[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-3859937":3,"bid-history-3859937":37,"bid-related-3859937":41,"union-latest":112},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":11,"bidCategoryName":17,"bidTypeName":18,"categoryText":19,"regionText":20,"deadlineTime":21,"openingDate":22,"qualificationText":23,"aiSummary":24,"aiSummaryGated":25,"aiSummaryTruncated":26,"sourceUrl":27,"dataSourceCode":28,"budgetTaxIncluded":26,"documentUrls":29,"businessExperience":26,"localOffice":26,"securityRequirement":31,"qualifications":32,"certifications":33,"organization":34},3859937,"【電子契約】【総合評価】08県単支援道改第08-03-994-0-001号 仮設道路撤去工事",2215,8,2,14,1,"茨城県 土木部 常陸太田工事事務所","茨城県","2026-08-23T15:00:00.000Z","2026-09-14T15:00:00.000Z",39149000,"active","土木","一般競争入札","土木一式工事","市道0139号線 常陸太田市高貫町地内","16:00:00","2026-09-15T15:00:00.000Z","・常陸太田工事事務所管内又は高萩工事事務所管内に建設業法に基づく主たる営業所（本店）があること\n・令和7・8年度茨城県建設工事入札参加資格者名簿に登載された土木一式工事のA等級格付けを有すること\n・平成28年4月1日から令和8年3月31日の期間に竣工した同種工事又は類似工事を元請けとして施工した実績があること（民間工事は除く）\n・同種工事とは3,000m³以上の掘削工（または切土工）を施工した工事\n・類似工事とは2,000m³以上の掘削工（または切土工）を施工した工事\n・1級土木施工管理技士の資格を有する等、土木一式工事について建設業法第26条に規定する主任技術者又は監理技術者になり得る者であること\n・配置予定技術者について、直接的かつ恒常的な雇用関係があり、競争参加資格確認申請のあった日以前に3月以上の雇用関係がある者であること\n・土木一式工事について特定建設業の許可を受けていること\n・契約締結日において、契約締結日から1年7月以内の審査基準日の経営事項審査を受けている者であること\n・対象工事の設計業務等の受託者でないこと、また受託者と資本又は人事面において関連がない者であること","【案件概要】\n茨城県常陸太田工事事務所が、市道0139号線常陸太田市高貫町地内における仮設道路撤去工事の一般競争入札を実施する。本工事は総合評価方式（特別簡易型Ⅱ型）を適用し、企業の新規雇用計画に関する技術資料を評価対象とする。予定価格は39,149,000円（消費税及び地方消費税含む）。工期は令和9年3月15日までで、余裕期間制度を適用した工事である。\n\n","【業務内容】\n- 仮設道路撤去工事（L=122m）\n- 掘削工（V=3,000m³）\n- 盛土工（V=170m³）\n- 土砂運搬工（V=2,820m³）\n- 防護柵撤去（L=169m）\n- 敷鉄板撤去（A=2,204m²）\n\n【応募要件】\n- 常陸太田工事事務所管内又は高萩工事事務所管内に建設業法に基づく主たる営業所（本店）があること\n- 令和7・8年度茨城県建設工事入札参加資格者名簿に登載された土木一式工事のA等級格付けを有すること\n- 平成28年4月1日から令和8年3月31日の期間に竣工した同種工事又は類似工事を元請けとして施工した実績があること（民間工事は除く。共同企業体の構成員としての実績は出資比率20%以上のもののみ）\n- 同種工事：3,000m³以上の掘削工（または切土工）を施工した工事\n- 類似工事：2,000m³以上の掘削工（または切土工）を施工した工事\n- 1級土木施工管理技士の資格を有する等、土木一式工事について建設業法第26条に規定する主任技術者又は監理技術者になり得る者であること\n- 配置予定技術者について、直接的かつ恒常的な雇用関係があり、競争参加資格確認申請のあった日以前に3月以上の雇用関係がある者であること\n- 土木一式工事について特定建設業の許可を受けていること\n- 契約締結日において、契約締結日から1年7月以内の審査基準日の経営事項審査を受けている者であること\n- 対象工事の設計業務等の受託者でないこと、また受託者と資本又は人事面において関連がない者であること\n\n【工期・期間】\n工期：令和9年3月15日まで\n余裕期間制度が適用されており、落札者は余裕期間内で工期の始期日を任意に設定できる（休日を除く）。ただし低入札価格調査等により余裕期間内に契約締結とならなかった場合には、契約締結日の翌日を工期の始期日とする。",true,"(redacted)","koukai-ibaraki",[30],{"url":27,"name":27},false,[],[],{"id":6,"name":11,"categoryId":35,"parentId":36,"parentName":36,"bidInfoUrl":36},50,null,[38],{"year":39,"count":40},2026,33,{"sameOrganization":42,"samePrefecture":64,"similar":86},[43,47,51,55,59],{"id":44,"title":45,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":46,"status":16},3863086,"【電子契約】【総合評価】【とりおり2】08県単道修第08-53-704-0-002号 07県単橋修第07-53-784-0-003号 合併 道路維持修繕工事(下半期)",20064000,{"id":48,"title":49,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":50,"status":16},3863085,"【電子契約】【総合評価】【とりおり1】08県単道修第08-53-702-0-002号 07県単橋修第07-53-782-0-002号 