[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-3902721":3,"bid-history-3902721":40,"bid-related-3902721":41,"union-latest":65},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":6,"prefectureName":11,"publishedDate":12,"deadlineDate":13,"budget":6,"status":14,"department":15,"bidCategoryName":16,"bidTypeName":17,"categoryText":18,"regionText":19,"deadlineTime":20,"openingDate":21,"qualificationText":22,"aiSummary":23,"aiSummaryGated":24,"aiSummaryTruncated":25,"sourceUrl":26,"dataSourceCode":27,"budgetTaxIncluded":6,"documentUrls":28,"businessExperience":25,"localOffice":25,"securityRequirement":37,"qualifications":38,"certifications":39,"organization":6},3902721,"県立高崎商業高等学校 進路指導室、進路応接室空調機更新工事",null,10,2,20,1,"群馬県","2026-08-25T15:00:00.000Z","2026-09-08T15:00:00.000Z","active","群馬県立高崎商業高等学校","管・空調","一般競争入札","管","高崎市東貝沢町三丁目地内","16:00:00","2026-09-09T15:00:00.000Z","・群馬県建設工事入札参加資格者名簿に登載された者\n・群馬県の令和8・9年度建設工事入札参加資格者名簿における管工事の総合数値が850点以上の者\n・建設業法に基づく管工事について特定建設業の許可を受けている者\n・同種の工事である管工事を群馬県内で施工した実績を有する者（元請として平成28年4月1日から令和8年3月31日までに完成引渡しを完了した公共工事）\n・一級管工事施工管理技士の資格を有する監理技術者又は主任技術者を配置できること\n・高崎土木事務所管内に建設業法に基づき設置された本店があること\n・健康保険法、厚生年金保険法及び雇用保険法の規定による届出義務を履行している者\n・この工事に係る設計業務等の受託者でないこと、又は当該受託者と資本関係又は人的関係がない者","【案件概要】\n群馬県立高崎商業高等学校が、進路指導室及び進路応接室の老朽化した空調設備の更新工事を一般競争入札により実施する。工事場所は高崎市東貝沢町三丁目地内。工事内容は管工事であり、予定価格は公告には明記されていないが、工事期間は令和8年9月～令和9年1月の約4ヶ月である。本工事は事後審査方式の一般競争入札であり、フレックス工期による契約方式が適用される","。\n\n【業務内容】\n- 進路指導室の空調機更新\n- 進路応接室の空調機更新\n- 既存空調設備の撤去\n- 新規空調機器の設置・接続\n- 配管・制御系統の整備\n\n【応募要件】\n- 群馬県建設工事入札参加資格者名簿に登載された者\n- 群馬県の令和8・9年度建設工事入札参加資格者名簿における管工事の総合数値が850点以上の者\n- 建設業法に基づく管工事について特定建設業の許可を受けている者\n- 同種の工事である管工事を群馬県内で施工した実績を有する者（元請として平成28年4月1日から令和8年3月31日までに完成引渡しを完了した公共工事）\n- 一級管工事施工管理技士の資格を有する監理技術者又は主任技術者を工事期間中に配置できること\n- 高崎土木事務所管内に建設業法に基づき設置された本店があること\n- 健康保険法、厚生年金保険法及び雇用保険法の規定による届出義務を履行している者\n- この工事に係る設計業務等の受託者でないこと、又は当該受託者と資本関係又は人的関係がない者\n- 破産者で復権を得ない者でないこと\n- 群馬県財務規則第170条第2項に規定する入札参加制限を受けていない者\n- 群馬県建設工事請負業者等指名停止措置要綱第2条第2項に規定する指名停止を受けていない者\n\n【工期・期間】\n工事期間：令和8年9月～令和9年1月（約4ヶ月）\n完成期日：令和9年1月13日\nフレックス工期制度により、落札者は工事開始期限日以前の任意の日を契約工期の始期日、工事完成期限日までの間の任意の日を契約工期の終期日に設定することができる。",true,"(redacted)","gunma-cals",[29,30,31,32,33,34,35,36],{"url":26,"name":26},{"url":26,"name":26},{"url":26,"name":26},{"url":26,"name":26},{"url":26,"name":26},{"url":26,"name":26},{"url":26,"name":26},{"url":26,"name":26},false,[],[],[],{"sameOrganization":42,"samePrefecture":43,"similar":64},[],[44,47,51,54,61],{"id":45,"title":46,"organizationName":6,"prefectureName":11,"publishedDate":12,"deadlineDate":6,"budget":6,"status":14},3902723,"公益財団法人群馬県建設技術センター 執務室のレイアウト変更",{"id":48,"title":49,"organizationName":50,"prefectureName":11,"publishedDate":12,"deadlineDate":6,"budget":6,"status":14},3902722,"令和08年度 県単治山事業(測量調査委託) 吾妻郡 嬬恋村大字今井(中林)地内","群馬県環境森林部吾妻環境森林事務所",{"id":52,"title":53,"organizationName":50,"prefectureName":11,"publishedDate":12,"deadlineDate":6,"budget":6,"status":14},3902720,"令和08年度 県単治山事業 吾妻郡 嬬恋村大字芦生田(北畑2)地内",{"id":55,"title":56,"organizationName":57,"prefectureName":11,"publishedDate":58,"deadlineDate":59,"budget":60,"status":14},3887728,"補助公共 社会資本総合整備(防災・安全・一般) 小根山橋耐震補強設計業務 一般県道 小根山森林公園線 小根山橋 安中市松井田町横川 地内","群馬県県土整備部安中土木事務所","2026-08-24T15:00:00.000Z","2026-10-15T15:00:00.000Z",40000000,{"id":62,"title":63,"organizationName":6,"prefectureName":11,"publishedDate":58,"deadlineDate":6,"budget":6,"status":14},3887727,"県央第二水道 1-2系PAC注入配管更新外工事",[],[66,72,78,84],{"title":67,"link":68,"date":69,"thumb":70,"cat":71},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":73,"link":74,"date":75,"thumb":76,"cat":77},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":79,"link":80,"date":81,"thumb":82,"cat":83},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":85,"link":86,"date":87,"thumb":88,"cat":89},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]