[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-3885119":3,"bid-history-3885119":37,"bid-related-3885119":41,"union-latest":100},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":17,"bidCategoryName":18,"bidTypeName":19,"categoryText":20,"regionText":21,"deadlineTime":22,"openingDate":23,"qualificationText":24,"aiSummary":25,"aiSummaryGated":26,"aiSummaryTruncated":27,"sourceUrl":28,"dataSourceCode":29,"budgetTaxIncluded":15,"documentUrls":30,"businessExperience":27,"localOffice":27,"securityRequirement":32,"qualifications":33,"certifications":34,"organization":35},3885119,"令和8年度小禄道路赤嶺トンネル舗装(その1)工事",1425,47,2,15,1,"内閣府沖縄総合事務局開発建設部","沖縄県","2026-08-24T15:00:00.000Z","2026-09-16T15:00:00.000Z",null,"active","南部国道事務所","舗装","一般競争入札","セメント・コンクリート舗装工事","沖縄県那覇市安次嶺～赤嶺地内","12:00:00","2026-11-10T15:00:00.000Z","・沖縄総合事務局における令和7・8年度一般競争参加資格のうち「セメント・コンクリート舗装工事」の認定を受けていること\n・平成23年4月1日から技術資料等提出期限日までに、元請けとしてコンクリート舗装の施工実績を有すること（共同企業体の場合は出資比率20％以上）\n・1級土木施工管理技士又はこれと同等以上の資格を有する主任技術者又は監理技術者を専任配置できること\n・配置予定監理技術者にあっては、監理技術者資格者証及び監理技術者講習修了証を有すること\n・配置予定技術者は直接的かつ恒常的な雇用関係がある者であること\n・沖縄総合事務局開発建設部発注工事で過去2年度の工事成績評定点の平均点が2年連続で60点未満でないこと\n・沖縄県内に建設業法に基づく本店、支店又は営業所が所在すること\n・予決令第70条及び第71条の規定に該当しないこと\n・指名停止を受けていないこと\n・設計業務等受託者と資本又は人事面において関連がないこと\n・入札参加者間に資本関係又は人的関係がないこと\n・暴力団員が実質的に経営を支配する者でないこと","【案件概要】\n沖縄総合事務局南部国道事務所が実施する令和8年度小禄道路赤嶺トンネル舗装工事。本案件は技術資料等を共通化できる2件の工事を対象に一括公告し、一般競争入札総合評価落札方式（施工体制確認型）により実施される。工事場所は沖縄県那覇市安次嶺～赤嶺地内で、舗装工及び区画線工を施工対象とする。公告日は令和8年8月25日、申請書・技術資料等の提出期限は令和8","年9月17日12時00分、開札日は令和8年11月11日9時30分。予算規模は記載がない。本工事は複数の試行工事が含まれており、施工体制評価、地元企業下請活用評価、BIM\u002FCIM活用等の先進的施工方法の導入を推進している。\n\n【業務内容】\n- セメント・コンクリート舗装工事の施工\n- 区画線工の施工\n- 3次元データを活用したICT活用工事（施工者希望型II型）への対応\n- 新技術1技術以上の選択・活用\n- 契約後の施工方法等提案（契約後VE方式）\n- 分別解体等及び特定建設資材廃棄物の再資源化\n- i-Construction推進に基づくICT全面活用\n- BIM\u002FCIM導入による建設生産・管理システムの効率化\n\n【応募要件】\n- 沖縄総合事務局における令和7・8年度一般競争参加資格のうち「セメント・コンクリート舗装工事」の認定を受けていること\n- 平成23年4月1日から技術資料等提出期限日までに、元請けとしてコンクリート舗装の施工実績を有すること（共同企業体の場合は出資比率20％以上）\n- 1級土木施工管理技士又はこれと同等以上の資格を有する主任技術者又は監理技術者を専任配置できること\n- 配置予定監理技術者にあっては、監理技術者資格者証及び監理技術者講習修了証を有すること\n- 配置予定技術者は直接的かつ恒常的な雇用関係がある者であること\n- 沖縄総合事務局開発建設部発注工事で過去2年度の工事成績評定点の平均点が2年連続で60点未満でないこと\n- 沖縄県内に建設業法に基づく本店、支店又は営業所が所在すること\n- 予決令第70条及び第71条の規定に該当しないこと\n- 指名停止を受けていないこと\n- 設計業務等受託者と資本又は人事面において関連がないこと\n- 入札参加者間に資本関係又は人的関係がないこと\n- 暴力団員が実質的に経営を支配する者でないこと\n\n【工期・期間】\n（その1）契約締結日の翌日から令和9年7月15日まで（余裕期間制度活用工事）\n（その2）契約締結日の翌日から令和9年6月30日まで（余裕期間制度活用工事）\n受注者の円滑な工事施工体制確保を図るため、事前に建設資材・労働者確保等の準備を行うことができる余裕期間を設定",true,"(redacted)","ippi-koji",[31],{"url":28,"name":28},false,[],[],{"id":6,"name":11,"categoryId":36,"parentId":15,"parentName":15,"bidInfoUrl":15},10,[38],{"year":39,"count":40},2026,53,{"sameOrganization":42,"samePrefecture":60,"similar":82},[43,46,49,52,55],{"id":44,"title":45,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},3885120,"令和8年度小禄道路赤嶺トンネル舗装(その2)工事",{"id":47