[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-3883169":3,"bid-history-3883169":37,"bid-related-3883169":41,"union-latest":85},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":17,"bidCategoryName":18,"bidTypeName":19,"categoryText":20,"regionText":11,"deadlineTime":21,"openingDate":22,"qualificationText":23,"aiSummary":24,"aiSummaryGated":25,"aiSummaryTruncated":26,"sourceUrl":27,"dataSourceCode":28,"budgetTaxIncluded":26,"documentUrls":29,"businessExperience":26,"localOffice":26,"securityRequirement":31,"qualifications":32,"certifications":33,"organization":34},3883169,"染南線道路改良工事(25-102036)(PDF:114KB)",339,18,2,14,1,"福井県鯖江市","福井県","2026-08-23T15:00:00.000Z","2026-09-01T15:00:00.000Z",42284000,"active","鯖江市 土木課（工事等）\u002F 鯖江市 財務管理課（入札事務）","土木","一般競争入札","工事","16:00:00","2026-09-02T15:00:00.000Z","・令和7・8年度の格付における土木工事業A等級に登録されている者\n・令和7年度除雪協力業者(2.5km以上)の指定を受けている者\n・鯖江市内に本社を有する者\n・鯖江市工事等入札参加資格者名簿に登載されている者で、対象業種の指定等級に登録されている者\n・地方自治法施行令第167条の4の規定に該当しない者\n・建設業法第26条に定める技術者および現場代理人等必要な人員を配置できる者\n・鯖江市工事等請負契約に係る指名停止等の指名停止を受けていない者","【案件概要】\n福井県鯖江市が実施する制限付一般競争入札。染南線道路改良工事の実施に伴う案件。設計額は42,284,000円（消費税および地方消費税相当分を含む）。工事場所は鯖江市神中町2丁目地係。工事延長L=78.0m、自由勾配側溝(400*500)縦断用L=3.5m、自由勾配側溝(400*600)L=129.5m等を施工。電子入札による事後審査型の実施。最","低制限価格あり、契約保証金は契約金額の10%。\n\n【業務内容】\n- 道路改良工事の実施\n- 工事延長L=78.0mの道路施工\n- 自由勾配側溝(400*500)縦断用L=3.5m設置\n- 自由勾配側溝(400*600)L=129.5m設置\n- その他付帯工事\n\n【応募要件】\n- 令和7・8年度の格付における土木工事業A等級に登録されている者\n- 令和7年度除雪協力業者(2.5km以上)の指定を受けている者\n- 鯖江市内に本社を有する者\n- 鯖江市工事等入札参加資格者名簿に登載されている者で、対象業種の指定等級に登録されている者\n- 地方自治法施行令第167条の4の規定に該当しない者\n- 建設業法第26条に定める技術者および現場代理人等必要な人員を配置できる者\n- 鯖江市工事等請負契約に係る指名停止等を受けていない者\n- 入札参加資格確認申請書を提出した者\n- 配置予定の現場代理人および監理技術者等の資格、経歴、経験等を明示できる者\n\n【工期・期間】\n契約締結日から令和9年3月26日まで。入札受付期間は令和8年9月1日(火)08時30分から令和8年9月2日(水)16時00分。開札日時は令和8年9月3日(木)10時00分。",true,"(redacted)","kkj",[30],{"url":27,"name":27},false,[],[],{"id":6,"name":11,"categoryId":35,"parentId":36,"parentName":36,"bidInfoUrl":36},52,null,[38],{"year":39,"count":40},2026,110,{"sameOrganization":42,"samePrefecture":63,"similar":84},[43,47,51,55,59],{"id":44,"title":45,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":46,"status":16},3883175,"鯖江中学校法面保護工事(PDF:112KB)",5907000,{"id":48,"title":49,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":50,"status":16},3883174,"鯖江中学校校地整地工事(PDF:113KB)",3927000,{"id":52,"title":53,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":54,"status":16},3883173,"橋立水落線舗装改良工事(26-102025)(PDF:119KB)",3894000,{"id":56,"title":57,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":58,"status":16},3883172,"徳尾上河端線舗装改良工事(26-102026)(PDF:119KB)",8833000,{"id":60,"title":61,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":62,"status":16},3883171,"石田下司線舗装改良工事(26-203022)(PDF:120KB)",4763000,[64,68,72,76,80],{"id":65,"title":66,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":67,"status":16},3883170,"神中西鳥羽線道路改良工事(26-102007)(PDF:116KB)",11704000,{"id":69,"title":70,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":71,"status":16},3883168,"別所川島線道路法面補修工事(26-201021)(PDF:114KB)",4004000,{"id":73,"title":74,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":75,"status":16},3883167,"吉江西番線消雪施設工事その1(26-102023)(PDF:115KB)",8657000,{"id":77,"title":78,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":79,"status":16},3883166,"県単土地改良第3号工事(田村・揚水ポンプ)(PDF:113KB)",4499000,{"id":81,"title":82,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":83,"status":16},3883165,"丸山公園休憩施設更新工事(PDF:113KB)",6963000,[],[86,92,98,104],{"title":87,"link":88,"date":89,"thumb":90,"cat":91},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":93,"link":94,"date":95,"thumb":96,"cat":97},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":99,"link":100,"date":101,"thumb":102,"cat":103},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":105,"link":106,"date":107,"thumb":108,"cat":109},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]