[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-4049836":3,"bid-history-4049836":36,"bid-related-4049836":40,"union-latest":83},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":17,"bidCategoryName":18,"bidTypeName":19,"categoryText":20,"regionText":11,"deadlineTime":21,"openingDate":22,"qualificationText":23,"aiSummary":24,"aiSummaryGated":25,"aiSummaryTruncated":26,"sourceUrl":27,"dataSourceCode":28,"budgetTaxIncluded":15,"documentUrls":29,"businessExperience":26,"localOffice":26,"securityRequirement":26,"qualifications":31,"certifications":33,"organization":34},4049836,"初月分区汚水管渠築造工事(R8-1)",3246,39,2,26,1,"高知県高知市","高知県","2026-08-16T15:00:00.000Z","2026-08-31T15:00:00.000Z",null,"closed","高知市上下水道局企画財務課","下水道","一般競争入札","工事","17:00:00","2026-09-01T15:00:00.000Z","・高知市内に主たる営業所(本社)を有すること\n・土木一式工事の建設業許可(特定又は一般)を有すること\n・公告日時点における格付け等級がB級又はA級であること\n・シールド工法又は推進工法による上水道又は下水道管布設工を含む工事の施工実績を有すること(小口径管・高耐荷力方式による推進工法の経験)\n・請負金額3,500万円以上の下水道本管布設工を含む工事の施工実績を有すること\n・本工事の許可業種に係る建設業法第26条規定による主任技術者又は監理技術者資格要件を満たす技術者を配置できること\n・シールド工法又は推進工法による上下水道管布設工を含む工事における現場代理人又は技術者(主任技術者又は監理技術者)の従事経験を有すること\n・請負金額3,500万円以上の土木一式工事における現場代理人又は技術者(主任技術者又は監理技術者)としての従事経験を有し、かつ公益社団法人日本推進技術協会に登録された推進工事技士であること\n・個人情報の取扱いに係る安全管理措置に関する誓約書を契約締結までに提出すること\n・独占禁止法の遵守に係る誓約書を契約締結までに提出すること","【案件概要】\n高知市上下水道局が初月分区汚水管渠築造工事(R8-1)の電子入札による事後審査型制限付き一般競争入札を実施する。工事場所は高知市福井扇町・福井町地先であり、推進工法及び布設工による汚水管整備工事である。公告日は令和8年8月17日、入札書受付期間は令和8年8月28日8時00分から令和8年9月1日17時00分まで、開札予定日時は令和8年9月2日11","時00分である。工期は160日間で、予定価格及び最低制限価格は事後公表となる。本工事は個人情報取扱工事に該当し、セキュリティ関連の誓約書提出が必須である。\n\n【業務内容】\n- 内径250mm汚水管推進工（小口径管・高耐荷力方式）11.0m\n- 立坑工1箇所\n- 内径200mm汚水管布設工78.6m\n- 内径150mm汚水管布設工194.9m\n- 人孔設置工10箇所\n- 汚水取付管布設工22箇所\n- 付帯工1式\n\n【応募要件】\n- 高知市内に主たる営業所(本社)を有する者\n- 土木一式工事の建設業許可を有する者（特定又は一般）\n- 公告日時点における格付け等級がB級又はA級の者\n- シールド工法又は推進工法による上水道又は下水道管布設工を含む工事の施工実績を有する者（小口径管・高耐荷力方式による推進工法の経験が必要）\n- 請負金額3,500万円以上の下水道本管布設工を含む工事の施工実績を有する者\n- 本工事の許可業種に係る建設業法第26条規定による主任技術者又は監理技術者資格保有者を配置できる者\n- シールド工法又は推進工法による上下水道管布設工を含む工事の現場代理人又は技術者経験者\n- 請負金額3,500万円以上の土木一式工事における現場代理人又は技術者経験者、かつ公益社団法人日本推進技術協会に登録された推進工事技士\n- 個人情報の取扱いに係る安全管理措置に関する誓約書を契約締結までに提出すること\n- 独占禁止法の遵守に係る誓約書(別記様式1)を契約締結までに提出すること\n\n【工期・期間】\n工事日数160日間。契約締結から工期終了までの日程は別途契約条項により定められる。",true,"(redacted)","kkj",[30],{"url":27,"name":27},[32],3,[],{"id":6,"name":11,"categoryId":35,"parentId":15,"parentName":15,"bidInfoUrl":15},52,[37],{"year":38,"count":39},2026,45,{"sameOrganization":41,"samePrefecture":60,"similar":82},[42,48,51,54,57],{"id":43,"title":44,"organizationName":11,"prefectureName":12,"publishedDate":45,"deadlineDate":46,"budget":15,"status":47},4363550,"高知市斎場火葬棟トイレ等改修電気設備工事","2026-09-02T15:00:00.000Z","2026-09-17T15:00:00.000Z","active",{"id":49,"title":50,"organizationName":11,"prefectureName":12,"publishedDate":45,"deadlineDate":46,"budget":15,"status":47},4363549,"江ノ口鴨田堰ゲート操作盤更新工事",{"id":52,"title":53,"organizationName":11,"prefectureName":12,"publishedDate":45,"deadlineDate":46,"budget":15,"status":47},4363548,"朝倉丙字明法谷測量設計委託業務",{"id":55,"title":56,"organizationName":11,"prefectureName":12,"publishedDate":45,"deadlineDate":46,"budget":15,"status":47},4363547,"神田地区がけくずれ災害復旧工事​​",{"id":58,"title":59,"organizationName":11,"prefectureName":12,"publishedDate":45,"deadlineDate":46,"budget":15,"status":47},4363546,"高須102号線道路改良工事​​",[61,67,71,74,78],{"id":62,"title":63,"organizationName":64,"prefectureName":12,"publishedDate":65,"deadlineDate":66,"budget":15,"status":47},4424163,"森林環境保全整備事業(大谷鹿伏山2003保育間伐【活用型】)","林野庁四国森林管理局安芸森林管理署","2026-09-03T15:00:00.000Z","2026-10-06T15:00:00.000Z",{"id":68,"title":69,"organizationName":12,"prefectureName":12,"publishedDate":65,"deadlineDate":70,"budget":15,"status":47},4424162,"国道321号(松田川橋)橋梁修繕工事(道老対(橋梁) 第1-11-9号)(令和8年9月4日公告)","2026-09-27T15:00:00.000Z",{"id":72,"title":73,"organizationName":12,"prefectureName":12,"publishedDate":65,"deadlineDate":70,"budget":15,"status":47},4424161,"大西ノ川 河川災害復旧工事(7災 第81号)(令和8年9月4日公告)",{"id":75,"title":76,"organizationName":12,"prefectureName":12,"publishedDate":65,"deadlineDate":77,"budget":15,"status":47},4424160,"高知港海岸(港町地区)高潮対策工事(港高潮(広域)第6-22号)","2026-09-13T15:00:00.000Z",{"id":79,"title":80,"organizationName":81,"prefectureName":12,"publishedDate":65,"deadlineDate":66,"budget":15,"status":47},4424159,"【安芸森林管理署】森林環境保全整備事業(大谷鹿伏山2003保育間伐【活用型】)","農林水産省",[],[84,90,96,102],{"title":85,"link":86,"date":87,"thumb":88,"cat":89},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":91,"link":92,"date":93,"thumb":94,"cat":95},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":97,"link":98,"date":99,"thumb":100,"cat":101},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":103,"link":104,"date":105,"thumb":106,"cat":107},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]