[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-3930379":3,"bid-history-3930379":36,"bid-related-3930379":40,"union-latest":79},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":17,"bidCategoryName":18,"bidTypeName":19,"categoryText":20,"regionText":21,"deadlineTime":22,"openingDate":23,"qualificationText":24,"aiSummary":25,"aiSummaryGated":26,"aiSummaryTruncated":27,"sourceUrl":28,"dataSourceCode":29,"budgetTaxIncluded":15,"documentUrls":30,"businessExperience":27,"localOffice":27,"securityRequirement":32,"qualifications":33,"certifications":34,"organization":35},3930379,"北木場農地災害復旧工事",2953,42,2,14,1,"大村市","長崎県","2026-08-25T15:00:00.000Z","2026-09-02T15:00:00.000Z",null,"active","農林水産整備課","土木","一般競争入札","とび・土工・コンクリート工事","松原二丁目","17:00:00","2026-09-03T15:00:00.000Z","・令和8年度大村市入札参加資格者名簿においてとび・土工・コンクリート工事に登録されている者\n・大村市内に本社を有する者\n・建設業法第3条の規定によるとび・土工工事業に係る一般建設業又は特定建設業の許可を受けている者\n・入札参加申請書の提出期限までに大村市電子入札システムに利用者登録が完了していること\n・本工事現場に建設業法及び建設業法施行規則によるとび・土工工事業に係る主任技術者の資格要件を満たす者を配置できること\n・経営事項審査の審査基準日が令和6年7月1日から令和7年6月30日までの結果通知書を有していること","【案件概要】\n大村市農林水産整備課が北木場農地の災害復旧工事について条件付き一般競争入札を実施する。工事場所は松原二丁目。令和8年8月26日公告。予算規模は設計図書に基づく。電子入札により実施し、審査は事後審査方式。\n\n【業務内容】\n- 北木場農地(205-1)の復旧工事\n- 復旧延長 L=8.5m\n- ブロック積工 A=18㎡\n- 土羽工 A=11㎡\n- ","畦畔工 L=9m\n- すり付け工（空石積） A=4㎡\n- 主任技術者の配置\n\n【応募要件】\n- 令和8年度大村市入札参加資格者名簿においてとび・土工・コンクリート工事に登録されている者\n- 大村市内に本社を有する者\n- 建設業法第3条の規定によるとび・土工工事業に係る一般建設業又は特定建設業の許可を受けている者\n- 入札参加申請書の提出期限までに大村市電子入札システムに利用者登録が完了し、入札参加申請が可能であること\n- 本工事現場に建設業法及び建設業法施行規則によるとび・土工工事業に係る主任技術者の資格要件を満たす者を配置できること\n- 経営事項審査の審査基準日は令和6年7月1日から令和7年6月30日までとする\n\n【工期・期間】\n実工期：工事始期から100日間。余裕期間は最大30日間で、契約締結日から最大30日後の翌日を工事着手期限とする。週休2日工事である。",true,"(redacted)","omura-koukoku",[31],{"url":28,"name":28},false,[],[],{"id":6,"name":11,"categoryId":15,"parentId":15,"parentName":15,"bidInfoUrl":15},[37],{"year":38,"count":39},2026,40,{"sameOrganization":41,"samePrefecture":59,"similar":78},[42,46,49,52,56],{"id":43,"title":44,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":45,"budget":15,"status":16},3930385,"西大村本町配水管敷設替工事","2026-09-16T15:00:00.000Z",{"id":47,"title":48,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":45,"budget":15,"status":16},3930384,"上水遠方監視制御装置更新第2期工事",{"id":50,"title":51,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":45,"budget":15,"status":16},3930383,"上水遠方監視制御装置更新に伴う中央監視機能増設第2期工事",{"id":53,"title":54,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":55,"budget":15,"status":16},3930382,"体育文化センター熱源更新・空調設置工事","2026-09-30T15:00:00.000Z",{"id":57,"title":58,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":45,"budget":15,"status":16},3930381,"今津・松山汚水幹線管更生工事",[60,63,68,71,75],{"id":61,"title":62,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":45,"budget":15,"status":16},3930380,"原口町配水管敷設替工事",{"id":64,"title":65,"organizationName":66,"prefectureName":12,"publishedDate":13,"deadlineDate":67,"budget":15,"status":16},3925502,"早岐処理分区・若竹台町下水道マンホール蓋取替工事","佐世保市","2026-09-06T15:00:00.000Z",{"id":69,"title":70,"organizationName":66,"prefectureName":12,"publishedDate":13,"deadlineDate":67,"budget":15,"status":16},3925501,"斜面密集市街地事業(矢岳・今福)に伴う下水道管路移設工事",{"id":72,"title":73,"organizationName":66,"prefectureName":12,"publishedDate":13,"deadlineDate":74,"budget":15,"status":16},3925500,"上原地区周辺再構築に伴う舗装復旧工事","2026-09-13T15:00:00.000Z",{"id":76,"title":77,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":15,"budget":15,"status":16},3921326,"大村市歴史資料館展示品梱包輸送業務委託",[],[80,86,92,98],{"title":81,"link":82,"date":83,"thumb":84,"cat":85},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":87,"link":88,"date":89,"thumb":90,"cat":91},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":93,"link":94,"date":95,"thumb":96,"cat":97},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":99,"link":100,"date":101,"thumb":102,"cat":103},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]