[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-3918034":3,"bid-history-3918034":37,"bid-related-3918034":41,"union-latest":111},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":17,"bidCategoryName":18,"bidTypeName":19,"categoryText":20,"regionText":21,"deadlineTime":22,"openingDate":23,"qualificationText":24,"aiSummary":25,"aiSummaryGated":26,"aiSummaryTruncated":27,"sourceUrl":28,"dataSourceCode":29,"budgetTaxIncluded":15,"documentUrls":30,"businessExperience":27,"localOffice":27,"securityRequirement":32,"qualifications":33,"certifications":34,"organization":35},3918034,"令和8年度笠岡バイパス茂平地区第13改良工事",281,33,2,14,1,"国土交通省中国地方整備局","岡山県","2026-08-25T15:00:00.000Z","2026-09-03T15:00:00.000Z",null,"active","岡山国道事務所","土木","一般競争入札","一般土木工事","岡山県笠岡市茂平地内","15:00:00","2026-10-20T15:00:00.000Z","・中国地方整備局における令和7・8年度「一般土木工事」に係る「C等級」の一般競争参加資格の認定を受けていること\n・予算決算及び会計令第70条及び第71条の規定に該当しないこと\n・会社更生法・民事再生法に基づく手続開始の申立てを受けていないこと\n・暴力団員が実質的に経営を支配する建設業者でないこと\n・平成23年4月1日以降に元請けとして完成・引き渡しが完了した、道路法上の道路における地盤改良工の施工実績を有すること\n・1級土木施工管理技士又はこれと同等以上の資格を有する主任技術者又は監理技術者を配置できること\n・平成23年4月1日以降に同種工事の経験を有する主任技術者又は監理技術者を配置すること\n・監理技術者にあっては監理技術者資格者証及び有効な監理技術者講習修了を有する者であること\n・申請書提出期限から開札日までの期間に指名停止を受けていないこと\n・過去2年間に完成した工事の評定点の年度毎平均点が65点以上であること\n・本工事の設計業務等受注者又は関連がある建設業者でないこと\n・入札参加者間に資本関係又は人的関係がないこと\n・岡山県内に建設業法の許可を有する本店又は支店・営業所が所在すること\n・建設業退職金共済制度又は同主旨の別個の共済制度に加入していること","【案件概要】\n国土交通省中国地方整備局岡山国道事務所が令和8年度笠岡バイパス茂平地区第13改良工事の一般競争入札（同時提出型）を実施する。対象地域は岡山県笠岡市茂平地内。本工事は施工体制確認型総合評価落札方式（施工能力評価型Ⅱ型）の試行工事であり、複数工事（A・B・C・Dの4工事）における技術資料の一括審査方式が採用されている。契約締結の翌日から令和9年3月","31日までの工期予定。予算規模は非公表であるが、予定価格1億円以上の工事のため低入札価格調査制度の対象となる。\n\n【業務内容】\n- 工事延長240m\n- 道路土工（1式）\n- 地盤改良工（1式）\n- 固結工（ICT）250本\n- 仮設工（1式）\n- ICT施工技術の全面的活用（発注者指定Ⅰ型）\n- BIM\u002FCIM適用工事（受注者希望型）\n- 総価契約単価合意方式\n- 契約後VE方式の試行\n- 建設資材の分別解体及び再資源化等の実施\n- 若手技術者育成型総合評価落札方式の試行\n- 生産性向上チャレンジの試行対象工事\n- 建設キャリアアップシステム活用推奨モデル工事\n\n【応募要件】\n- 中国地方整備局における令和7・8年度「一般土木工事」に係る「C等級」の一般競争参加資格の認定を受けていること\n- 予算決算及び会計令第70条及び第71条の規定に該当しないこと\n- 会社更生法・民事再生法に基づく手続開始の申立てを受けていないこと\n- 暴力団員が実質的に経営を支配する建設業者でないこと\n- 平成23年4月1日以降に元請けとして完成・引き渡しが完了した、道路法上の道路における地盤改良工の施工実績を有すること（共同企業体の場合は出資比率20%以上、地域維持型JVは10%以上）\n- 1級土木施工管理技士又はこれと同等以上の資格を有する主任技術者又は監理技術者を専任で配置できること（請負代金4,500万円未満の工事は専任不要）\n- 平成23年4月1日以降に同種工事の経験を有する主任技術者又は監理技術者を配置すること\n- 監理技術者にあっては監理技術者資格者証及び有効な監理技術者講習修了を有する者であること\n- 申請書提出期限から開札日までの期間に指名停止を受けていないこと\n- 過去2年間（令和6年4月1日～令和8年3月31日）の完成工事における評定点の年度毎平均点が65点以上であること\n- 本工事の設計業務等受注者又は関連がある建設業者でないこと\n- 入札参加者間に資本関係又は人的関係がないこと\n- 岡山県内に建設業法の許可を有する本店又は支店・営業所が所在すること\n- 建設業退職金共済制度又は同主旨の別個の共済制度に加入していること\n- 協力企業表彰を受けた企業の場合、他の競争参加希望者の下請負人として参入を予定していないこと\n- A・B・C・D工事のうち、申請できる配置予定技術者は同一の1名とすること\n\n【工期・期間】\n契約締結の翌日から令和9年3月31日まで\n\n【総合評価項目】\n- 施工体制（品質確保の実効性、施工体制確保の確実性）\n- 企業の能力等（同種工事実績、評定点、ゴールドカード制度、優秀表彰の有無、協力企業表彰下請業者の活用、技能者従事計画、維持修繕工事等の受注実績、ワーク・ライフ・バランス等推進企業）\n- 技術者の能力等（専任補助者の能力、技術者表彰、継続教育学習、若手技術者配置、若手・女性技術者配置）\n- 地域精神度・地域貢献度（若手技術者等の雇用、事業継続計画認定、岡山県西部での施工実績）\n- 賃上げ実施に関する評価\n- 