[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-4000556":3,"bid-history-4000556":38,"bid-related-4000556":41,"union-latest":114},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":8,"organizationName":10,"prefectureName":11,"publishedDate":12,"deadlineDate":13,"budget":14,"status":15,"department":16,"bidCategoryName":17,"bidTypeName":18,"categoryText":19,"regionText":10,"deadlineTime":20,"openingDate":21,"qualificationText":22,"aiSummary":23,"aiSummaryGated":24,"aiSummaryTruncated":25,"sourceUrl":26,"dataSourceCode":27,"budgetTaxIncluded":25,"documentUrls":28,"businessExperience":25,"localOffice":30,"securityRequirement":25,"qualifications":31,"certifications":33,"organization":35},4000556,"千葉市健康管理システム標準準拠システム移行業務委託",68,12,1,9,"千葉県千葉市","千葉県","2026-08-26T15:00:00.000Z","2026-10-05T15:00:00.000Z",587731000,"active","千葉市総務局情報経営部情報システム課住民情報系システム標準化推進室","ソフトウェア・アプリ・システム","一般競争入札","役務","17:00:00","2026-10-06T15:00:00.000Z","・令和8・9年度千葉市委託入札参加資格者として認められていること\n・地方自治法施行令第167条の4に該当しないこと\n・手形交換所による取引停止処分を受けてから2年間を経過していること\n・当該入札日前6か月以内に不渡手形または不渡小切手を出していないこと\n・会社更生法の更生手続開始の決定がなされていないこと\n・民事再生法の再生計画認可の決定がなされていないこと\n・千葉市指名停止措置を受けていないこと\n・千葉市内において都市計画法に違反していないこと\n・千葉市内に本店または営業所がある場合は千葉市税を完納していること\n・ISO27001（情報セキュリティマネジメントシステム）を取得していること、またはこれと同等のシステムを有すること\n・ISO9001（品質マネジメントシステム）を取得していること、またはこれと同等のシステムを有すること\n・プライバシーマークまたはTRUSTｅのいずれかを取得していること、またはこれと同等の個人情報保護マネジメントシステムを有すること\n・過去10年間（平成28年度から令和7年度）に国、都道府県、政令指定都市、特別区または中核市においてシステム開発・運用・保守等の同種・同規模以上の履行実績を有すること\n・共同企業体の場合はすべての構成員が上記要件を満たし、協定書を締結し、他の共同企業体や単独での重複参加がないこと","【案件概要】\n千葉市が健康管理システムの標準準拠システムへの移行業務を委託する総合評価落札方式一般競争入札。予定価格は587,731,000円（税込10%）で、契約期間は契約締結日から令和11年3月31日までの約3年間。履行場所は千葉市役所及び市が指定・承認する場所。本件は政府調達協定の適用を受ける。入札参加資格確認申請の締切は令和8年9月11日、開札は令和","8年10月7日（水）午前9時。\n\n【業務内容】\n- 千葉市健康管理システムの標準準拠システムへの移行\n- システム開発・運用・保守等の履行実績を有する事業者による実装\n- 仕様書に示す機能や性能などの要求事項への対応\n- 技術回答書にて基本的事項、業務・機能要求、非機能要求、作業実施内容、実施体制、スケジュール、追加提案を提示\n\n【応募要件】\n・令和8・9年度千葉市委託入札参加資格者として認められていること\n・地方自治法施行令第167条の4に該当しないこと（破産状態、手形交換所処分、指名停止措置等を受けていないこと）\n・千葉市内本店・営業所のある場合は千葉市税を完納していること\n・ISO27001（情報セキュリティマネジメントシステム）の認証取得、またはこれと同等のシステムを有すること\n・ISO9001（品質マネジメントシステム）の認証取得、またはこれと同等のシステムを有すること\n・プライバシーマークまたはTRUSTｅのいずれかの取得、またはこれと同等の個人情報保護マネジメントシステムを有すること\n・過去10年間（平成28年度から令和7年度）に国、都道府県、政令指定都市、特別区または中核市においてシステム開発・運用・保守等の同種・同規模以上の履行実績を有すること（共同企業体の場合は代表構成員が対象）\n・共同企業体の場合：すべての構成員が上記要件を満たし、協定書を締結し、他の共同企業体や単独での重複参加がないこと\n・令和8年9月11日までに入札参加資格確認申請書を提出すること\n\n【工期・期間】\n