[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-3708785":3,"bid-history-3708785":37,"bid-related-3708785":41,"union-latest":105},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":11,"bidCategoryName":17,"bidTypeName":18,"categoryText":19,"regionText":20,"deadlineTime":21,"openingDate":22,"qualificationText":23,"aiSummary":24,"aiSummaryGated":25,"aiSummaryTruncated":26,"sourceUrl":27,"dataSourceCode":28,"budgetTaxIncluded":29,"documentUrls":30,"businessExperience":26,"localOffice":26,"securityRequirement":29,"qualifications":32,"certifications":33,"organization":34},3708785,"市道152号線外2線 道路改良工事",2017,12,2,14,1,"館山市 総務企画部 行革財政課","千葉県","2026-08-20T15:00:00.000Z","2026-08-31T15:00:00.000Z",45000000,"active","土木","一般競争入札","土木一式工事","館山市 館山 地内","16:30:00","2026-09-01T15:00:00.000Z","・公告日現在、令和8・9年度館山市入札参加適格者工事名簿に登載されており、土木一式工事に係る本市の格付等級がBランク以上であること\n・土木一式工事について、建設業法に基づく一般建設業又は特定建設業の許可を受けていること\n・経営事項審査結果の有効期間が切れていないこと\n・館山市内に本社・本店のある者\n・当該建設工事等の入札開始日から開札日までの間に、館山市建設工事請負業者等指名停止措置を受けていないこと\n・建設業法第20条の２第2項に基づき、恒常的な雇用関係（入札のあった日以前に3か月以上の雇用関係）にある主任技術者（監理技術者）を配置できること\n・過去10年間（平成28年度～令和7年度）に、公共工事の契約金額200万円以上の土木一式工事を元請として施工し、完成した実績を有すること\n・館山市入札契約に係る暴力団対策措置要綱に定める暴力団排除措置要件に該当しない者\n・手形交換所による取引停止処分を受けてから2年間を経過している者\n・対象工事の入札日前6か月以内に手形又は小切手の不渡りを出していない者\n・会社更生法の適用を申請した者で、同法に基づく裁判所からの更生手続開始決定がされていない者\n・民事再生法の適用を申請した者で、同法に基づく裁判所からの再生手続開始決定がされていない者\n・健康保険法第48条の規定による届出の義務を履行していること\n・厚生年金保険法第27条の規定による届出の義務を履行していること\n・雇用保険法第7条の規定による届出の義務を履行していること","【案件概要】\n館山市が市道152号線外2線の道路改良工事を一般競争入札で発注。対象地域は館山市館山地内。予定価格は45,000,000円（税抜）。工事延長L=49.0m、工期は契約日の翌日から令和9年1月29日まで。本工事は週休2日制適用工事（発注者指定型）であり、発注者指定により現場閉所による週休2日制に取り組む必要がある。入札方式は電子入札・事後審査方式","の制限付一般競争入札。\n\n【業務内容】\n- 道路土工：掘削工（土砂等運搬・整地を含む）\n- 地盤改良工：置換工（再生クラッシャーランRC-40を使用、数量69m³）\n- 舗装工：アスファルト舗装工、透水性舗装工を実施\n- 排水構造物工：U型側溝（L=44m）、管渠（L=31m）、集水桝（7箇所）の施工\n- 路面切削（A=219㎡）、不陸整正（A=211㎡）、下層路盤（A=482㎡）、上層路盤（A=168㎡）、基層（A=16㎡）、表層（A=912㎡）、薄層カラー舗装（A=154㎡）\n- 区画線工、信号機等移設\n- 交通安全施設整備\n\n【応募要件】\n- 公告日現在、令和8・9年度館山市入札参加適格者工事名簿に登載されており、土木一式工事に係る本市の格付等級がBランク以上であること\n- 土木一式工事について、建設業法に基づく一般建設業又は特定建設業の許可を受けていること\n- 経営事項審査結果の有効期間が切れていないこと\n- 館山市内に本社・本店のある者\n- 当該建設工事等の入札開始日から開札日までの間に、館山市建設工事請負業者等指名停止措置を受けていないこと\n- 建設業法第20条の２第2項に基づく資格を持ち、恒常的な雇用関係（入札のあった日以前に3か月以上）にある主任技術者（監理技術者）を配置できること\n- 過去10年間（平成28年度～令和7年度）に、公共工事の契約金額200万円以上の土木一式工事を元請として施工し、完成した実績を有すること\n- 暴力団排除措置要件に該当しない者\n- 手形交換所による取引停止処分を受けてから2年間を経過している者\n- 対象工事の入札日前6か月以内に手形又は小切手の不渡りを出していない者\n- 会社更生法・民事再生法の適用を申請していない者、又は裁判所から手続開始決定を受けていない者\n- 健康保険法、厚生年金保険法、雇用保険法の届出義務を履行している者\n\n【工期・期間】\n工期：契約日の翌日から令和9年1月29日まで\n設計図書縦覧期間：令和8年8月21日（金）から令和8年9月2日（水）まで\n質問受付期限：令和8年8月26日（水）午後4時30分まで\n入札期間：令和8年8月31日（月）午前9時から令和8年9月1日（火）午後4時30分まで\n開札日時：令和8年9月2日（水）午前9時40分\n資格確認書類提出期限：開札日の翌日（閉庁日に当たる場合は翌開庁日）正午まで",true,"(redacted)","ppi-core-chiba",false,[31],{"url":27,"name":27},[],[],{"id":6,"name":11,"categoryId":35,"parentId":36,"parentName":36,"bidInfoUrl":36},15,null,[38],{"year":39,"count":40},2026,17,{"sameOrganization":42,"samePrefecture":59,"similar":81},[43,47,50,53,56],{"id":44,"title":45,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":46,"status":16},3708784,"市道3016号線 