[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-3885125":3,"bid-related-3885125":38,"bid-history-3885125":99,"union-latest":103},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":17,"bidCategoryName":18,"bidTypeName":19,"categoryText":20,"regionText":21,"deadlineTime":22,"openingDate":23,"qualificationText":24,"aiSummary":25,"aiSummaryGated":26,"aiSummaryTruncated":27,"sourceUrl":28,"dataSourceCode":29,"budgetTaxIncluded":15,"documentUrls":30,"businessExperience":27,"localOffice":27,"securityRequirement":32,"qualifications":33,"certifications":35,"organization":36},3885125,"令和8年度 41号上麻生防災白川地区道路建設工事",252,21,2,14,1,"国土交通省中部地方整備局","岐阜県","2026-08-24T15:00:00.000Z","2026-09-03T15:00:00.000Z",null,"active","岐阜国道事務所","土木","一般競争入札","一般土木工事","岐阜県加茂郡白川町～岐阜県加茂郡東白川村","16:00:00","2026-10-07T15:00:00.000Z","・中部地方整備局（港湾空港関係を除く）の一般土木工事に係るＣ等級の令和7・8年度一般競争参加資格の認定を受けていること\n・平成23年度以降に元請けとして排水構造物の施工実績を有すること（共同企業体の構成員の場合は出資比率20%以上が対象。共同企業体の各構成員は全員が何らかの同種工事実績を有すること）\n・監理技術者又は主任技術者を工事に専任で配置できること。監理技術者が必要な場合は監理技術者資格者証及び監理技術者講習修了証を有する者であること\n・競争参加資格確認申請提出期限から開札時まで指名停止を受けていないこと\n・令和4年4月1日から令和8年3月31日までの4年間に中部地方整備局から受注した同工事種別の工事成績評定点平均が65点以上（過去実績がある場合）\n・本工事の設計業務等の受託者及び関連企業でないこと\n・入札参加者間に資本関係又は人的関係がないこと\n・建設業法に基づく本店、支店又は営業所が指定区域（岐阜県内の指定市町村）に所在し、支店又は営業所の場合は岐阜県内に本店を有すること\n・暴力団員が実質的に経営を支配する建設業者でないこと","【案件概要】\n国土交通省中部地方整備局岐阜国道事務所が令和８年度41号上麻生防災白川地区道路建設工事の一般競争入札（電子入札対象、電子契約対象）を実施する。岐阜県加茂郡白川町および東白川村を対象地域とした道路建設工事で、工事延長600m（白川町三川地区500m、東白川村五加地区100m）である。総合評価落札方式（施工体制確認型総合評価落札方式・施工能力評価型","Ⅱ型）により、価格と施工能力を総合的に評価して落札者を決定する。工期は契約締結日の翌日から令和9年11月19日までで、令和8年11月18日までに工事の始期を設定する必要がある。本工事は試行工事として、フレックス工期、総価契約単価合意方式、出来高部分払方式、契約後ＶＥ方式、生産性向上チャレンジなど多くの新しい施工方法を採用している。\n\n【業務内容】\n- 白川町三川地区における道路土工（工事延長500m）\n- 舗装工（アスファルト舗装等）\n- 排水構造物工（側溝、横断溝、集水桝等の施工）\n- 構造物撤去工（既存施設の撤去）\n- 仮設工（仮囲い、仮道路、足場等）\n- 東白川村五加地区における道路関連仮設工（工事延長100m）\n\n【応募要件】\n- 中部地方整備局（港湾空港関係を除く）の一般土木工事に係るＣ等級の令和7・8年度一般競争参加資格の認定を受けていること\n- 平成23年度以降に元請けとして、排水構造物の施工実績を有すること（共同企業体の場合、構成員の出資比率が20%以上の場合のみ）。施工延長1,000m以上の実績がより同種性が高いと評価される\n- 監理技術者又は主任技術者を当該工事に専任で配置できること。監理技術者が必要な工事では、配置予定技術者が監理技術者資格者証及び監理技術者講習修了証を有する者であること\n- 競争参加資格確認申請書提出期限から開札時までの期間に、指名停止を受けていないこと\n- 令和4年4月1日から令和8年3月31日までの4年間に中部地方整備局が発注した同工事種別の工事成績評定点平均が65点以上であること（実績がある場合）\n- 本工事の設計業務等の受託者及び関連企業でないこと\n- 入札参加者間に資本関係又は人的関係がないこと\n- 建設業法に基づく本店、支店又は営業所が岐阜県の指定区域（岐阜市、大垣市、関市、美濃市、羽島市、美濃加茂市、各務原市、可児市、山県市、瑞穂市、本巣市、郡上市、海津市、羽島郡全域、本巣郡北方町、養老郡養老町、不破郡全域、安八郡全域、揖斐郡全域、加茂郡全域、可児郡御嵩町）に所在すること。支店又は営業所の場合は岐阜県内に本店が所在すること\n- 暴力団員が実質的に経営を支配する建設業者でないこと\n\n【工期・期間】\n契約締結日の翌日から令和9年11月19日まで。ただし、令和8年11月18日までに工事の始期を設定すること。受注者は契約全体工期内で工事の始期を任意に設定できるフレックス工期を採用している。