[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-3917995":3,"bid-history-3917995":33,"bid-related-3917995":37,"union-latest":106},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":11,"bidCategoryName":17,"bidTypeName":18,"categoryText":19,"regionText":20,"deadlineTime":15,"openingDate":21,"qualificationText":22,"aiSummary":23,"aiSummaryGated":24,"aiSummaryTruncated":25,"sourceUrl":26,"dataSourceCode":27,"budgetTaxIncluded":15,"documentUrls":28,"businessExperience":25,"localOffice":25,"securityRequirement":29,"qualifications":30,"certifications":31,"organization":32},3917995,"【総合評価】７繰漁港増第１－１４号 長崎北地区増殖場整備工事（九十九島工区その３）",2830,42,2,14,1,"水産部 漁港漁場課","長崎県","2026-08-25T15:00:00.000Z","2026-09-16T15:00:00.000Z",null,"active","土木","一般競争入札","増殖場整備工事（土木工事・海上工事）","佐世保市鹿町町長串地先","2026-09-17T15:00:00.000Z","・土木工事業に係る特定建設業の許可を有すること\n・土木一式工事に係る格付けAランク取得\n・県北振興局建設部管内に主たる営業所を有し、総合数値950点以上かつ主観点数合計50点以上であること、または県内に主たる営業所を有し総合数値1,100点以上かつ主観点数合計100点以上であること\n・土木一式工事における年間平均完成工事高が3億円以上\n・作業船を使用した漁場工事または海上工事を伴う人工海底山脈造成工事の実績を有すること（元請として平成23年度～令和7年度に完成した長崎県内公共工事）\n・1級建設機械施工管理技士、1級土木施工管理技士、または技術士（建設・農業・森林・水産部門等）等の有資格者を主任技術者として専任配置可能\n・配置技術者は当該入札参加者と連続3ヶ月以上の直接的かつ恒常的な雇用関係にあること\n・「長崎県発注の港湾・漁港等の海上工事にかかる制限付き一般競争入札の入札参加資格要件となる一定の条件を備えた作業船の取り扱い要領」に定める作業船保有確認証を取得していること\n・令和8年度長崎県建設工事入札参加者格付要綱に基づく入札参加資格名簿に登載され、経営事項審査の有効期間が満了していないこと","【案件概要】\n長崎県水産部が実施する増殖場整備工事の総合評価型一般競争入札。長崎北地区九十九島工区その３地先において、増殖場工3,200m²及び石材着定基質1,440m³の整備を実施する。工期は155日間で、任意着手方式を採用し受注者が工事開始時期を設定可能。本工事は土木一式工事の特定建設業許可を有する県内業者を対象とした制限付一般競争入札で、施工能力３型の","総合評価落札方式を適用する。\n\n【業務内容】\n- 増殖場工の施工（3,200m²）\n- 石材着定基質の配置・工事（1,440m³）\n- 着定基質（MF礁2.1M型）の設置（32個）\n- 分別解体等及び特定建設資材廃棄物の再資源化\n- 週休２日モデル工事の実施\n- 快適トイレ設置\n\n【応募要件】\n- 土木工事業に係る特定建設業の許可を有すること\n- 土木一式工事に係る格付けAランク取得\n- 県北振興局建設部管内に主たる営業所を有し、総合数値950点以上・主観点数合計50点以上であること、または県内に主たる営業所を有し総合数値1,100点以上・主観点数合計100点以上であること\n- 土木一式工事における年間平均完成工事高が3億円以上\n- 作業船を使用した漁場工事または海上工事を伴う人工海底山脈造成工事を、平成23年度～令和7年度に元請として実績を有すること（県北管内実績者は1回以上、県内全域実績者は2回以上）\n- 1級建設機械施工管理技士、1級土木施工管理技士、または技術士（建設・農業・森林・水産部門等）等の有資格者を主任技術者（監理技術者）として専任配置可能\n- 配置技術者は当該入札参加者と連続3ヶ月以上の直接的かつ恒常的な雇用関係にあること\n- 「長崎県発注の港湾・漁港等の海上工事にかかる制限付き一般競争入札の入札参加資格要件となる一定の条件を備えた作業船の取り扱い要領」に定める作業船保有確認証を取得していること\n- 令和8年度長崎県建設工事入札参加者格付要綱に基づく入札参加資格名簿に登載され、経営事項審査の有効期間が満了していないこと\n\n【工期・期間】\n余裕期間：契約締結日から工事着手日の前日まで（工事着手期限は令和8年10月22日）\n実工期：工事開始日から155日間\n\n【支払い条件】\n前金払、中間前金払、部分払が可能（ただし工事開始後のみ前払金請求可能）\n\n【開札日時】\n令和8年9月18日（金曜日）午前9時20分\n長崎県庁6階入札室",true,"(redacted)","nagasaki-doboku-koukoku",[],false,[],[],{"id":6,"name":11,"categoryId":15,"parentId":15,"parentName":15,"bidInfoUrl":15},[34],{"year":35,"count":36},2026,5,{"sameOrganization":38,"samePrefecture":55,"similar":77},[39,44,47,50],{"id":40,"title":41,"organizationName":11,"prefectureName":12,"publishedDate":42,"deadlineDate":43,"budget":15,"status":16},3859928,"【総合評価】８漁港増第５－２号 五島地区増殖場整備工事（浜串工区その１）","2026-08-23T15:00:00.000Z","2026-09-14T15:00:00.000Z",{"id":45,"title":46,"organizationName":11,"prefectureName":12,"publishedDate":42,"deadlineDate":43,"budget":15,"status":16},3859927,"【総合評価】７漁港補増第３－３号 