一抜け方式対象案件】 令和8年度県単河川(緊自) 第13001- 分2004号 一級河川宮川ほか単価契約河川等積算資料作成業務委託(その2)",948759,{"id":102,"title":103,"organizationName":94,"prefectureName":94,"publishedDate":70,"deadlineDate":14,"budget":100,"status":16},4439190,"公告日 令和8\u002F9\u002F4 【一抜け方式対象案件】 令和8年度県単河川(緊自) 第21001- 分2004号 二級河川三渡川ほか単価契約河川等積算資料作成業務委託(その2)",{"id":105,"title":106,"organizationName":94,"prefectureName":94,"publishedDate":70,"deadlineDate":95,"budget":107,"status":16},4439189,"公告日 令和8\u002F9\u002F4 【一抜け方式対象案件】 令和8年度公共土木施設維管 第10166- 1分2004号 一般国道166号ほか単価契約道路図面作成業務委託(その2)",8989,{"id":109,"title":110,"organizationName":94,"prefectureName":94,"publishedDate":70,"deadlineDate":14,"budget":111,"status":16},4439188,"公告日 令和8\u002F9\u002F4 【一抜け方式対象案件】 令和8年度公共土木施設維管 第20024-01分2009号 主要地方道松阪久居線ほか単価契約道路等積算資料作成業務委託(その2)",788154,[113],{"year":114,"count":115},2026,73,[117,123,129,135],{"title":118,"link":119,"date":120,"thumb":121,"cat":122},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":124,"link":125,"date":126,"thumb":127,"cat":128},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":130,"link":131,"date":132,"thumb":133,"cat":134},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":136,"link":137,"date":138,"thumb":139,"cat":140},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]