[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-3906634":3,"bid-history-3906634":36,"bid-related-3906634":40,"union-latest":80},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":17,"bidCategoryName":18,"bidTypeName":19,"categoryText":20,"regionText":11,"deadlineTime":21,"openingDate":22,"qualificationText":23,"aiSummary":24,"aiSummaryGated":25,"aiSummaryTruncated":26,"sourceUrl":27,"dataSourceCode":28,"budgetTaxIncluded":15,"documentUrls":29,"businessExperience":26,"localOffice":26,"securityRequirement":26,"qualifications":31,"certifications":33,"organization":34},3906634,"鴨田分区汚水管渠築造工事(R6-5)外に伴う工作物等事後調査・算定委託業務(R8-1)",3246,39,7,42,1,"高知県高知市","高知県","2026-08-23T15:00:00.000Z","2026-09-07T15:00:00.000Z",null,"active","高知市上下水道局企画財務課契約担当","その他コンサルタント","一般競争入札","役務","17:00:00","2026-09-08T15:00:00.000Z","・高知市内に主たる営業所(本社)を有すること\n・高知市上下水道局の令和8・9年度測量・建設コンサルタント等業務一般競争(指名競争)入札参加審査申請において「補償コンサルタント」の申請があること\n・補償コンサルタント登録規程(昭和59年建設省告示第1341号)第2条第1項の規定による登録簿に登録(登録部門が事業損失部門)されていること\n・一般社団法人日本補償コンサルタント協会の付与する補償業務管理士の資格を有し、補償業務管理士登録台帳に登録部門が事業損失部門として登録された技術者が在籍すること\n・家屋又は工作物の事前(事後)調査を含む委託業務の完了・引き渡し実績を有すること","【案件概要】\n高知市上下水道局が、鴨田分区汚水管渠築造工事(R6-5)外に伴う工作物等事後調査・算定委託業務を電子入札による事後審査型制限付き一般競争入札で実施する。業務場所は高知市神田であり、履行日数は75日間。予定価格および最低制限価格は事後公表。本業務は高知市上下水道局保有個人情報取扱業務であり、個人情報の安全管理措置に関する誓約書の提出が必須となる。","【業務内容】\n- 工作物等事後調査(8件)：100㎡未満の工作物に関する事後調査\n- 工作物算定(8箇所)：100㎡未満の工作物に係る算定業務\n- 費用負担の説明：説明資料の作成等(8権利者分)\n\n【応募要件】\n- 高知市内に主たる営業所(本社)を有すること\n- 高知市上下水道局の令和8・9年度測量・建設コンサルタント等業務一般競争(指名競争)入札参加審査申請において「補償コンサルタント」の申請があること\n- 補償コンサルタント登録規程第2条第1項の規定による登録簿に登録(登録部門が事業損失部門)されていること\n- 一般社団法人日本補償コンサルタント協会の付与する補償業務管理士の資格を有し、補償業務管理士登録台帳に登録部門が事業損失部門として登録された技術者が在籍すること\n- 家屋又は工作物の事前(事後)調査を含む委託業務の完了・引き渡し実績を有すること(業務履行証明書等要)\n\n【工期・期間】\n履行日数75日間。入札書受付期間は令和8年9月4日8時00分から令和8年9月8日17時00分まで。開札予定日時は令和8年9月9日10時00分。落札者は落札決定の通知を受けた日から起算して10日以内に契約を締結すること。",true,"(redacted)","kkj",[30],{"url":27,"name":27},[32],4,[],{"id":6,"name":11,"categoryId":35,"parentId":15,"parentName":15,"bidInfoUrl":15},52,[37],{"year":38,"count":39},2026,2,{"sameOrganization":41,"samePrefecture":58,"similar":79},[42,45,48,51,54],{"id":43,"title":44,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},3906643,"春野町6号線道路改良工事(その2)",{"id":46,"title":47,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},3906642,"北本町三丁目非耐震性防火水槽撤去工事",{"id":49,"title":50,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},3906641,"大津乙字下ノ町水路整備工事",{"id":52,"title":53,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},3906640,"くろしおアリーナ自家発電設備オーバーホール業務委託に係る一般競争入札について(公告)",{"id":55,"title":56,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":57,"budget":15,"status":16},3906639,"北江ノ口分区下水道施設改良工事(R8-1)","2026-09-06T15:00:00.000Z",[59,64,68,73,76],{"id":60,"title":61,"organizationName":12,"prefectureName":12,"publishedDate":62,"deadlineDate":63,"budget":15,"status":16},3906646,"高知港海岸(桟橋通地区)高潮対策工事(港高潮(広域)第6-21号)","2026-08-24T15:00:00.000Z","2026-09-01T15:00:00.000Z",{"id":65,"title":66,"organizationName":12,"prefectureName":12,"publishedDate":62,"deadlineDate":67,"budget":15,"status":16},3906645,"高知港維持修繕工事(港維(緊自)第06-1-2号)","2026-09-13T15:00:00.000Z",{"id":69,"title":70,"organizationName":71,"prefectureName":12,"publishedDate":13,"deadlineDate":72,"budget":15,"status":16},3906644,"(上水第08036号)第1水源配水池更新工事【8月19日公告】","高知県香南市","2026-09-15T15:00:00.000Z",{"id":74,"title":75,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},3906638,"瀬戸水再生センターNo.1・2返送汚泥ポンプ更新工事(R8−1)",{"id":77,"title":78,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},3906637,"内ノ谷地区中継ポンプ更新工事",[],[81,87,93,99],{"title":82,"link":83,"date":84,"thumb":85,"cat":86},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":88,"link":89,"date":90,"thumb":91,"cat":92},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":94,"link":95,"date":96,"thumb":97,"cat":98},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":100,"link":101,"date":102,"thumb":103,"cat":104},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]