[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-3923274":3,"bid-history-3923274":37,"bid-related-3923274":41,"union-latest":120},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":11,"bidCategoryName":17,"bidTypeName":18,"categoryText":19,"regionText":20,"deadlineTime":21,"openingDate":22,"qualificationText":23,"aiSummary":24,"aiSummaryGated":25,"aiSummaryTruncated":26,"sourceUrl":27,"dataSourceCode":28,"budgetTaxIncluded":26,"documentUrls":29,"businessExperience":26,"localOffice":26,"securityRequirement":31,"qualifications":32,"certifications":33,"organization":34},3923274,"道路改良工事(西三里塚大清水線)",2033,12,2,14,1,"成田市 総務部 契約検査課","千葉県","2026-08-25T15:00:00.000Z","2026-09-09T15:00:00.000Z",44660000,"active","土木","一般競争入札","道路改良工事（土木一式工事）","成田市西三里塚地先","16:00:00","2026-09-10T15:00:00.000Z","・令和8・9年度成田市入札参加資格者名簿の「建設工事」部門に登載されていること\n・成田市内業者として資格者名簿に登載され、土木一式工事について建設業法第3条の建設業許可を有すること\n・土木一式工事について経営事項審査の総合評点が740点以上1,200点未満であること\n・土木一式工事について監理技術者または主任技術者を配置すること\n・配置技術者は公告日現在3ヶ月以上の直接的・恒常的な雇用関係にあること\n・特例監理技術者を配置する場合は、監理技術者補佐の専任配置等複数の要件を全て満たすこと\n・現場代理人を常駐で配置すること\n・配置現場代理人は公告日現在3ヶ月以上の直接的・恒常的な雇用関係にあること\n・平成28年度以降に官公庁等が発注した土木一式工事について、元請として受注し施工完了した実績があること\n・指名停止措置または入札参加除外を受けていないこと\n・手形交換所による取引停止処分を受けて2年以内でないこと、または開札日前6ヶ月以内に不渡りがないこと\n・会社更生法の適用申請で更生手続開始決定されていないこと\n・民事再生法の適用申請で再生手続開始決定されていないこと\n・設計業務等の受託者またはその関連建設業者でないこと\n・開札日以前3ヶ月以内に工事完成検査結果通知書で評定点60点未満の通知を受けていないこと\n・健康保険法第48条、厚生年金保険法第27条、雇用保険法第7条の届出義務を履行していること\n・成田市発注工事を工期内に完成し引渡しを行っていること","【案件概要】\n成田市が市道西三里塚大清水線の道路改良工事を制限付一般競争入札（事後審査型）で実施。工事場所は成田市西三里塚地先で、工事延長は58.3m、計画道路幅員は12.0m。予定価格は44,660,000円（税込）、最低制限価格は40,306,200円（税込）。工事期限は契約締結の翌日から令和9年3月12日（金）までの約6ヶ月間。\n\n【業務内容】\n- 道","路土工一式（掘削340m³、土砂等運搬310m³）\n- 排水構造物工一式（側溝各種95m、集水桝5箇所）\n- 構造物撤去工一式（舗装版510m²、Co殻71m³）\n- 舗装工一式（車道舗装509m²、歩道舗装140m²）\n- 縁石工一式（歩車道境界83m）\n- 区画線工一式（区画線155m）\n- 道路付属物工一式（ラバーポール9本）\n- 付帯工一式（耐震性貯水槽1基）\n\n【応募要件】\n- 令和8・9年度成田市入札参加資格者名簿の「建設工事」部門に登載されていること\n- 成田市内業者として資格者名簿に登載され、土木一式工事について建設業法第3条の建設業許可を有し、経営事項審査の総合評点が740点以上1,200点未満であること\n- 土木一式工事について監理技術者または主任技術者を配置すること。配置技術者は公告日現在3ヶ月以上の直接的・恒常的な雇用関係にあること\n- 特例監理技術者の配置を行う場合は、監理技術者補佐の専任配置等複数の要件を満たすこと\n- 現場代理人を常駐で配置すること。公告日現在3ヶ月以上の直接的・恒常的な雇用関係にあることを要する\n- 平成28年度以降に官公庁等が発注した土木一式工事について、元請として受注し施工完了した実績があること\n- 指名停止措置、入札参加除外を受けていないこと\n- 健康保険法、厚生年金保険法、雇用保険法の届出義務を履行していること\n- 工事完成検査結果通知書で評定点60点未満の通知を開札日以前3ヶ月以内に受けていないこと\n- 成田市発注工事を工期内に完成させ引渡しを行っていること（責めに帰すべき事由で未完成でないこと）\n\n【工期・期間】\n契約締結の日の翌日から令和9年3月12日（金）まで。雨天・休日（日曜日、祝日、工作期間内のすべての土曜日）を含んだ工期設定。昼間作業を基本とし、耐震性貯水槽の新設は令和8年12月28日までに完成させ、成田市消防本部の検査を受検すること。\n\n【その他特記事項】\n本工事は週休2日制適用工事（受注者希望型）の試行対象。熱中症対策に資する現場管理費の補正を試行する対象工事。低騒音・排出ガス対策型建設機械の使用原則。下請け業者は市内優先。