[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-3875816":3,"bid-history-3875816":41,"bid-related-3875816":47,"union-latest":111},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":11,"bidCategoryName":17,"bidTypeName":18,"categoryText":19,"regionText":20,"deadlineTime":21,"openingDate":22,"qualificationText":23,"aiSummary":24,"aiSummaryGated":25,"aiSummaryTruncated":26,"sourceUrl":27,"dataSourceCode":28,"budgetTaxIncluded":15,"documentUrls":29,"businessExperience":26,"localOffice":26,"securityRequirement":36,"qualifications":37,"certifications":38,"organization":39},3875816,"令和8年度ぐんま学園体育館改修機械設備工事",2759,10,2,20,1,"群馬県県土整備部建築課","群馬県","2026-08-24T15:00:00.000Z","2026-09-08T15:00:00.000Z",null,"active","管・空調","一般競争入札","管","前橋市川原町地内","16:00:00","2026-09-09T15:00:00.000Z","・群馬県建設工事入札参加資格者名簿に登載された者\n・健康保険法第48条、厚生年金保険法第27条、雇用保険法第7条の規定による届出の義務を履行している者（当該届出の義務がない者を除く）\n・建設業法に基づく管工事について特定建設業の許可を受けている者\n・群馬県令和8・9年度建設工事入札参加資格者名簿における管工事の総合数値が850点以上の者\n・平成28年4月1日から令和8年3月31日までに群馬県内で同種工事（管工事）の施工実績を有する者。ただし、元請として施工し、公共工事に限定。共同企業体の場合は出資比率が20%以上のもの\n・一級管工事施工管理技士の資格を有する監理技術者または主任技術者を配置できること。ただし、入札参加資格確認申請前において3ヶ月以上継続して雇用し、平成28年4月1日から令和8年3月31日までに同種工事の経験を有する者であること\n・前橋土木事務所、渋川土木事務所、中之条土木事務所、沼田土木事務所管内に建設業法に基づき設置された本店があること\n・この工事に係る設計業務受託者（株式会社勝山工務所）でなく、当該受託者と資本関係または人的関係がない者であること\n・契約を締結する能力を有し、破産者で復権を得ない者でないこと\n・群馬県財務規則第170条第2項に規定する入札の参加制限を受けていない者\n・群馬県建設工事請負業者等指名停止措置要綱第2条第2項に規定する指名停止を受けていない者\n・競争入札の適正さが阻害されるような資本関係、人的関係がないこと","【案件概要】\n群馬県県土整備部建築課が令和8年度ぐんま学園体育館改修機械設備工事の一般競争入札（事後審査方式）を実施。工事場所は前橋市川原町地内。予算規模は参考内訳書により確認が必要。フレックス工期制度を採用し、落札者が工事開始・完成期限内で柔軟に契約工期を設定できる。本工事は建築工事・電気設備工事と分離発注される関連工事として同時発注される。\n\n【業務内容","】\n- 鉄骨造・平屋建て延床面積567㎡の体育館改修に係る機械設備工事\n- 空調設備（エアコン・冷暖房システム等）の設計・施工\n- 換気設備（給排気・ダクト等）の設計・施工\n- 工事期間は令和8年9月～令和9年2月で約6ヶ月間（見積り算定上5.6ヶ月間）\n- 完成期日は令和9年2月26日\n- 室内化学物質（VOC）濃度測定を実施\n\n【応募要件】\n- 群馬県建設工事入札参加資格者名簿に登載された者\n- 健康保険法・厚生年金保険法・雇用保険法の届出義務を履行している者\n- 管工事について特定建設業の許可を受けている者\n- 群馬県令和8・9年度建設工事入札参加資格者名簿における管工事の総合数値が850点以上の者\n- 平成28年4月1日から令和8年3月31日までに群馬県内で同種工事（管工事）の施工実績を有する者（元請施工で完成引渡し完了。公共工事に限定）\n- 一級管工事施工管理技士の資格を有する監理技術者または主任技術者を配置できる者（入札参加資格確認申請前において3ヶ月以上継続雇用、同種工事の経験を有する者）\n- 前橋土木事務所、渋川土木事務所、中之条土木事務所、沼田土木事務所管内に建設業法に基づく本店があること\n- この工事に係る設計業務受託者（株式会社勝山工務所）でなく、当該受託者と資本関係または人的関係がない者\n- 契約を締結する能力を有し、破産者でない者\n- 群馬県財務規則の入札参加制限を受けておらず、指名停止措置を受けていない者\n\n【工期・期間】\n令和8年9月～令和9年2月（約6ヶ月間）。完成期日は令和9年2月26日。フレックス工期により落札者が工事開始期限日以前の任意の日を工期始期日、工事完成期限日までの任意の日を工期終期日に設定可能。技術者・資材調達に不測の期間を要する場合は受発注者間で工期延期可能。\n\n【その他特記事項】\n週休2日促進工事（発注者指定型）として、完全週休2日（土日）または月単位の週休2日のいずれかを選択。遠隔臨場を実施。中間施工検査の対象工事。電子納品対象工事。低入札価格調査制度を適用。失格基準価格を設定。同一技術者の配置予定工事の他工事落札時は入札辞退届を提出する必要がある。ぐんま学園敷地内で施工のため、学園関係者の安全に配慮し、騒音・振動を抑えた施工方法を採用すること。",true,"(redacted)","gunma-cals",[30,31,32,33,34,35],{"url":27,"name":27},{"url":27,"name":27},{"url":27,"name":27},{"url":27,"name":27},{"url":27,"name":27},{"url":27,"name":27},false,[],[],{"id":6,"name":11,"categoryId":40,"parentId":15,"parentName":15,"bidInfoUrl":15},50,[42,44],{"year":43,"count":10},2024,{"year":45,"count":46},2026,9,{"sameOrganization":48,"samePrefecture":73,"similar":93},[49,54,58,63,67],{"id":50,"title":51,"organizationName":11,"prefectureName":12,"publishedDate":52,"deadlineDate":53,"budget":15,"status":16},3628785,"令和8年度ぐんま学