[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-3885122":3,"bid-history-3885122":37,"bid-related-3885122":41,"union-latest":86},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":17,"bidCategoryName":18,"bidTypeName":19,"categoryText":20,"regionText":21,"deadlineTime":22,"openingDate":23,"qualificationText":24,"aiSummary":25,"aiSummaryGated":26,"aiSummaryTruncated":27,"sourceUrl":28,"dataSourceCode":29,"budgetTaxIncluded":15,"documentUrls":30,"businessExperience":27,"localOffice":27,"securityRequirement":32,"qualifications":33,"certifications":34,"organization":35},3885122,"南町排水機場発電設備工事",1426,7,2,21,1,"国土交通省東北地方整備局","福島県","2026-08-24T15:00:00.000Z","2026-08-31T15:00:00.000Z",null,"active","福島河川国道事務所","電気","一般競争入札","受変電設備工事","福島県福島市南町310-4","14:00:00","2026-10-07T15:00:00.000Z","・東北地方整備局における令和7・8年度一般競争参加資格の受変電設備工事認定を受けていること\n・平成23年4月1日以降に発電設備工事における「新設・更新・製造」いずれかの施工実績を元請けとして有していること（共同企業体構成員の場合は出資比率20%以上、乙型の場合は分担工事実績）\n・当該施工実績が適切であること（指名停止や工事成績評定点65点未満でないこと）\n・主任技術者、監理技術者又は特例監理技術者を本工事に配置できること\n・配置技術者は平成23年4月1日以降に発電設備工事における施工経験を有する者\n・監理技術者又は特例監理技術者は監理技術者資格者証及び監理技術者講習修了証を有する者\n・主任技術者は登録基幹技能者講習修了証を有する者も要件を満たす\n・申請期限日から開札時までの間に指名停止を受けていないこと\n・本工事設計業務受託者でないこと\n・入札参加者間に資本関係又は人的関係がないこと\n・東北地方整備局管内に建設業許可に基づく本社・支店・営業所のいずれかが所在すること\n・令和4年度から令和7年度の受変電設備工事における工事成績評定点の平均が65点未満でないこと\n・暴力団員が実質的に経営を支配する建設業者でないこと\n・主たる設備製作に係る設計管理、工程管理及び検査・試験の品質管理を自ら行える体制を有していること\n・経常建設共同企業体（甲型）の場合は全構成員が対象要件を満たし、うち1社が主要要件を満たすこと","【案件概要】\n国土交通省東北地方整備局福島河川国道事務所が南町排水機場発電設備工事の一般競争入札（同時提出型）を実施する。工事場所は福島県福島市南町310-4。発動発電設備一式の新設・更新・製造工事で、総合評価落札方式（施工能力評価型）が適用される。工期は契約締結日の翌日から令和10年2月29日まで。公告日は令和8年8月25日、申請書提出期限は9月1日午後2","時、確認資料提出期限及び入札締切は9月10日午後2時、開札日は10月8日午前10時。\n\n【業務内容】\n- 発動発電設備一式の製作・施工\n- 受変電設備工事における新設・更新対応\n- 主要設備の設計管理・工程管理・品質管理\n- 契約後VE方式による施工方法等の提案対応\n- 生産性向上チャレンジ試行への対応\n\n【応募要件】\n- 東北地方整備局における令和7・8年度一般競争参加資格認定の受変電設備工事を受けていること\n- 平成23年4月1日以降に発電設備工事における「新設・更新・製造」いずれかの施工実績を有する元請企業（共同企業体構成員の場合は出資比率20%以上、乙型の場合は分担工事実績）\n- 工事成績評定点が65点未満でないこと（大臣官房官庁営繕部等発注工事の場合）\n- 主任技術者、監理技術者又は特例監理技術者を配置可能であり、平成23年4月1日以降に発電設備工事における施工経験を有する者\n- 監理技術者又は特例監理技術者は監理技術者資格者証及び監理技術者講習修了証を保有\n- 主任技術者は登録基幹技能者講習修了証を有する者も要件を満たす\n- 申請期限日から開札時までの間に指名停止を受けていないこと\n- 本工事設計業務受託者でないこと\n- 入札参加者間に資本関係又は人的関係がないこと\n- 東北地方整備局管内に建設業許可（当該工事対応建設業種）に基づく本社・支店・営業所のいずれかが所在すること\n- 令和4年度から令和7年度の受変電設備工事における工事成績評定点の平均が65点未満でないこと（実績がない場合は要件としない）\n- 暴力団員が実質的に経営を支配する建設業者でないこと\n- 主たる設備製作に係る設計管理、工程管理、検査・試験の品質管理を自ら行える体制を有すること\n- 