不正又は不誠実な行為等における減点",true,"(redacted)","ippi-koji",[31],{"url":28,"name":28},false,[],[],{"id":6,"name":11,"categoryId":36,"parentId":15,"parentName":15,"bidInfoUrl":15},17,[38],{"year":39,"count":40},2026,306,{"sameOrganization":42,"samePrefecture":62,"similar":86},[43,47,50,53,56],{"id":44,"title":45,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":46,"budget":15,"status":16},3919638,"令和8年度高梁川水系環境調査業務","2026-09-08T15:00:00.000Z",{"id":48,"title":49,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},3918033,"令和8年度笠岡バイパス鋼管地区第8改良工事",{"id":51,"title":52,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},3918032,"令和8年度笠岡バイパス鋼管地区第9改良工事",{"id":54,"title":55,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},3918031,"令和8年度笠岡バイパス茂平地区第12改良工事",{"id":57,"title":58,"organizationName":11,"prefectureName":59,"publishedDate":60,"deadlineDate":61,"budget":15,"status":16},3906562,"令和8年度岡山国道道路占用適正化作業","広島県","2026-08-24T15:00:00.000Z","2026-09-30T15:00:00.000Z",[63,69,72,75,81],{"id":64,"title":65,"organizationName":66,"prefectureName":12,"publishedDate":60,"deadlineDate":67,"budget":68,"status":16},3906561,"県道佐伯長船線道路改良工事(8-1)","岡山県岡山市","2026-09-13T15:00:00.000Z",36000000,{"id":70,"title":71,"organizationName":66,"prefectureName":12,"publishedDate":60,"deadlineDate":67,"budget":15,"status":16},3906560,"国道250号百間川橋東交差点改良工事(8-1)に伴う舗装工事",{"id":73,"title":58,"organizationName":74,"prefectureName":12,"publishedDate":60,"deadlineDate":15,"budget":15,"status":16},3906559,"国土交通省",{"id":76,"title":77,"organizationName":78,"prefectureName":12,"publishedDate":79,"deadlineDate":80,"budget":15,"status":16},3882587,"職員宿舎敷地内高木の剪定作業の実施業務","独立行政法人高齢・障害・求職者雇用支援機構国立吉備高原職業リハビリテーションセンター","2026-08-23T15:00:00.000Z","2026-09-06T15:00:00.000Z",{"id":82,"title":83,"organizationName":84,"prefectureName":12,"publishedDate":79,"deadlineDate":85,"budget":15,"status":16},3882586,"大型自動車第一種運転免許教習業務 [PDFファイル\u002F139KB]","国家公安委員会(警察庁)岡山県警察","2026-08-30T15:00:00.000Z",[87,94,99,102,105],{"id":88,"title":89,"organizationName":90,"prefectureName":91,"publishedDate":13,"deadlineDate":92,"budget":93,"status":16},3922180,"令和８年度　橋梁修繕工事（東畑２３号線無名橋）","精華町","京都府","2026-09-02T15:00:00.000Z",11973500,{"id":95,"title":96,"organizationName":97,"prefectureName":98,"publishedDate":13,"deadlineDate":15,"budget":15,"status":16},3921614,"令和8年度下期道路補修用アスファルト常温合材(30kg)(土浦土木)","茨城県 土木部 土浦土木事務所","茨城県",{"id":100,"title":101,"organizationName":97,"prefectureName":98,"publishedDate":13,"deadlineDate":15,"budget":15,"status":16},3921613,"令和8年度下期道路補修用アスファルト常温合材(20kg)(土浦土木)",{"id":103,"title":104,"organizationName":97,"prefectureName":98,"publishedDate":13,"deadlineDate":15,"budget":15,"status":16},3921612,"令和8年度下期道路補修用アスファルト常温合材(15kg)(土浦土木)",{"id":106,"title":107,"organizationName":108,"prefectureName":109,"publishedDate":13,"deadlineDate":110,"budget":15,"status":16},3921319,"令和8(2026)年度地盤沈下対策精密水準測量業務","環境森林部 環境保全課","栃木県","2026-09-10T15:00:00.000Z",[112,118,124,130],{"title":113,"link":114,"date":115,"thumb":116,"cat":117},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":119,"link":120,"date":121,"thumb":122,"cat":123},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":125,"link":126,"date":127,"thumb":128,"cat":129},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":131,"link":132,"date":133,"thumb":134,"cat":135},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]