[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-3716876":3,"bid-history-3716876":37,"bid-related-3716876":50,"union-latest":118},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":17,"bidCategoryName":18,"bidTypeName":19,"categoryText":20,"regionText":21,"deadlineTime":22,"openingDate":23,"qualificationText":24,"aiSummary":25,"aiSummaryGated":26,"aiSummaryTruncated":27,"sourceUrl":28,"dataSourceCode":29,"budgetTaxIncluded":15,"documentUrls":30,"businessExperience":33,"localOffice":27,"securityRequirement":33,"qualifications":34,"certifications":35,"organization":36},3716876,"権常寺川排水区2号暗渠改良工事",2970,42,2,14,1,"佐世保市","長崎県","2026-08-20T15:00:00.000Z","2026-09-08T15:00:00.000Z",null,"active","財務部 契約課","土木","一般競争入札","とび・土工・コンクリート工事","佐世保市権常寺町","17:00:00","2026-09-09T15:00:00.000Z","・令和8年度佐世保市建設工事入札参加資格者名簿の「とび・土工・コンクリート工事」に登録されていること\n・とび・土工・コンクリート工事に係る建設業の許可を有すること\n・佐世保市内に本店を有すること\n・佐世保市の市税・国民健康保険税、消費税及び地方消費税の滞納がないこと\n・入札参加資格申請提出期限日及び入札期日以前6か月以内に、取引銀行において不渡手形及び不渡小切手を出していないこと\n・本公告日以前3か月以内に佐世保市からとび・土工・コンクリート工事における工事成績評定点65点未満の通知を受けていないこと\n・会社更生法又は民事再生法の手続き開始申立てがなされていないこと\n・佐世保市電子入札システムにおいてICカードを使用し、利用者登録を行っていること\n・直近に佐世保市に提出した経営規模等評価結果通知書・総合評定値通知書のとび・土工・コンクリート工事の平均完成工事高が350万円以上であること\n・本公告日が属する月を含み、以前2か月以内に佐世保市又は佐世保市水道局が発注したとび・土工・コンクリート工事を制限付き一般競争入札により落札していないこと（災害復旧工事及び主観点制限対象工事を除く）\n・佐世保市等が発注した当初契約金額が2億円以上のとび・土工・コンクリート工事を受注した場合、入札参加資格申請時において当該工事が完成していないものでないこと\n・系列関係がある会社同士での入札参加でないこと","【案件概要】\n佐世保市が権常寺川排水区2号暗渠改良工事の一般競争入札（事後審査型）を実施。佐世保市権常寺町における排水区改良工事であり、工事延長L=202.0mの暗渠改良が対象。工期は令和9年3月29日までで、週休2日試行工事として実施される。猛暑日14日分を見込んでいる。\n\n【業務内容】\n- 断面修復工 N=1構造物（V=0.85㎥）\n- ひび割れ補修工 ","N=1構造物（L=23.7ｍ）\n- 表面含浸工 A=530㎡\n\n【応募要件】\n- 令和8年度佐世保市建設工事入札参加資格者名簿の「とび・土工・コンクリート工事」に登録されていること\n- とび・土工・コンクリート工事に係る建設業の許可を有すること\n- 佐世保市内に本店を有すること\n- 佐世保市の市税・国民健康保険税、消費税及び地方消費税の滞納がないこと\n- 入札参加資格申請提出期限日及び入札期日以前6か月以内に、取引銀行において不渡手形及び不渡小切手を出していないこと\n- 本公告日以前3か月以内に佐世保市からとび・土工・コンクリート工事における工事成績評定点65点未満の通知を受けていないこと\n- 会社更生法又は民事再生法の手続き開始申立てがなされていないこと（再度の資格審査申請を受理された者を除く）\n- 佐世保市電子入札システムにおいてICカードを使用し、利用者登録を行っていること\n- 直近に佐世保市に提出した経営規模等評価結果通知書・総合評定値通知書のとび・土工・コンクリート工事の平均完成工事高が350万円以上であること\n- 本公告日が属する月を含み、以前2か月以内に佐世保市又は佐世保市水道局が発注したとび・土工・コンクリート工事を制限付き一般競争入札により落札していないこと（災害復旧工事及び主観点制限対象工事を除く）\n- 佐世保市等が発注した当初契約金額が2億円以上のとび・土工・コンクリート工事を受注した場合、入札参加資格申請時において当該工事が完成していないものでないこと（6か月以内は除く）\n- 系列関係がある会社同士での入札参加でないこと\n\n【工期・期間】\n契約締結日から令和9年3月29日まで。入札参加申請期間は令和8年8月21日（金）から令和8年9月3日（木）午後0時まで。入札期間は令和8年9月4日（金）午後1時から令和8年9月9日（水）午後5時まで。開札日は令和8年9月10日（木）午前9時50分。",true,"(redacted)","koukai-sasebo",[31,32],{"url":28,"name":28},{"url":28,"name":28},false,[],[],{"id":6,"name":11,"categoryId":15,"parentId":15,"parentName":15,"bidInfoUrl":15},[38,41,44,47],{"year":39,"count":40},2023,461,{"year":42,"count":43},2024,506,{"year":45,"count":46},2025,442,{"year":48,"count":49},2026,285,{"sameOrganization":51,"samePrefecture":68,"similar":91},[52,55,58,61,64],{"id":53,"title":54,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},3716882,"針尾漁港(鯛ノ浦地区)防波堤磁気探査