[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-3709295":3,"bid-history-3709295":36,"bid-related-3709295":40,"union-latest":92},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":17,"bidCategoryName":18,"bidTypeName":19,"categoryText":20,"regionText":12,"deadlineTime":21,"openingDate":22,"qualificationText":23,"aiSummary":24,"aiSummaryGated":25,"aiSummaryTruncated":26,"sourceUrl":27,"dataSourceCode":28,"budgetTaxIncluded":15,"documentUrls":29,"businessExperience":26,"localOffice":31,"securityRequirement":31,"qualifications":32,"certifications":33,"organization":34},3709295,"R8荒川第三調節池取水施設予備設計他検討業務",9,11,7,40,3,"国土交通省関東地方整備局","埼玉県","2026-08-20T15:00:00.000Z","2026-08-30T15:00:00.000Z",null,"active","荒川調節池工事事務所","土木設計","企画競争（プロポーザル）","土木コンサル業務","15:00:00","2026-11-05T15:00:00.000Z","・関東地方整備局（港湾空港関係を除く）における令和7・8年度「土木関係建設コンサルタント業務」に係る一般競争（指名競争）参加資格の認定を受けていること\n・河川における樋管（取水樋管含む）の予備設計及び築堤詳細設計を行った業務実績があること（同種業務）\n・河川における樋管（取水樋管含む）の予備設計を行った業務実績があること（類似業務）\n・予算決算及び会計令第70条及び第71条に該当しないこと\n・関東地方整備局長から建設コンサルタント業務等に関し指名停止を受けていないこと\n・警察当局から暴力団員が実質的に経営を支配する者又はこれに準ずるものとして排除要請されていないこと\n・会社更生法又は民事再生法に基づき手続開始の申立てがなされていないこと（再認定を受けた者を除く）\n・設計共同体の場合、構成員間に資本関係又は人的関係がないこと","【案件概要】\n国土交通省関東地方整備局荒川調節池工事事務所が、荒川第三調節池取水施設予備設計他検討業務の簡易公募型プロポーザル方式による技術提案書の募集を実施。対象地域は埼玉県。予算規模は記載なし。公告日は令和8年8月21日、技術提案書提出期限は令和8年8月31日15時00分、開札日は令和8年11月6日10時01分。\n\n【業務内容】\n- 荒川第三調節池整備に","伴う農業用取水樋管についての予備設計\n- 荒川第二・三調節池の囲繞堤修正設計及び検討\n- BIM\u002FCIM適用業務（発注者指定型）での実施\n- ICTの全面的な活用に対応\n\n【応募要件】\n- 関東地方整備局（港湾空港関係を除く）における令和7・8年度「土木関係建設コンサルタント業務」に係る一般競争（指名競争）参加資格の認定を受けていること\n- 河川における樋管（取水樋管含む）の予備設計及び築堤詳細設計を行った同種業務実績、または予備設計を行った類似業務実績を有すること\n- 単体企業または設計共同体での参加が可能\n- 予算決算及び会計令第70条及び第71条に該当しないこと\n- 関東地方整備局長から建設コンサルタント業務等に関し指名停止を受けていないこと\n- 警察当局から暴力団員が実質的に経営を支配する者として排除要請されていないこと\n- 会社更生法または民事再生法に基づく手続開始の申立てがなされていないこと（再認定を受けた者を除く）\n- 設計共同体の場合、構成員間に資本関係又は人的関係がないこと\n\n【工期・期間】\n履行期間は令和8年11月中旬から令和9年5月31日まで\n\n【その他特記事項】\n- ワーク・ライフ・バランス等推進企業の評価加点あり\n- 技術提案書の評価基準：参加表明者及び配置予定技術者の経験と能力、業務実施体制、実施方針・工程計画、業務理解度等\n- 説明書交付期間：令和8年8月21日から9月29日（土日祝日除く、最終日は15時00分まで）\n- 契約保証金は免除\n- 契約書作成が必要",true,"(redacted)","ippi-gyomu",[30],{"url":27,"name":27},false,[],[],{"id":6,"name":11,"categoryId":35,"parentId":15,"parentName":15,"bidInfoUrl":15},17,[37],{"year":38,"count":39},2026,25,{"sameOrganization":41,"samePrefecture":66,"similar":91},[42,48,52,56,62],{"id":43,"title":44,"organizationName":11,"prefectureName":45,"publishedDate":46,"deadlineDate":47,"budget":15,"status":16},3885162,"R8・R9利根川上流域積雪調査業務","群馬県","2026-08-24T15:00:00.000Z","2026-09-03T15:00:00.000Z",{"id":49,"title":50,"organizationName":11,"prefectureName":51,"publishedDate":46,"deadlineDate":47,"budget":15,"status":16},3885161,"R8東京国道管内電線共同溝調査設計等業務","東京都",{"id":53,"title":54,"organizationName":11,"prefectureName":55,"publishedDate":46,"deadlineDate":47,"budget":15,"status":16},3885160,"R8霞ヶ浦水防災関係検討業務","茨城県",{"id":57,"title":58,"organizationName":11,"prefectureName":59,"publishedDate":60,"deadlineDate":61,"budget":15,"status":16},3860449,"R8千葉国道管内渋滞調査F5業務","千葉県","2026-08-23T15:00:00.000Z","2026-09-02T15:00:00.000Z",{"id":63,"title":64,"organizationName":11,"prefectureName":45,"publishedDate":60,"deadlineDate":65,"budget":15,"status":16},3860448,"R8利根砂防大規模土砂災害危機管理対応他検討業務","2026-09-23T15:00:00.000Z",[67,73,77,82,87],{"id":68,"title":69,"organizationName":70,"prefectureName":12,"publishedDate":46,"deadlineDate":71,"budget":72,"status":16},3894595,"樋管改修工事","富士見市 総務部 総務課","2026-09-07T15:00:00.000Z",18841900,{"id":74,"title":75,"organizationName":76,"prefectureName":12,"publishedDate":46,"deadlineDate":15,"budget":15,"status":16},3894575,"グリーンライフ猿花キャンプ場樹木剪定業務","さいたま市 子ども未来局子ども育成部 (子ども未来局子ども育成部)",{"id":78,"title":79,"organizationName":80,"prefectureName":12,"publishedDate":46,"deadlineDate":81,"budget":15,"status":16},3894574,"生徒用ロッカー・教師用ロッカーの購入","埼玉県 教育機関 狭山特別支援学校","2026-09-10T15:00:00.000Z",{"id":83,"title":84,"organizationName":85,"prefectureName":12,"publishedDate":46,"deadlineDate":86,"budget":15,"status":16},3891891,"御蔵中央通線(3工区)環境調査業務(R8)","さいたま市 建設局道路部 (建設局道路部)","2026-08-25T15:00:00.000Z",{"id":88,"title":89,"organizationName":90,"prefectureName":12,"publishedDate":46,"deadlineDate":15,"budget":15,"status":16},3891890,"道路側溝台帳図修正業務(北建道安R8)","さいたま市 建設局北部建設事務所 道路安全対策課",[],[93,99,105,111],{"title":94,"link":95,"date":96,"thumb":97,"cat":98},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":100,"link":101,"date":102,"thumb":103,"cat":104},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":106,"link":107,"date":108,"thumb":109,"cat":110},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":112,"link":113,"date":114,"thumb":115,"cat":116},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]