[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-3859925":3,"bid-history-3859925":31,"bid-related-3859925":34,"union-latest":97},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":14,"status":15,"department":11,"bidCategoryName":16,"bidTypeName":17,"categoryText":18,"regionText":19,"deadlineTime":14,"openingDate":14,"qualificationText":20,"aiSummary":21,"aiSummaryGated":22,"aiSummaryTruncated":23,"sourceUrl":24,"dataSourceCode":25,"budgetTaxIncluded":14,"documentUrls":26,"businessExperience":23,"localOffice":23,"securityRequirement":27,"qualifications":28,"certifications":29,"organization":30},3859925,"８債県北河大第１－２号 早岐川河川改修工事（３工区）",2798,42,2,14,1,"県北振興局","長崎県","2026-08-23T15:00:00.000Z",null,"active","土木","一般競争入札","河川改修工事（土木一式工事）、橋梁下部工、護岸工、道路工、迂回路工、旧橋撤去工","佐世保市 早岐１丁目、２丁目","・土木工事業に係る特定建設業の許可を有すること（代表構成員及びその他構成員ともに）\n・共同企業体を構成すること（2者、出資比率最小限度30%）\n・代表構成員が県北振興局建設部管内に主たる営業所を有し土木一式工事総合数値1000点以上かつ主観点数100点以上Aランク、又は長崎県内に主たる営業所を有し総合数値1200点以上かつ主観点数100点以上Aランク\n・代表構成員の土木一式工事年間平均完成工事高が2億円以上\n・その他構成員が県北振興局建設部管内に主たる営業所を有し土木一式工事格付等級Aランク、又は長崎県内に主たる営業所を有する者\n・主任技術者（監理技術者）として1級土木施工管理技士、1級建設機械施工管理技士、1級建設機械施工技士、技術士（建設部門ほか）のいずれかの資格を有する者を専任配置できること\n・監理技術者資格者証及び監理技術者講習修了証を有し、講習修了から5年以内\n・配置予定技術者と直接的かつ恒常的な雇用関係（3か月以上連続）を有すること\n・令和8年度長崎県建設工事入札参加格付要綱の入札参加資格名簿に登載されていること\n・経営事項審査の有効期間が満了していないこと\n・過去3か月間に長崎県発注工事で真にやむを得ない理由以外での技術者途中交代をしていないこと\n・過去3か月間に長崎県内の公共工事（長崎県発注工事除く）で真にやむを得ない理由以外での技術者途中交代をしていないこと","【案件概要】\n長崎県県北振興局が早岐川河川改修工事（３工区）の制限付一般競争入札を実施する。工事場所は佐世保市早岐１丁目、２丁目で、工事延長138m、護岸工380㎡、橋梁下部工2基、旧橋撤去工1式、道路工138m、迂回路工119mを施工する河川改修工事である。総合評価落札方式（技術提案型）を適用した入札であり、実工期は1180日間で令和9年1月4日までに着手","することが要件となる。本工事は余裕期間制度を活用した任意着手方式を採用しており、受注者が工事の始期を任意に設定可能である。\n\n【業務内容】\n- 早岐川の河川改修工事（工事延長138m）\n- 護岸工の施工（380㎡）\n- 橋梁下部工（橋台又は橋脚）の新設工事（2基）\n- 既存橋梁の撤去工\n- 道路工の施工（138m）\n- 迂回路工の施工（119m）\n- 分別解体等及び特定建設資材廃棄物の再資源化\n- i-Construction対応（施工者希望型ICT活用工事）\n- 情報共有システムの利用\n- 快適トイレの設置（設置費用は別途計上なし）\n- 週休2日モデル工事への対応\n\n【応募要件】\n- 土木工事業に係る特定建設業の許可を有すること（代表構成員及びその他構成員）\n- 共同企業体は2者構成、出資比率の最小限度は30%\n- 代表構成員は県北振興局建設部管内に主たる営業所を有し土木一式工事総合数値1000点以上かつ主観点数100点以上Aランク、又は長崎県内に主たる営業所を有し総合数値1200点以上かつ主観点数100点以上Aランク\n- 代表構成員は土木一式工事年間平均完成工事高が2億円以上\n- 主任技術者（又は監理技術者）として、1級土木施工管理技士、1級建設機械施工管理技士、1級建設機械施工技士、技術士（建設部門など）のいずれかの資格者を専任配置できること\n- 監理技術者資格者証及び監理技術者講習修了証を有し、講習修了から5年以内であること\n- 配置予定技術者との直接的かつ恒常的な雇用関係（3か月以上連続）があること\n- 令和8年度長崎県建設工事入札参加格付要綱に基づく入札参加資格名簿に登載されていること\n- 経営事項審査の有効期間が満了していないこと\n- 過去3か月間に長崎県発注工事で真にやむを得ない理由以外での技術者途中交代をしていないこと\n\n【工期・期間】\n余裕期間：契約締結日から工事の始期の前日まで（受注者が任意に設定）\n実工期：工事の始期から1180日間（ただし令和9年1月4日までに工事を開始すること）\n\n【総合評価項目】\n技術提案：施工上配慮すべき事項（躯体コンクリートの品質向上対策及び周辺地域への騒音振動粉じん対策）\n配置予定技術者の能力：施工実績、工事成績評定、表彰実績、資格\n企業の施工能力：施工実績、工事成績評定、施工実績件数、優秀工事表彰、年間受注高、CPDAS受講、基幹技能者配置、拠点整備、管内施工実績、社会貢献活動、特定工事受注実績、従業員数、下請契約適切性",true,"(redacted)","nagasaki-doboku-koukoku",[],false,[],[],{"id":6,"name":11,"categoryId":14,"parentId":14,"parentName":14,"bidInfoUrl":14},[32],{"year":33,"count":9},2026,{"sameOrganization":35,"samePrefecture":55,"similar":78},[36,41,45,49,52],{"id":37,"title":38,"organizationName":11,"prefectureName":12,"publishedDate":39,"deadlineDate":40,"budget":14,"status":15},3707715,"【総合評価】８債県北漁生第１２－５号 