[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-3923275":3,"bid-related-3923275":37,"bid-history-3923275":112,"union-latest":116},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":11,"bidCategoryName":17,"bidTypeName":18,"categoryText":19,"regionText":20,"deadlineTime":21,"openingDate":22,"qualificationText":23,"aiSummary":24,"aiSummaryGated":25,"aiSummaryTruncated":26,"sourceUrl":27,"dataSourceCode":28,"budgetTaxIncluded":26,"documentUrls":29,"businessExperience":26,"localOffice":26,"securityRequirement":31,"qualifications":32,"certifications":33,"organization":34},3923275,"下水道マンホール更生工事(吾妻三丁目)",2033,12,2,26,1,"成田市 総務部 契約検査課","千葉県","2026-08-25T15:00:00.000Z","2026-09-09T15:00:00.000Z",13277000,"active","下水道","一般競争入札","下水道マンホール更生工事","成田市吾妻三丁目地先","16:00:00","2026-09-10T15:00:00.000Z","・令和8・9年度成田市入札参加資格者名簿の「建設工事」部門に登載されていること\n・公告日から開札日までに指名停止措置又は入札参加除外を受けていないこと\n・市内業者として登載され、土木一式工事について建設業法第3条の許可を有すること\n・土木一式工事について経営事項審査の総合評点が640点以上740点未満で登載されていること\n・土木一式工事について建設業法第26条第2項の監理技術者又は第1項の主任技術者を配置すること\n・配置技術者は公告日現在、3ヶ月以上の直接的・恒常的な雇用関係にあること\n・特例監理技術者配置の場合、監理技術者補佐を専任で配置し、一級施工管理技士補等の国家資格者であること\n・監理技術者補佐は入札参加者と直接的かつ恒常的な雇用関係にあること\n・現場代理人を常駐で配置すること\n・配置現場代理人は公告日現在、3ヶ月以上の直接的・恒常的な雇用関係にあること\n・官公庁等が平成28年度以降に発注した土木一式工事について、元請として受注し施工完了した実績があること\n・手形交換所による取引停止処分を受けて2年間を経過していないこと、又は開札日前6ヶ月以内に手形・小切手を不渡りにしていないこと\n・会社更生法又は民事再生法の適用を申請し、裁判所からの手続開始決定がされていないこと\n・本工事に係る設計業務等の受託者又は当該受託者と資本若しくは人事面において関連がある建設業者でないこと\n・開札日以前3ヶ月以内に工事完成検査結果通知書で評定点60点未満の通知を受けていないこと\n・健康保険法、厚生年金保険法、雇用保険法の届出義務を履行していること\n・開札日の前日において、自らの責により成田市発注の工事を工期内に完成することができず、当該工事目的物の引渡しを行っていないこと","【案件概要】\n成田市が下水道マンホール更生工事の制限付一般競争入札（事後審査型）を実施。対象地域は成田市吾妻三丁目地先で、成田ニュータウン汚水5号幹線における老朽化したマンホールと管きょの更生工事である。予定価格は13,277,000円（税込、入札書比較価格12,070,000円）。工期は契約締結の翌日から令和9年2月12日までの約5ヶ月間。電子入札により実","施される。\n\n【業務内容】\n- マンホール更生：自立型レジンコンクリート製により1箇所のマンホールを更生\n- 管きょ更生：φ250mm管について形成工法による自立管での内面被覆工、施工延長28.84m\n- 管路土工：掘削、埋戻し、発生土処理を含む\n- 付帯工：舗装版破砕・切断、既設構造物撤去（インバート、調整リング等）、舗装仮復旧\n- 建設副産物処理：建設発生土、アスファルト殻、コンクリート殻、路盤廃材等の適正処理\n\n【応募要件】\n- 令和8・9年度成田市入札参加資格者名簿の「建設工事」部門に登載されていること\n- 公告日から開札日までに指名停止措置等を受けていないこと\n- 市内業者として登載され、土木一式工事について建設業許可を有し、経営事項審査総合評点が640点以上740点未満であること\n- 土木一式工事について監理技術者又は主任技術者を配置すること（配置技術者は公告日時点で3ヶ月以上の直接的・恒常的雇用関係が必要）\n- 特例監理技術者配置の場合、監理技術者補佐を専任配置し、複数要件を満たすこと\n- 現場代理人を常駐で配置すること（要件により常駐不要の場合あり、3ヶ月以上の直接的・恒常的雇用関係が必要）\n- 官公庁等が平成28年度以降に発注した土木一式工事を元請として受注・施工完了した実績があること\n- 手形交換所取引停止等の財務的問題がないこと\n- 本工事の設計業務受託者でなく、当該受託者と資本若しくは人事面において関連がないこと\n- 開札日以前3ヶ月以内に工事完成検査で60点未満の評定を受けていないこと\n- 健康保険、厚生年金保険、雇用保険の届出義務を履行していること\n- 開札日前日において自らの責により市発注工事を工期内に完成できず、引渡しを行っていないことのないこと\n\n【工期・期間】\n契約締結の翌日から令和9年2月12日（金）までの約5ヶ月間。工期には準備期間30日間、後片付け期間20日間、雨休率0.78を見込んでいる。