前余裕期間（契約締結から工事始期前日までの期間）内は、監理技術者等を配置することを要せず、資機材の手配、下請業者との契約、発注者との打合せなどの準備業務が可能。",true,"(redacted)","ippi-koji",[31],{"url":28,"name":28},false,[34],3,[],{"id":6,"name":11,"categoryId":37,"parentId":15,"parentName":15,"bidInfoUrl":15},17,{"sameOrganization":39,"samePrefecture":59,"similar":78},[40,45,48,51,55],{"id":41,"title":42,"organizationName":11,"prefectureName":43,"publishedDate":13,"deadlineDate":44,"budget":15,"status":16},3885176,"令和8年度 天竜川水系下伊那管内測量業務","長野県","2026-09-07T15:00:00.000Z",{"id":46,"title":47,"organizationName":11,"prefectureName":43,"publishedDate":13,"deadlineDate":44,"budget":15,"status":16},3885175,"令和8年度 天竜川水系砂防管内測量業務",{"id":49,"title":50,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":44,"budget":15,"status":16},3885174,"令和8年度 156号岩田坂歩道整備用地調査業務",{"id":52,"title":53,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":54,"budget":15,"status":16},3885173,"令和8年度 東海環状事業計画検討業務","2026-09-23T15:00:00.000Z",{"id":56,"title":57,"organizationName":11,"prefectureName":58,"publishedDate":13,"deadlineDate":44,"budget":15,"status":16},3885172,"令和8年度 四日市地下駐車場事業工程計画作成業務","三重県",[60,64,68,72,75],{"id":61,"title":62,"organizationName":12,"prefectureName":12,"publishedDate":13,"deadlineDate":63,"budget":15,"status":16},3886562,"県単 道路新設改良(一般分) 道路詳細設計 委託","2026-08-31T15:00:00.000Z",{"id":65,"title":66,"organizationName":12,"prefectureName":12,"publishedDate":13,"deadlineDate":67,"budget":15,"status":16},3886560,"公共 砂防メンテナンス事業(債務)クレ石谷(松尾谷)堰堤補修工事","2026-08-30T15:00:00.000Z",{"id":69,"title":70,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":71,"budget":15,"status":16},3885168,"令和8年度 岐阜国道事務所管内積算技術業務","2026-09-14T15:00:00.000Z",{"id":73,"title":74,"organizationName":12,"prefectureName":12,"publishedDate":13,"deadlineDate":67,"budget":15,"status":16},3885145,"県営中山間地域総合整備事業 揖斐川北西部地区 乙門集落排水路工事",{"id":76,"title":77,"organizationName":12,"prefectureName":12,"publishedDate":13,"deadlineDate":63,"budget":15,"status":16},3885144,"県単 都市公園事業 工事",[79,85,90,93,96],{"id":80,"title":81,"organizationName":82,"prefectureName":83,"publishedDate":13,"deadlineDate":84,"budget":15,"status":16},3892009,"令和8年度漁業調査指導船「いばらき丸」点検整備工事(水産試験場)","茨城県 農林水産部 水産試験場","茨城県","2026-09-13T15:00:00.000Z",{"id":86,"title":87,"organizationName":88,"prefectureName":89,"publishedDate":13,"deadlineDate":15,"budget":15,"status":16},3887870,"令和8年度 配水管布設替工事(その2)","宮代町 企画財政課 企画財政室","埼玉県",{"id":91,"title":92,"organizationName":88,"prefectureName":89,"publishedDate":13,"deadlineDate":15,"budget":15,"status":16},3887869,"令和8年度 宮代第5号汚水幹線・枝線布設替工事",{"id":94,"title":95,"organizationName":88,"prefectureName":89,"publishedDate":13,"deadlineDate":15,"budget":15,"status":16},3887868,"令和8年度 舗装復旧工事(その3)",{"id":97,"title":98,"organizationName":88,"prefectureName":89,"publishedDate":13,"deadlineDate":15,"budget":15,"status":16},3887867,"令和8年度 舗装復旧工事(その4)",[100],{"year":101,"count":102},2026,320,[104,110,116,122],{"title":105,"link":106,"date":107,"thumb":108,"cat":109},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":111,"link":112,"date":113,"thumb":114,"cat":115},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":117,"link":118,"date":119,"thumb":120,"cat":121},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":123,"link":124,"date":125,"thumb":126,"cat":127},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]