道路舗装補修工事",3510000,{"id":48,"title":49,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":36,"budget":36,"status":16},3708582,"館山市長選挙公営ポスター掲示場設置及び撤去業務委託",{"id":51,"title":52,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":36,"budget":36,"status":16},3708581,"【見積合せ】館山市長選挙公営ポスター掲示板購入",{"id":54,"title":55,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":36,"budget":36,"status":16},3708580,"【見積合せ】水中攪拌ポンプ購入",{"id":57,"title":58,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":36,"budget":36,"status":16},3708579,"【見積合せ】深井戸用水中ポンプ購入",[60,66,69,72,77],{"id":61,"title":62,"organizationName":63,"prefectureName":12,"publishedDate":64,"deadlineDate":65,"budget":36,"status":16},3893037,"千葉市稲毛区稲丘町11番地先外配水管整備工事に伴う設計業務委託","千葉県 企業局管理部 千葉水道事務所","2026-08-24T15:00:00.000Z","2026-09-08T15:00:00.000Z",{"id":67,"title":68,"organizationName":63,"prefectureName":12,"publishedDate":64,"deadlineDate":65,"budget":36,"status":16},3893036,"千葉市花見川区柏井町644番地先花見川水管橋外修繕工事に伴う設計業務委託",{"id":70,"title":71,"organizationName":63,"prefectureName":12,"publishedDate":64,"deadlineDate":65,"budget":36,"status":16},3893035,"千葉市中央区登戸1丁目6番地先外配水管整備工事に伴う設計業務委託",{"id":73,"title":74,"organizationName":75,"prefectureName":12,"publishedDate":64,"deadlineDate":76,"budget":36,"status":16},3892835,"県単河川総合開発委託(亀山ダム外資材価格等特別調査その2)","千葉県 県土整備部 亀山・片倉ダム管理事務所","2026-09-09T15:00:00.000Z",{"id":78,"title":79,"organizationName":75,"prefectureName":12,"publishedDate":64,"deadlineDate":80,"budget":36,"status":16},3892235,"県単河川総合開発委託(矢那川ダム堤体変位観測)","2026-09-02T15:00:00.000Z",[82,88,92,96,101],{"id":83,"title":84,"organizationName":85,"prefectureName":86,"publishedDate":64,"deadlineDate":76,"budget":87,"status":16},3893175,"市道曙町稲佐町線道路改良工事【余任】","長崎市","長崎県",7068000,{"id":89,"title":90,"organizationName":85,"prefectureName":86,"publishedDate":64,"deadlineDate":76,"budget":91,"status":16},3893171,"市道鳴見台5号線道路舗装工事",16550000,{"id":93,"title":94,"organizationName":85,"prefectureName":86,"publishedDate":64,"deadlineDate":14,"budget":95,"status":16},3893170,"市道京泊2号線道路舗装工事",20052000,{"id":97,"title":98,"organizationName":99,"prefectureName":100,"publishedDate":64,"deadlineDate":36,"budget":36,"status":16},3885272,"市道幹線1号線配水管布設替工事(寺尾工区)","秩父広域市町村圏組合 事務局 財務課","埼玉県",{"id":102,"title":103,"organizationName":104,"prefectureName":100,"publishedDate":64,"deadlineDate":36,"budget":36,"status":16},3885266,"県道富岡入間線・市道A67号線配水管布設替実施設計業務委託","入間市 上下水道部 上下水道経営課(総務担当)",[106,112,118,124],{"title":107,"link":108,"date":109,"thumb":110,"cat":111},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":113,"link":114,"date":115,"thumb":116,"cat":117},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":119,"link":120,"date":121,"thumb":122,"cat":123},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":125,"link":126,"date":127,"thumb":128,"cat":129},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]