合併道路維持修繕工事(下半期)",20526000,{"id":52,"title":53,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":36,"budget":54,"status":16},3859943,"【電子契約】08県単支援道改第08-03-993-0-053号 (仮称)第3号橋架設計画検討業務委託",5786000,{"id":56,"title":57,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":58,"status":16},3859936,"【電子契約】【総合評価】08国補橋修 第08-04-468-0-001号 里美大橋修繕工事",101761000,{"id":60,"title":61,"organizationName":11,"prefectureName":12,"publishedDate":62,"deadlineDate":36,"budget":63,"status":16},3555901,"【電子契約】08県単河防第08-53-451-0-002号 08県単河修第08-53-504-0-002号 07県単河防第07-53-451-0-006号合併 堆積土砂撤去工事","2026-08-16T15:00:00.000Z",23331000,[65,70,73,77,82],{"id":66,"title":67,"organizationName":68,"prefectureName":12,"publishedDate":69,"deadlineDate":36,"budget":36,"status":16},3892012,"硬式野球練習球購入","茨城県 教育庁(県立学校) 土浦工業高等学校","2026-08-24T15:00:00.000Z",{"id":71,"title":72,"organizationName":68,"prefectureName":12,"publishedDate":69,"deadlineDate":36,"budget":36,"status":16},3892011,"事務用品等購入",{"id":74,"title":75,"organizationName":76,"prefectureName":12,"publishedDate":69,"deadlineDate":36,"budget":36,"status":16},3892010,"場内維持管理用品(Vベルト他)県南","茨城県 企業局 県南水道事務所",{"id":78,"title":79,"organizationName":80,"prefectureName":12,"publishedDate":69,"deadlineDate":81,"budget":36,"status":16},3892009,"令和8年度漁業調査指導船「いばらき丸」点検整備工事(水産試験場)","茨城県 農林水産部 水産試験場","2026-09-13T15:00:00.000Z",{"id":83,"title":84,"organizationName":85,"prefectureName":12,"publishedDate":69,"deadlineDate":36,"budget":36,"status":16},3892008,"行方合同庁舎 1階ドアクローザー補修修繕","茨城県 総務部 行方県税事務所",[87,92,98,103,108],{"id":88,"title":89,"organizationName":90,"prefectureName":12,"publishedDate":69,"deadlineDate":22,"budget":91,"status":16},3886579,"【総合評価・週休2日・快適トイレ・建設キャリアアップ・電子契約】08国補橋修第08-04-490-0-001号 滝川橋修繕工事","茨城県 土木部 常陸大宮土木事務所大子工務所",120054000,{"id":93,"title":94,"organizationName":95,"prefectureName":12,"publishedDate":69,"deadlineDate":96,"budget":97,"status":16},3883343,"【総合評価】08県単橋修 第08-58-650-0-002号 外合併 長豊橋耐震・修繕工事(その2)","茨城県 土木部 竜ヶ崎工事事務所","2026-09-07T15:00:00.000Z",73898000,{"id":99,"title":100,"organizationName":101,"prefectureName":12,"publishedDate":69,"deadlineDate":36,"budget":102,"status":16},3883342,"08県単急傾斜 第08-05-587-0-001号 07県単急傾斜 第07-05-587-0-002号 合併 急傾斜地崩壊対策工事 ※総合評価","茨城県 土木部 水戸土木事務所",30635000,{"id":104,"title":105,"organizationName":106,"prefectureName":107,"publishedDate":69,"deadlineDate":22,"budget":36,"status":16},3883341,"【総合評価】８債単造第１号 長崎北陽台高校運動場全面改修工事","土木部 営繕課","長崎県",{"id":109,"title":110,"organizationName":111,"prefectureName":107,"publishedDate":69,"deadlineDate":22,"budget":36,"status":16},3883340,"【総合評価】８総防地改第３－３号 一般県道富川渓線道路改良工事（８工区）","県央振興局",[113,119,125,131],{"title":114,"link":115,"date":116,"thumb":117,"cat":118},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":120,"link":121,"date":122,"thumb":123,"cat":124},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":126,"link":127,"date":128,"thumb":129,"cat":130},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":132,"link":133,"date":134,"thumb":135,"cat":136},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]