小値賀地区水産生産基盤整備工事（沖防波堤（Ａ）（改良）２工区）","2026-08-20T15:00:00.000Z","2026-09-13T15:00:00.000Z",{"id":42,"title":43,"organizationName":11,"prefectureName":12,"publishedDate":39,"deadlineDate":44,"budget":14,"status":15},3707714,"【総合評価】８債県北漁生第１２－４号 小値賀地区水産生産基盤整備工事（沖防波堤（Ａ）（改良）１工区）","2026-09-08T15:00:00.000Z",{"id":46,"title":47,"organizationName":11,"prefectureName":12,"publishedDate":48,"deadlineDate":44,"budget":14,"status":15},3571577,"【総合評価】７補繰債県北漁生第２３－１号 舘浦地区水産生産基盤整備工事（可動橋撤去工）","2026-08-17T15:00:00.000Z",{"id":50,"title":51,"organizationName":11,"prefectureName":12,"publishedDate":48,"deadlineDate":44,"budget":14,"status":15},3571574,"【総合評価】８債県北漁生第２３－５号 舘浦地区水産生産基盤整備工事（Ｆ物揚場（改良））",{"id":53,"title":54,"organizationName":11,"prefectureName":12,"publishedDate":48,"deadlineDate":44,"budget":14,"status":15},3571573,"【総合評価】８債県北港港改第１２１－３号 早岐港港整備交付金工事",[56,61,66,70,73],{"id":57,"title":58,"organizationName":12,"prefectureName":12,"publishedDate":59,"deadlineDate":60,"budget":14,"status":15},3888863,"8上河ダ第2－1号 宮ノ川ダム他メンテナンス工事（取水放流設備点検業務委託）","2026-08-24T15:00:00.000Z","2026-09-07T15:00:00.000Z",{"id":62,"title":63,"organizationName":64,"prefectureName":12,"publishedDate":59,"deadlineDate":65,"budget":14,"status":15},3883341,"【総合評価】８債単造第１号 長崎北陽台高校運動場全面改修工事","土木部 営繕課","2026-09-15T15:00:00.000Z",{"id":67,"title":68,"organizationName":69,"prefectureName":12,"publishedDate":59,"deadlineDate":65,"budget":14,"status":15},3883340,"【総合評価】８総防地改第３－３号 一般県道富川渓線道路改良工事（８工区）","県央振興局",{"id":71,"title":72,"organizationName":12,"prefectureName":12,"publishedDate":59,"deadlineDate":60,"budget":14,"status":15},3882903,"令和８年度森林経営管理制度市町支援業務",{"id":74,"title":75,"organizationName":76,"prefectureName":12,"publishedDate":59,"deadlineDate":77,"budget":14,"status":15},3874543,"軽自動車税申告書","税務課","2026-09-02T15:00:00.000Z",[79,84,88,91,94],{"id":80,"title":81,"organizationName":82,"prefectureName":83,"publishedDate":59,"deadlineDate":14,"budget":14,"status":15},3887858,"大谷本郷さいたま線(三橋工区)物件調査・積算業務(北用-R8-2)","さいたま市 建設局北部建設事務所 用地課","埼玉県",{"id":85,"title":86,"organizationName":87,"prefectureName":83,"publishedDate":59,"deadlineDate":65,"budget":14,"status":15},3887847,"総地加)緊急浚渫推進工事(清水川工区)603","埼玉県 県土整備部 熊谷県土整備事務所",{"id":89,"title":90,"organizationName":87,"prefectureName":83,"publishedDate":59,"deadlineDate":65,"budget":14,"status":15},3887846,"総地加)緊急浚渫推進工事(福川工区)601",{"id":92,"title":93,"organizationName":87,"prefectureName":83,"publishedDate":59,"deadlineDate":65,"budget":14,"status":15},3887845,"総地加)緊急浚渫推進工事(小山川工区)651",{"id":95,"title":96,"organizationName":87,"prefectureName":83,"publishedDate":59,"deadlineDate":65,"budget":14,"status":15},3887844,"総地加)緊急浚渫推進工事(唐沢川工区)602",[98,104,110,116],{"title":99,"link":100,"date":101,"thumb":102,"cat":103},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":105,"link":106,"date":107,"thumb":108,"cat":109},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":111,"link":112,"date":113,"thumb":114,"cat":115},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":117,"link":118,"date":119,"thumb":120,"cat":121},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]