契約締結日から令和11年3月31日まで（約3年間）\n\n【スケジュール】\n入札参加資格確認申請書受付：令和8年9月11日（金）まで（郵送は9月10日午後5時必着）\n入札説明書交付：令和8年9月11日（金）まで\n入札参加資格に関する質問受付：令和8年9月4日（金）まで、回答は9月9日（水）\n仕様書等に関する質問受付：令和8年9月16日（水）から9月29日（火）まで、回答は10月2日（金）\n入札及び開札：令和8年10月7日（水）午前9時（郵送の場合は10月6日午後5時必着）",true,"(redacted)","kkj",[29],{"url":26,"name":26},false,[32],2,[8,32,34],3,{"id":6,"name":10,"categoryId":36,"parentId":37,"parentName":37,"bidInfoUrl":37},52,null,[39],{"year":40,"count":7},2026,{"sameOrganization":42,"samePrefecture":63,"similar":89},[43,49,53,57,60],{"id":44,"title":45,"organizationName":10,"prefectureName":11,"publishedDate":46,"deadlineDate":47,"budget":37,"status":48},4197867,"千葉市幕張町椎崎公園防火水槽設置工事(8-2)、下水道排水施設工事(稲毛海岸雨水8-1)、防草対策工事(花8-1)、(主)生実本納線(高田IC)道路照明灯設置工事(8-1)、幕張西5丁目公園外遊具交換工事","2026-08-30T15:00:00.000Z","2026-09-03T15:00:00.000Z","closed",{"id":50,"title":51,"organizationName":10,"prefectureName":11,"publishedDate":46,"deadlineDate":52,"budget":37,"status":15},4197866,"区画道路131号線外道路築造工事(検見川稲毛8-2)、都町38号線外擁壁改修工事(中8-1)、小中台高架橋2号補修工事(8-2)、浜野町大金沢町線舗装改良工事(緑8-1)、中野・和泉地区流量調整槽整備工事、(仮称)親水広場整備工事(R8-1)","2026-09-27T15:00:00.000Z",{"id":54,"title":55,"organizationName":10,"prefectureName":11,"publishedDate":46,"deadlineDate":56,"budget":37,"status":15},4197865,"(主)穴川天戸線外2道路詳細修正設計業務委託(8-1)、新田町村田町線自転車走行環境修正設計業務委託(8-1)、(主)千葉川上八街線(上泉町・下泉町地区)歩道詳細設計業務委託(8-1)、誉田町112号線測量業務委託(緑8-1)、測量業務委託(東寺山調整池8-1)","2026-09-14T15:00:00.000Z",{"id":58,"title":59,"organizationName":10,"prefectureName":11,"publishedDate":46,"deadlineDate":47,"budget":37,"status":48},4197864,"吸音パネル(吸音板)他3点",{"id":61,"title":62,"organizationName":10,"prefectureName":11,"publishedDate":46,"deadlineDate":47,"budget":37,"status":48},4197863,"塵芥車",[64,70,75,80,84],{"id":65,"title":66,"organizationName":67,"prefectureName":11,"publishedDate":47,"deadlineDate":68,"budget":69,"status":15},4427000,"松契一般第211号 松戸駅西口地下駐車場空調設備等交換修繕 (PDF:135KB)","千葉県松戸市","2026-10-01T15:00:00.000Z",5500000,{"id":71,"title":72,"organizationName":67,"prefectureName":11,"publishedDate":47,"deadlineDate":73,"budget":74,"status":15},4426999,"松契一般第208号 松戸市消防局空調設備改修その他電気設備工事(第3期)(PDF:139KB)","2026-09-09T15:00:00.000Z",12180000,{"id":76,"title":77,"organizationName":78,"prefectureName":11,"publishedDate":47,"deadlineDate":79,"budget":37,"status":15},4426998,"成田市部活動地域展開事業における認定地域クラブの運営業務に関するプロポーザルの実施について","千葉県成田市","2026-09-23T15:00:00.000Z",{"id":81,"title":82,"organizationName":83,"prefectureName":11,"publishedDate":47,"deadlineDate":37,"budget":37,"status":15},4425144,"テルモBCT株式会社製 