\n\n【入札スケジュール】\n設計図書質問期限：令和8年9月1日（火）午後4時\n入札書送信期間：令和8年9月4日（金）午前8時～同月10日（木）午後4時\n入札保証金納付期限：令和8年9月10日（木）午後3時\n開札日時：令和8年9月11日（金）午前9時7分",true,"(redacted)","ppi-core-chiba",[30],{"url":27,"name":27},false,[],[],{"id":6,"name":11,"categoryId":35,"parentId":36,"parentName":36,"bidInfoUrl":36},15,null,{"sameOrganization":38,"samePrefecture":59,"similar":86},[39,43,47,51,55],{"id":40,"title":41,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":42,"status":16},3923281,"地質調査委託(吉岡前林線)",13926000,{"id":44,"title":45,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":46,"status":16},3923280,"測量調査委託(台方地内線)",4312000,{"id":48,"title":49,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":50,"status":16},3923279,"本庁舎空冷チラー圧縮機交換修繕",4301000,{"id":52,"title":53,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":54,"status":16},3923278,"成田観光館防火シャッター危害防止装置等改修工事",2662000,{"id":56,"title":57,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":58,"status":16},3923277,"江川幹線6号マンホールポンプ場機器修繕",3454000,[60,65,71,76,81],{"id":61,"title":62,"organizationName":63,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":64,"status":16},3926594,"萩生漁港整備工事","富津市 市長部局 管財契約検査課",6710000,{"id":66,"title":67,"organizationName":68,"prefectureName":12,"publishedDate":13,"deadlineDate":69,"budget":70,"status":16},3926394,"千葉県立館山総合高等学校水産校舎ヨット艇庫シャッター改修工事","千葉県 教育庁(県立学校) 千葉県立館山総合高等学校","2026-09-15T15:00:00.000Z",22858000,{"id":72,"title":73,"organizationName":74,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":75,"status":16},3923290,"市道高崎5号線道路維持工事","南房総市 建設環境部 建設課",3223000,{"id":77,"title":78,"organizationName":79,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":80,"status":16},3923289,"原岡桟橋駐車場整備工事","南房総市 商工観光部 観光プロモーション課",11913000,{"id":82,"title":83,"organizationName":84,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":85,"status":16},3923288,"林道小川線道路維持工事","南房総市 農林水産部 農林水産課",3905000,[87,93,96,103,108],{"id":88,"title":89,"organizationName":90,"prefectureName":91,"publishedDate":13,"deadlineDate":92,"budget":36,"status":16},3925502,"早岐処理分区・若竹台町下水道マンホール蓋取替工事","佐世保市","長崎県","2026-09-06T15:00:00.000Z",{"id":94,"title":95,"organizationName":90,"prefectureName":91,"publishedDate":13,"deadlineDate":92,"budget":36,"status":16},3925501,"斜面密集市街地事業(矢岳・今福)に伴う下水道管路移設工事",{"id":97,"title":98,"organizationName":99,"prefectureName":100,"publishedDate":13,"deadlineDate":101,"budget":102,"status":16},3922127,"新座市公共下水道新堀幹線改築工事(大規模下水道管路特別重点調査事業)","新座市 財政部 管財契約課","埼玉県","2026-09-28T15:00:00.000Z",645929900,{"id":104,"title":105,"organizationName":106,"prefectureName":100,"publishedDate":13,"deadlineDate":36,"budget":107,"status":16},3922124,"災害用マンホールトイレ整備その2工事","川口市 上下水道局 財務課",16274000,{"id":109,"title":110,"organizationName":111,"prefectureName":100,"publishedDate":13,"deadlineDate":36,"budget":36,"status":16},3919721,"蕨西部排水区下水道工事(R8-1工区)","蕨市 総務部 財政課",[113],{"year":114,"count":115},2026,81,[117,123,129,135],{"title":118,"link":119,"date":120,"thumb":121,"cat":122},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":124,"link":125,"date":126,"thumb":127,"cat":128},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":130,"link":131,"date":132,"thumb":133,"cat":134},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":136,"link":137,"date":138,"thumb":139,"cat":140},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]