,"title":48,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},3885118,"令和8年度小禄道路橋梁附属施設設置(P30~P45)工事",{"id":50,"title":51,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},3885117,"令和8年度小禄道路橋梁附属施設設置(下りP19~P30)工事",{"id":53,"title":54,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},3885116,"令和8年度小禄道路橋梁附属施設設置(上りP19~P30)工事",{"id":56,"title":57,"organizationName":11,"prefectureName":12,"publishedDate":58,"deadlineDate":59,"budget":15,"status":16},3601038,"令和8年度小禄道路橋梁床版工(上下P19~P24)工事","2026-08-18T15:00:00.000Z","2026-09-13T15:00:00.000Z",[61,67,70,74,77],{"id":62,"title":63,"organizationName":64,"prefectureName":12,"publishedDate":65,"deadlineDate":66,"budget":15,"status":16},3882963,"沖縄職業能力開発促進センター第三職員宿舎LED更新業務 一式 (PDF 96 KB)","独立行政法人高齢・障害・求職者雇用支援機構沖縄支部","2026-08-23T15:00:00.000Z","2026-09-07T15:00:00.000Z",{"id":68,"title":69,"organizationName":64,"prefectureName":12,"publishedDate":65,"deadlineDate":66,"budget":15,"status":16},3882962,"沖縄職業能力開発促進センター大教室空調設備更新業務 一式 (PDF 96 KB)",{"id":71,"title":72,"organizationName":73,"prefectureName":12,"publishedDate":65,"deadlineDate":66,"budget":15,"status":16},3882961,"令和8年 度粟国村給水管布設工事に関する一般競争入札の実施について","沖縄県粟国村",{"id":75,"title":76,"organizationName":73,"prefectureName":12,"publishedDate":65,"deadlineDate":66,"budget":15,"status":16},3882960,"令和8年度粟国村配水管布設工事に関する一般競争入札の実施について",{"id":78,"title":79,"organizationName":80,"prefectureName":12,"publishedDate":65,"deadlineDate":81,"budget":15,"status":16},3882959,"令和8年度西表石垣国立公園海域公園地区等におけるサンゴ礁保全(オニヒトデ駆除等)業務[最低価格落札方式]","環境省沖縄奄美自然環境事務所","2026-09-14T15:00:00.000Z",[83,88,91,94,97],{"id":84,"title":85,"organizationName":86,"prefectureName":87,"publishedDate":13,"deadlineDate":15,"budget":15,"status":16},3887870,"令和8年度 配水管布設替工事(その2)","宮代町 企画財政課 企画財政室","埼玉県",{"id":89,"title":90,"organizationName":86,"prefectureName":87,"publishedDate":13,"deadlineDate":15,"budget":15,"status":16},3887869,"令和8年度 宮代第5号汚水幹線・枝線布設替工事",{"id":92,"title":93,"organizationName":86,"prefectureName":87,"publishedDate":13,"deadlineDate":15,"budget":15,"status":16},3887868,"令和8年度 舗装復旧工事(その3)",{"id":95,"title":96,"organizationName":86,"prefectureName":87,"publishedDate":13,"deadlineDate":15,"budget":15,"status":16},3887867,"令和8年度 舗装復旧工事(その4)",{"id":98,"title":99,"organizationName":86,"prefectureName":87,"publishedDate":13,"deadlineDate":15,"budget":15,"status":16},3887865,"令和8年度 華蔵院橋外3橋修繕工事",[101,107,113,119],{"title":102,"link":103,"date":104,"thumb":105,"cat":106},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":108,"link":109,"date":110,"thumb":111,"cat":112},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":114,"link":115,"date":116,"thumb":117,"cat":118},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":120,"link":121,"date":122,"thumb":123,"cat":124},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]