経常建設共同企業体（甲型）の場合は全構成員が上記要件を満たし、うち1社が主要要件を満たすこと\n\n【工期・期間】\n全体工期：契約締結日の翌日から令和10年2月29日（工事完成期限）まで\nフレックス方式により、受注者は余裕期間と実工期を合わせた全体工期内で工事の始期及び終期を任意に設定可能\n主任技術者の専任配置は令和9年12月中旬からを予定",true,"(redacted)","ippi-koji",[31],{"url":28,"name":28},false,[],[],{"id":6,"name":11,"categoryId":36,"parentId":15,"parentName":15,"bidInfoUrl":15},17,[38],{"year":39,"count":40},2026,298,{"sameOrganization":42,"samePrefecture":67,"similar":85},[43,48,53,57,62],{"id":44,"title":45,"organizationName":11,"prefectureName":46,"publishedDate":13,"deadlineDate":47,"budget":15,"status":16},3886561,"東北港湾のバルクターミナルにおけるPSカードシステム導入検討業務","宮城県","2026-09-03T15:00:00.000Z",{"id":49,"title":50,"organizationName":11,"prefectureName":51,"publishedDate":13,"deadlineDate":52,"budget":15,"status":16},3886559,"青森港油川地区航路・泊地(-12m)外浚渫工事","青森県","2026-10-25T15:00:00.000Z",{"id":54,"title":55,"organizationName":11,"prefectureName":56,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},3885123,"四十四田ダム管内テレメータ空中線設備等工事","岩手県",{"id":58,"title":59,"organizationName":11,"prefectureName":12,"publishedDate":60,"deadlineDate":61,"budget":15,"status":16},3860445,"F-REI(26)本部棟外工事監理業務","2026-08-23T15:00:00.000Z","2026-09-06T15:00:00.000Z",{"id":63,"title":64,"organizationName":11,"prefectureName":65,"publishedDate":60,"deadlineDate":66,"budget":15,"status":16},3860444,"月山地すべり防止施設点検業務","山形県","2026-09-13T15:00:00.000Z",[68,73,76,79,82],{"id":69,"title":70,"organizationName":71,"prefectureName":12,"publishedDate":60,"deadlineDate":72,"budget":15,"status":16},3883150,"第2026003102号​","福島県郡山市","2026-09-07T15:00:00.000Z",{"id":74,"title":75,"organizationName":71,"prefectureName":12,"publishedDate":60,"deadlineDate":72,"budget":15,"status":16},3883149,"第2026003134号​​​",{"id":77,"title":78,"organizationName":71,"prefectureName":12,"publishedDate":60,"deadlineDate":72,"budget":15,"status":16},3883148,"第2026003079号",{"id":80,"title":81,"organizationName":71,"prefectureName":12,"publishedDate":60,"deadlineDate":72,"budget":15,"status":16},3883147,"第2026003136号",{"id":83,"title":84,"organizationName":71,"prefectureName":12,"publishedDate":60,"deadlineDate":47,"budget":15,"status":16},3883146,"2026年8月24日更新道路維持管理支援システム構築及び運用保守業務委託に係る制限付一般競争入札について(紙入札)",[],[87,93,99,105],{"title":88,"link":89,"date":90,"thumb":91,"cat":92},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":94,"link":95,"date":96,"thumb":97,"cat":98},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":100,"link":101,"date":102,"thumb":103,"cat":104},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":106,"link":107,"date":108,"thumb":109,"cat":110},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]