舗装工に使用するアスファルト合材は溶融スラグ入りで、成田富里いずみ清掃工場で生成されたものに限定。",true,"(redacted)","ppi-core-chiba",[30],{"url":27,"name":27},false,[],[],{"id":6,"name":11,"categoryId":35,"parentId":36,"parentName":36,"bidInfoUrl":36},15,null,[38],{"year":39,"count":40},2026,81,{"sameOrganization":42,"samePrefecture":63,"similar":90},[43,47,51,55,59],{"id":44,"title":45,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":46,"status":16},3923281,"地質調査委託(吉岡前林線)",13926000,{"id":48,"title":49,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":50,"status":16},3923280,"測量調査委託(台方地内線)",4312000,{"id":52,"title":53,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":54,"status":16},3923279,"本庁舎空冷チラー圧縮機交換修繕",4301000,{"id":56,"title":57,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":58,"status":16},3923278,"成田観光館防火シャッター危害防止装置等改修工事",2662000,{"id":60,"title":61,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":62,"status":16},3923277,"江川幹線6号マンホールポンプ場機器修繕",3454000,[64,69,75,80,85],{"id":65,"title":66,"organizationName":67,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":68,"status":16},3926594,"萩生漁港整備工事","富津市 市長部局 管財契約検査課",6710000,{"id":70,"title":71,"organizationName":72,"prefectureName":12,"publishedDate":13,"deadlineDate":73,"budget":74,"status":16},3926394,"千葉県立館山総合高等学校水産校舎ヨット艇庫シャッター改修工事","千葉県 教育庁(県立学校) 千葉県立館山総合高等学校","2026-09-15T15:00:00.000Z",22858000,{"id":76,"title":77,"organizationName":78,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":79,"status":16},3923290,"市道高崎5号線道路維持工事","南房総市 建設環境部 建設課",3223000,{"id":81,"title":82,"organizationName":83,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":84,"status":16},3923289,"原岡桟橋駐車場整備工事","南房総市 商工観光部 観光プロモーション課",11913000,{"id":86,"title":87,"organizationName":88,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":89,"status":16},3923288,"林道小川線道路維持工事","南房総市 農林水産部 農林水産課",3905000,[91,96,100,106,112],{"id":92,"title":93,"organizationName":94,"prefectureName":95,"publishedDate":13,"deadlineDate":22,"budget":36,"status":16},3925506,"市道20036号線道路改良工事","熊谷市 総務部 契約課","埼玉県",{"id":97,"title":98,"organizationName":99,"prefectureName":95,"publishedDate":13,"deadlineDate":36,"budget":36,"status":16},3919716,"市道第8288号線道路改良工事","本庄市 企画財政部 財政課",{"id":101,"title":102,"organizationName":103,"prefectureName":104,"publishedDate":13,"deadlineDate":105,"budget":36,"status":16},3917994,"【総合評価】８債地改第１－１号 主要地方道長崎畝刈線（滑石工区）道路改良工事（橋梁下部工）","長崎振興局","長崎県","2026-09-16T15:00:00.000Z",{"id":107,"title":108,"organizationName":109,"prefectureName":12,"publishedDate":13,"deadlineDate":110,"budget":111,"status":16},3903325,"市道40-013号線ほか1路線道路改良工事","船橋市 企画財政部 契約課","2026-09-07T15:00:00.000Z",4980000,{"id":113,"title":114,"organizationName":115,"prefectureName":116,"publishedDate":117,"deadlineDate":118,"budget":119,"status":16},3906595,"市道久井町鶴ヶ岬本線道路改良工事","広島県三原市","広島県","2026-08-24T15:00:00.000Z","2026-09-08T15:00:00.000Z",8790000,[121,127,133,139],{"title":122,"link":123,"date":124,"thumb":125,"cat":126},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":128,"link":129,"date":130,"thumb":131,"cat":132},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":134,"link":135,"date":136,"thumb":137,"cat":138},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":140,"link":141,"date":142,"thumb":143,"cat":144},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]