遠心型血液成分分離装置 スペクトラオプティア 一式","国立大学法人千葉大学",{"id":85,"title":86,"organizationName":87,"prefectureName":11,"publishedDate":47,"deadlineDate":88,"budget":37,"status":15},4425143,"R8首都国道事務所連絡車(4×2、7人乗)1台交換購入 [PDF:133KB]","国土交通省関東地方整備局首都国道事務所","2026-10-08T15:00:00.000Z",[90,96,101,106,110],{"id":91,"title":92,"organizationName":93,"prefectureName":93,"publishedDate":47,"deadlineDate":94,"budget":95,"status":15},4433399,"公告日 令和8\u002F9\u002F4 【施工体制確認型総合評価方式案件(特別簡易型・技術資料の事後審査型)】 【建設キャリアアップシステム活用モデル工事(発注者指定型)案件】 【予定価格事後公表試行案件】 令和8年度防災安全・地 第 A010-11分0003号 一般県道高奈上三瀬線(高奈~長ケ)ほか1線道路改良ほか工事","三重県","2026-10-04T15:00:00.000Z",5858600,{"id":97,"title":98,"organizationName":93,"prefectureName":93,"publishedDate":47,"deadlineDate":99,"budget":100,"status":15},4433391,"公告日 令和8\u002F9\u002F4 【一抜け方式試行対象案件】 【建設キャリアアップシステム活用モデル工事(発注者指定型)案件】 令和8年度公共土木施設維管 第 3-20分0002号 一般国道165号(黒田)舗装修繕工事","2026-09-28T15:00:00.000Z",29700000,{"id":102,"title":103,"organizationName":93,"prefectureName":93,"publishedDate":47,"deadlineDate":104,"budget":105,"status":15},4433390,"公告日 令和8\u002F9\u002F4 【施工体制確認型総合評価方式案件(特別簡易型・技術資料の事後審査型)】 【総合評価における一括審査方式案件】 【建設キャリアアップシステム活用モデル工事(発注者指定型)案件】 令和8年度公共土木施設維管 第 81-10分0002号 一級河川比自岐川他2川河川維持修繕(河床掘削)工事","2026-09-29T15:00:00.000Z",45565300,{"id":107,"title":108,"organizationName":93,"prefectureName":93,"publishedDate":47,"deadlineDate":104,"budget":109,"status":15},4433389,"公告日 令和8\u002F9\u002F4 【施工体制確認型総合評価方式案件(特別簡易型・技術資料の事後審査型)】 【総合評価における一括審査方式案件】 【建設キャリアアップシステム活用モデル工事(発注者指定型)案件】 令和8年度公共土木施設維管 第 73-10分0002号 一級河川久米川他1川河川維持修繕工事",45851300,{"id":111,"title":112,"organizationName":93,"prefectureName":93,"publishedDate":47,"deadlineDate":104,"budget":113,"status":15},4433388,"公告日 令和8\u002F9\u002F4 【施工体制確認型総合評価方式案件(特別簡易型・技術資料の事後審査型)】 【総合評価における一括審査方式案件】 【建設キャリアアップシステム活用モデル工事(発注者指定型)案件】 令和8年度公共土木施設維管 第 49-10分0002号 一級河川大谷川他2川河川維持修繕(河床掘削)工事",47335200,[115,121,127,133],{"title":116,"link":117,"date":118,"thumb":119,"cat":120},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":122,"link":123,"date":124,"thumb":125,"cat":126},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":128,"link":129,"date":130,"thumb":131,"cat":132},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":134,"link":135,"date":136,"thumb":137,"cat":138},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]