[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-3716877":3,"bid-history-3716877":37,"bid-related-3716877":50,"union-latest":119},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":17,"bidCategoryName":18,"bidTypeName":19,"categoryText":20,"regionText":21,"deadlineTime":22,"openingDate":23,"qualificationText":24,"aiSummary":25,"aiSummaryGated":26,"aiSummaryTruncated":27,"sourceUrl":28,"dataSourceCode":29,"budgetTaxIncluded":15,"documentUrls":30,"businessExperience":27,"localOffice":27,"securityRequirement":33,"qualifications":34,"certifications":35,"organization":36},3716877,"日野町下水道マンホール蓋取替工事",2970,42,2,26,1,"佐世保市","長崎県","2026-08-20T15:00:00.000Z","2026-09-01T15:00:00.000Z",null,"active","水道局 財務課","下水道","一般競争入札","上下水道土木","佐世保市日野町","17:00:00","2026-09-02T15:00:00.000Z","・令和8年度佐世保市建設工事入札参加資格者名簿に登録され「上下水道土木工事B」に格付けされていること\n・土木工事業に係る建設業の許可を有すること\n・佐世保市内に本店を有すること\n・佐世保市の市税・国民健康保険税、消費税及び地方消費税の滞納がないこと\n・入札参加資格申請提出期限日及び入札期日以前6箇月以内に不渡手形及び不渡小切手を出していないこと\n・本公告日以前3箇月以内に佐世保市から上下水道土木工事における工事成績評定点65点未満の通知を受けていないこと\n・会社更生法又は民事再生法に基づく更生手続き開始の申立てがなされていないこと\n・佐世保市電子入札システムにおいてICカードを使用し利用者登録を行っていること","【案件概要】\n佐世保市水道局が実施する一般競争入札（事後審査型）案件。日野町地内の下水道マンホール蓋取替工事で、マンホール蓋（φ600・T-25）40箇所の交換を行う。本工事は「佐世保市週休2日モデル工事の試行要領」に基づく週休2日試行工事であり、猛暑日14日を工期に見込んでいる。契約締結日から令和8年12月22日までの工期で実施される。予定価格及び最低制限","価格は開札会場においてランダム化により決定され、最低制限基本価格（消費税及び地方消費税を除く）は工事価格の92％で設定される。\n\n【業務内容】\n- 下水道マンホール蓋取替工事\n- マンホール蓋（φ600・T-25）40箇所の交換\n\n【応募要件】\n- 令和8年度佐世保市建設工事入札参加資格者名簿に登録され「上下水道土木工事B」に格付けされていること\n- 土木工事業に係る建設業の許可を有すること\n- 佐世保市内に本店を有すること\n- 佐世保市の市税・国民健康保険税、消費税及び地方消費税の滞納がないこと\n- 入札参加資格申請提出期限日及び入札期日以前6箇月以内に不渡手形及び不渡小切手を出していないこと\n- 本公告日以前3箇月以内に佐世保市から上下水道土木工事における工事成績評定点65点未満の通知を受けていないこと\n- 会社更生法又は民事再生法の更生手続き開始の申立てがなされていないこと\n- 佐世保市電子入札システムにおいてICカードを使用し利用者登録を行っていること\n- 直近に佐世保市に提出した経営規模等評価結果通知書・総合評定値通知書の土木一式工事の平均完成工事高が0でないこと\n- 本公告日が属する月を含み以前2か月以内に佐世保市が発注した災害復旧工事を除く上下水道土木工事を制限付き一般競争入札により落札していないこと（共同企業体の構成員を含む）\n- 佐世保市が発注した当初契約金額が2億円以上の上下水道土木工事を受注した場合、入札参加資格申請時において当該工事が完成していないこと（契約日以後6か月間を上限）\n- 系列関係がある会社同士での入札参加は不可\n\n【工期・期間】\n契約締結日から令和8年12月22日まで（猛暑日14日を含む）\n入札参加申請期間：令和8年8月21日（金）から8月27日（木）正午まで\n入札期間：令和8年8月28日（金）午後1時から9月2日（水）午後5時まで\n開札日時：令和8年9月3日（木）午前10時40分",true,"(redacted)","koukai-sasebo",[31,32],{"url":28,"name":28},{"url":28,"name":28},false,[],[],{"id":6,"name":11,"categoryId":15,"parentId":15,"parentName":15,"bidInfoUrl":15},[38,41,44,47],{"year":39,"count":40},2023,461,{"year":42,"count":43},2024,506,{"year":45,"count":46},2025,442,{"year":48,"count":49},2026,285,{"sameOrganization":51,"samePrefecture":68,"similar":93},[52,56,59,62,65],{"id":53,"title":54,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":55,"budget":15,"status":16},3716882,"針尾漁港(鯛ノ浦地区)防波堤磁気探査及び潜水探査業務委託","2026-09-08T15:00:00.000Z",{"id":57,"title":58,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":55,"budget":15,"status":16},3716881,"高島漁港東防波堤機能強化設計業務委託",{"id":60,"title":61,