園寮舎(赤城寮)個室化工事","2026-08-19T15:00:00.000Z","2026-08-27T15:00:00.000Z",{"id":55,"title":56,"organizationName":11,"prefectureName":12,"publishedDate":57,"deadlineDate":53,"budget":15,"status":16},3585746,"令和8年度ぐんま学園体育館改修電気設備工事","2026-08-18T15:00:00.000Z",{"id":59,"title":60,"organizationName":11,"prefectureName":12,"publishedDate":61,"deadlineDate":62,"budget":15,"status":16},3314011,"令和8年度しろがね学園一般棟浴室複室化改修工事","2026-08-05T15:00:00.000Z","2026-08-26T15:00:00.000Z",{"id":64,"title":65,"organizationName":11,"prefectureName":12,"publishedDate":61,"deadlineDate":66,"budget":15,"status":16},3314010,"令和8年度ALSOKぐんま総合スポーツセンターテニスコート夜間照明LED化工事","2026-09-02T15:00:00.000Z",{"id":68,"title":69,"organizationName":11,"prefectureName":12,"publishedDate":70,"deadlineDate":71,"budget":15,"status":72},3057738,"令和8年度地特事業県立森林公園赤城ふれあいの森あかぎ木の家改修工事","2026-07-30T15:00:00.000Z","2026-08-23T15:00:00.000Z","closed",[74,80,83,87,90],{"id":75,"title":76,"organizationName":77,"prefectureName":12,"publishedDate":13,"deadlineDate":78,"budget":79,"status":16},3887728,"補助公共 社会資本総合整備(防災・安全・一般) 小根山橋耐震補強設計業務 一般県道 小根山森林公園線 小根山橋 安中市松井田町横川 地内","群馬県県土整備部安中土木事務所","2026-10-15T15:00:00.000Z",40000000,{"id":81,"title":82,"organizationName":15,"prefectureName":12,"publishedDate":13,"deadlineDate":15,"budget":15,"status":16},3887727,"県央第二水道 1-2系PAC注入配管更新外工事",{"id":84,"title":85,"organizationName":86,"prefectureName":12,"publishedDate":13,"deadlineDate":15,"budget":15,"status":16},3887726,"単独公共 単独交通安全対策事業(交安)側溝整備工事 主要地方道 前橋長瀞線外 藤岡市鬼石外地内","群馬県県土整備部藤岡土木事務所",{"id":88,"title":89,"organizationName":86,"prefectureName":12,"publishedDate":13,"deadlineDate":15,"budget":15,"status":16},3887725,"単独公共 地域公共事業調整費路側復旧工事 主要地方道 高崎神流秩父線 多野郡 神流町大字万場外地内",{"id":91,"title":92,"organizationName":86,"prefectureName":12,"publishedDate":13,"deadlineDate":15,"budget":15,"status":16},3887724,"補助公共 社会資本総合整備(防災・安全)(国道防災)落石対策 重力式擁壁設置工事 国道 299号 多野郡 神流町大字神ヶ原地内",[94,99,102,105,108],{"id":95,"title":96,"organizationName":97,"prefectureName":98,"publishedDate":13,"deadlineDate":15,"budget":15,"status":16},3887870,"令和8年度 配水管布設替工事(その2)","宮代町 企画財政課 企画財政室","埼玉県",{"id":100,"title":101,"organizationName":97,"prefectureName":98,"publishedDate":13,"deadlineDate":15,"budget":15,"status":16},3887869,"令和8年度 宮代第5号汚水幹線・枝線布設替工事",{"id":103,"title":104,"organizationName":97,"prefectureName":98,"publishedDate":13,"deadlineDate":15,"budget":15,"status":16},3887868,"令和8年度 舗装復旧工事(その3)",{"id":106,"title":107,"organizationName":97,"prefectureName":98,"publishedDate":13,"deadlineDate":15,"budget":15,"status":16},3887867,"令和8年度 舗装復旧工事(その4)",{"id":109,"title":110,"organizationName":97,"prefectureName":98,"publishedDate":13,"deadlineDate":15,"budget":15,"status":16},3887865,"令和8年度 華蔵院橋外3橋修繕工事",[112,118,124,130],{"title":113,"link":114,"date":115,"thumb":116,"cat":117},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":119,"link":120,"date":121,"thumb":122,"cat":123},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":125,"link":126,"date":127,"thumb":128,"cat":129},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":131,"link":132,"date":133,"thumb":134,"cat":135},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]