及び潜水探査業務委託",{"id":56,"title":57,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},3716881,"高島漁港東防波堤機能強化設計業務委託",{"id":59,"title":60,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},3716879,"佐世保相浦循環線外4線道路照明灯更新工事",{"id":62,"title":63,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},3716878,"花高団地高架橋橋梁補修工事",{"id":65,"title":66,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":67,"budget":15,"status":16},3716877,"日野町下水道マンホール蓋取替工事","2026-09-01T15:00:00.000Z",[69,74,79,83,86],{"id":70,"title":71,"organizationName":12,"prefectureName":12,"publishedDate":72,"deadlineDate":73,"budget":15,"status":16},3888863,"8上河ダ第2－1号 宮ノ川ダム他メンテナンス工事（取水放流設備点検業務委託）","2026-08-24T15:00:00.000Z","2026-09-07T15:00:00.000Z",{"id":75,"title":76,"organizationName":77,"prefectureName":12,"publishedDate":72,"deadlineDate":78,"budget":15,"status":16},3883341,"【総合評価】８債単造第１号 長崎北陽台高校運動場全面改修工事","土木部 営繕課","2026-09-15T15:00:00.000Z",{"id":80,"title":81,"organizationName":82,"prefectureName":12,"publishedDate":72,"deadlineDate":78,"budget":15,"status":16},3883340,"【総合評価】８総防地改第３－３号 一般県道富川渓線道路改良工事（８工区）","県央振興局",{"id":84,"title":85,"organizationName":12,"prefectureName":12,"publishedDate":72,"deadlineDate":73,"budget":15,"status":16},3882903,"令和８年度森林経営管理制度市町支援業務",{"id":87,"title":88,"organizationName":89,"prefectureName":12,"publishedDate":72,"deadlineDate":90,"budget":15,"status":16},3874543,"軽自動車税申告書","税務課","2026-09-02T15:00:00.000Z",[92,98,103,108,113],{"id":93,"title":94,"organizationName":11,"prefectureName":12,"publishedDate":95,"deadlineDate":96,"budget":15,"status":97},3364086,"小佐世保川排水区2号暗渠改良工事","2025-08-28T15:00:00.000Z","2025-09-09T15:00:00.000Z","closed",{"id":99,"title":100,"organizationName":11,"prefectureName":12,"publishedDate":101,"deadlineDate":102,"budget":15,"status":97},3364100,"大黒川排水区2号暗渠改良工事","2025-08-26T15:00:00.000Z","2025-09-07T15:00:00.000Z",{"id":104,"title":105,"organizationName":11,"prefectureName":12,"publishedDate":106,"deadlineDate":107,"budget":15,"status":97},3364154,"光月川排水区支流1号暗渠改良工事","2025-07-31T15:00:00.000Z","2025-08-18T15:00:00.000Z",{"id":109,"title":110,"organizationName":11,"prefectureName":12,"publishedDate":111,"deadlineDate":112,"budget":15,"status":97},3374347,"貸付川1号暗渠改良工事","2025-01-16T15:00:00.000Z","2025-01-28T15:00:00.000Z",{"id":114,"title":115,"organizationName":11,"prefectureName":12,"publishedDate":116,"deadlineDate":117,"budget":15,"status":97},3374382,"本ヶ浦川1号暗渠改良工事","2024-11-26T15:00:00.000Z","2024-12-08T15:00:00.000Z",[119,125,131,137],{"title":120,"link":121,"date":122,"thumb":123,"cat":124},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":126,"link":127,"date":128,"thumb":129,"cat":130},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":132,"link":133,"date":134,"thumb":135,"cat":136},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":138,"link":139,"date":140,"thumb":141,"cat":142},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]