対馬地区増殖場整備工事（佐須奈工区その４）",{"id":48,"title":49,"organizationName":11,"prefectureName":12,"publishedDate":42,"deadlineDate":43,"budget":15,"status":16},3859926,"【総合評価】８漁港増第３－３号 対馬地区増殖場整備工事（豆酘工区その９）",{"id":51,"title":52,"organizationName":11,"prefectureName":12,"publishedDate":53,"deadlineDate":54,"budget":15,"status":16},2929988,"【総合評価】８漁港マ第５－３号 五島地区マウンド礁整備工事（その２）","2026-07-26T15:00:00.000Z","2026-09-13T15:00:00.000Z",[56,61,65,68,72],{"id":57,"title":58,"organizationName":59,"prefectureName":12,"publishedDate":13,"deadlineDate":60,"budget":15,"status":16},3918039,"高来船津地区汚水管渠工事(R8-1工区)","長崎県諫早市 上下水道局 契約課","2026-09-07T15:00:00.000Z",{"id":62,"title":63,"organizationName":64,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},3917994,"【総合評価】８債地改第１－１号 主要地方道長崎畝刈線（滑石工区）道路改良工事（橋梁下部工）","長崎振興局",{"id":66,"title":67,"organizationName":64,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},3917993,"【総合評価】８債長ダムメン第４－５号 長与ダムメンテナンス工事（放流設備更新）",{"id":69,"title":70,"organizationName":71,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},3917184,"分光蛍光光度計","長崎県環境保健研究センター １階 地域環境科 第４機器室（大村市池田2-1306",{"id":73,"title":74,"organizationName":12,"prefectureName":12,"publishedDate":75,"deadlineDate":76,"budget":15,"status":16},3907805,"軽自動車税申告書","2026-08-24T15:00:00.000Z","2026-09-02T15:00:00.000Z",[78,83,89,96,101],{"id":79,"title":80,"organizationName":81,"prefectureName":82,"publishedDate":75,"deadlineDate":15,"budget":15,"status":16},3907814,"入札公告の取りやめに関する公告(森林整備事業(誘導伐:密着造林型)請負:総合評価落札方式(簡易型))","林野庁九州森林管理局宮崎南部森林管理署","宮崎県",{"id":84,"title":85,"organizationName":86,"prefectureName":87,"publishedDate":75,"deadlineDate":88,"budget":15,"status":16},3907149,"令和8年度短寿命気候汚染物質削減のための気候と大気浄化の国際パートナーシップ(CCAC)等の情報収集支援等業務[総合評価落札方式]","環境省","東京都","2026-09-23T15:00:00.000Z",{"id":90,"title":91,"organizationName":92,"prefectureName":93,"publishedDate":75,"deadlineDate":94,"budget":95,"status":16},3886579,"【総合評価・週休2日・快適トイレ・建設キャリアアップ・電子契約】08国補橋修第08-04-490-0-001号 滝川橋修繕工事","茨城県 土木部 常陸大宮土木事務所大子工務所","茨城県","2026-09-15T15:00:00.000Z",120054000,{"id":97,"title":98,"organizationName":99,"prefectureName":93,"publishedDate":75,"deadlineDate":60,"budget":100,"status":16},3883343,"【総合評価】08県単橋修 第08-58-650-0-002号 外合併 長豊橋耐震・修繕工事(その2)","茨城県 土木部 竜ヶ崎工事事務所",73898000,{"id":102,"title":103,"organizationName":104,"prefectureName":93,"publishedDate":75,"deadlineDate":15,"budget":105,"status":16},3883342,"08県単急傾斜 第08-05-587-0-001号 07県単急傾斜 第07-05-587-0-002号 合併 急傾斜地崩壊対策工事 ※総合評価","茨城県 土木部 水戸土木事務所",30635000,[107,113,119,125],{"title":108,"link":109,"date":110,"thumb":111,"cat":112},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":114,"link":115,"date":116,"thumb":117,"cat":118},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":120,"link":121,"date":122,"thumb":123,"cat":124},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":126,"link":127,"date":128,"thumb":129,"cat":130},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]