[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-4212608":3,"bid-history-4212608":29,"bid-related-4212608":30,"union-latest":81},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":6,"prefectureName":11,"publishedDate":6,"deadlineDate":12,"budget":6,"status":13,"department":14,"bidCategoryName":15,"bidTypeName":16,"categoryText":17,"regionText":18,"deadlineTime":6,"openingDate":19,"qualificationText":6,"aiSummary":20,"aiSummaryGated":21,"aiSummaryTruncated":22,"sourceUrl":23,"dataSourceCode":24,"budgetTaxIncluded":6,"documentUrls":25,"businessExperience":26,"localOffice":26,"securityRequirement":26,"qualifications":27,"certifications":28,"organization":6},4212608,"西土117 令和8年度 急傾斜地崩壊対策工事 県単(その2)地質調査業務委託",null,14,7,39,1,"神奈川県","2026-08-19T15:00:00.000Z","closed","神奈川県県土整備局県西土木事務所","測量","一般競争入札","地質調査（機器を用いる地質分析等）","（仮称）急傾斜地崩壊危険区域　塚原・岩原地区　南足柄市塚原・岩原地内","2026-09-03T15:00:00.000Z","【案件概要】\n神奈川県県土整備局県西土木事務所が、急傾斜地崩壊対策工事に関する地質調査業務委託について一般競争入札（標準型）を実施する。南足柄市塚原・岩原地区の急傾斜地崩壊危険区域を対象とした地質調査業務である。令和8年8月20日が参加資格申請期限、9月4日が開札予定日、12月11日が履行期限となっている。予定価格・設計金額は非公表。\n\n【業務内容】\n- 急","傾斜地崩壊危険区域における地質調査\n- 機器を用いた地質分析\n- 対象地区：南足柄市塚原・岩原地内\n\n【工期・期間】\n履行期限：令和8年12月11日まで",true,"(redacted)","kanagawa-e-nyusatsu",[],false,[],[],[],{"sameOrganization":31,"samePrefecture":32,"similar":57},[],[33,39,44,48,52],{"id":34,"title":35,"organizationName":36,"prefectureName":11,"publishedDate":19,"deadlineDate":37,"budget":6,"status":38},4426785,"ノートパソコン一式の供給","国立大学法人横浜国立大学","2026-10-01T15:00:00.000Z","active",{"id":40,"title":41,"organizationName":42,"prefectureName":11,"publishedDate":19,"deadlineDate":43,"budget":6,"status":38},4424208,"令和8年度小田原公共職業安定所外4拠点のレイアウト変更に伴う新規什器の購入 、搬入・設置及び既存什器の移設作業一式","厚生労働省","2026-09-29T15:00:00.000Z",{"id":45,"title":46,"organizationName":42,"prefectureName":11,"publishedDate":19,"deadlineDate":47,"budget":6,"status":38},4424207,"令和8~12年度川崎北公共職業安定所外1所における業務用自動車 賃貸借業務一式","2026-10-04T15:00:00.000Z",{"id":49,"title":50,"organizationName":51,"prefectureName":11,"publishedDate":19,"deadlineDate":43,"budget":6,"status":38},4424206,"横浜地方裁判所管内の簡易裁判所庁舎で使用する電気(低圧電力等)需給契約","最高裁判所",{"id":53,"title":54,"organizationName":55,"prefectureName":11,"publishedDate":19,"deadlineDate":56,"budget":6,"status":38},4390548,"令和８年横浜市長選挙における泉区期日前投票所への人材派遣について","横浜市","2026-09-10T15:00:00.000Z",[58,63,69,74,77],{"id":59,"title":60,"organizationName":6,"prefectureName":61,"publishedDate":19,"deadlineDate":62,"budget":6,"status":38},4442287,"令和8年度和歌山県農林大学校講習に係る重機回送2業務委託","和歌山県","2026-09-09T15:00:00.000Z",{"id":64,"title":65,"organizationName":66,"prefectureName":66,"publishedDate":19,"deadlineDate":67,"budget":68,"status":38},4439192,"公告日 令和8\u002F9\u002F4 【一抜け方式対象案件】 令和8年度宮川堰堤維持 第13001-04分2009号 宮川ダム単価契約河川等図面作成業務委託(その2)","三重県","2026-09-17T15:00:00.000Z",65927,{"id":70,"title":71,"organizationName":66,"prefectureName":66,"publishedDate":19,"deadlineDate":72,"budget":73,"status":38},4439191,"公告日 令和8\u002F9\u002F4 【一抜け方式対象案件】 令和8年度県単河川(緊自) 第13001- 分2004号 一級河川宮川ほか単価契約河川等積算資料作成業務委託(その2)","2026-09-16T15:00:00.000Z",948759,{"id":75,"title":76,"organizationName":66,"prefectureName":66,"publishedDate":19,"deadlineDate":72,"budget":73,"status":38},4439190,"公告日 令和8\u002F9\u002F4 【一抜け方式対象案件】 令和8年度県単河川(緊自) 第21001- 分2004号 二級河川三渡川ほか単価契約河川等積算資料作成業務委託(その2)",{"id":78,"title":79,"organizationName":66,"prefectureName":66,"publishedDate":19,"deadlineDate":67,"budget":80,"status":38},4439189,"公告日 令和8\u002F9\u002F4 【一抜け方式対象案件】 令和8年度公共土木施設維管 第10166- 1分2004号 一般国道166号ほか単価契約道路図面作成業務委託(その2)",8989,[82,88,94,100],{"title":83,"link":84,"date":85,"thumb":86,"cat":87},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":89,"link":90,"date":91,"thumb":92,"cat":93},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":95,"link":96,"date":97,"thumb":98,"cat":99},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":101,"link":102,"date":103,"thumb":104,"cat":105},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]