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":55,"budget":15,"status":16},3716879,"佐世保相浦循環線外4線道路照明灯更新工事",{"id":63,"title":64,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":55,"budget":15,"status":16},3716878,"花高団地高架橋橋梁補修工事",{"id":66,"title":67,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":55,"budget":15,"status":16},3716876,"権常寺川排水区2号暗渠改良工事",[69,75,79,83,87],{"id":70,"title":71,"organizationName":72,"prefectureName":12,"publishedDate":73,"deadlineDate":74,"budget":15,"status":16},3883341,"【総合評価】８債単造第１号 長崎北陽台高校運動場全面改修工事","土木部 営繕課","2026-08-24T15:00:00.000Z","2026-09-15T15:00:00.000Z",{"id":76,"title":77,"organizationName":78,"prefectureName":12,"publishedDate":73,"deadlineDate":74,"budget":15,"status":16},3883340,"【総合評価】８総防地改第３－３号 一般県道富川渓線道路改良工事（８工区）","県央振興局",{"id":80,"title":81,"organizationName":12,"prefectureName":12,"publishedDate":73,"deadlineDate":82,"budget":15,"status":16},3882903,"令和８年度森林経営管理制度市町支援業務","2026-09-07T15:00:00.000Z",{"id":84,"title":85,"organizationName":86,"prefectureName":12,"publishedDate":73,"deadlineDate":23,"budget":15,"status":16},3874543,"軽自動車税申告書","税務課",{"id":88,"title":89,"organizationName":90,"prefectureName":12,"publishedDate":91,"deadlineDate":92,"budget":15,"status":16},3882647,"令和8年度平戸瀬戸航路外2件航行船舶動静情報収集整理","国土交通省","2026-08-23T15:00:00.000Z","2026-09-29T15:00:00.000Z",[94,99,104,111,116],{"id":95,"title":96,"organizationName":97,"prefectureName":98,"publishedDate":73,"deadlineDate":15,"budget":15,"status":16},3885247,"R8マンホールポンプ非常通報装置(神明町二丁目ほか)E工区更新工事","東松山市 政策財政部 契約検査課","埼玉県",{"id":100,"title":101,"organizationName":15,"prefectureName":102,"publishedDate":73,"deadlineDate":103,"budget":15,"status":16},3874541,"寝屋川流域下水道 柏原八尾幹線 マンホール改良工事(R8‐1)","大阪府","2026-09-09T15:00:00.000Z",{"id":105,"title":106,"organizationName":107,"prefectureName":108,"publishedDate":91,"deadlineDate":109,"budget":110,"status":16},3882563,"マンホール蓋修繕・改築計画策定業務委託(明日香村内)","奈良県明日香村","奈良県","2026-09-06T15:00:00.000Z",6237000,{"id":112,"title":113,"organizationName":114,"prefectureName":115,"publishedDate":91,"deadlineDate":15,"budget":15,"status":16},3867153,"社会資本総合整備(防災・安全交付金事業)(下水)マンホール蓋更新工事 分割6号 利根川上流流域下水道(県央処理区) 玉村渋川1号幹線 渋川市半田外","群馬県県土整備部下水道総合事務所","群馬県",{"id":117,"title":118,"organizationName":114,"prefectureName":115,"publishedDate":91,"deadlineDate":15,"budget":15,"status":16},3867152,"社会資本総合整備(防災・安全交付金事業)(下水)マンホール蓋更新工事 利根川上流流域下水道(奥利根処理区) 沼田水上幹線 利根郡みなかみ町上牧外",[120,126,132,138],{"title":121,"link":122,"date":123,"thumb":124,"cat":125},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":127,"link":128,"date":129,"thumb":130,"cat":131},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":133,"link":134,"date":135,"thumb":136,"cat":137},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":139,"link":140,"date":141,"thumb":142,"cat":143},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]