[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-3707760":3,"bid-history-3707760":36,"bid-related-3707760":40,"union-latest":113},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":17,"bidCategoryName":18,"bidTypeName":19,"categoryText":20,"regionText":21,"deadlineTime":22,"openingDate":14,"qualificationText":23,"aiSummary":24,"aiSummaryGated":25,"aiSummaryTruncated":26,"sourceUrl":27,"dataSourceCode":28,"budgetTaxIncluded":15,"documentUrls":29,"businessExperience":26,"localOffice":26,"securityRequirement":31,"qualifications":32,"certifications":33,"organization":34},3707760,"令和 8年度 ICTモデル事業 大野川上流地区水管理省力化対策施設整備工事",1450,44,2,14,1,"農林水産省九州農政局","大分県","2026-08-20T15:00:00.000Z","2026-09-17T15:00:00.000Z",null,"active","北部九州土地改良調査管理事務所","土木","一般競争入札","土木一式工事","大分県竹田市荻町地内","12:00:00","・熊本県内又は大分県内に建設業法に基づく本社（店）を有すること\n・令和7・8年度一般競争（指名競争）参加資格で土木一式工事「B等級又はC等級」の確認を受けていること（開札時までに確認必須）\n・平成23年4月1日～令和8年3月31日の期間に元請として完成・引渡しが完了した「水路・管路工事」の同種工事施工実績を有すること\n・共同企業体の場合は構成員のうち1者が同種工事施工実績を有し、出資比率20%以上であること\n・配置予定技術者として以下いずれかの資格を有する者を当該工事に専任で配置可能：監理技術者、1級国家資格者（土木施工管理技士・建設機械施工技士）、2級国家資格者（土木施工管理技士（土木）・建設機械施工技士）、技術士（建設・農業・森林・水産・総合技術監理部門）、10年以上の土木一式工事実務経験者\n・配置予定技術者が、同種工事について1年未満工期では1\u002F2以上、1年以上工期では6ヶ月以上の従事期間の工事経験を有すること\n・申請書提出から開札時までの期間に指名停止を受けていないこと\n・暴力団排除推進について警察当局から排除要請を受けていないこと\n・会社更生法または民事再生法に基づき手続開始の申立てがなされていないこと（再確認済みの場合を除く）\n・健康保険法、厚生年金保険法、雇用保険法の届出義務を履行していることを確認できる通知書の写しを提出すること\n・当該工事の設計業務等の受託者及びその関連建設業者でないこと\n・複数者間に資本関係又は人的関係がないこと","【案件概要】\n農林水産省九州農政局が、大分県竹田市荻町地内における令和8年度ICTモデル事業を実施。大野川上流地区の水管理省力化対策のため、分水路内の関係施設整備工事に関する一般競争入札（標準型）を公告。予算規模は記載なし、工期は165日間（余裕工期30日含む）。公告日は令和8年8月21日、入札期限は令和8年9月17日正午、開札日は令和8年9月18日午前9時","。本工事は総合評価落札方式（簡易Ⅱ型・企業実績重視型）、施工体制確認型、電子契約システム対象工事。\n\n【業務内容】\n- 分水内水路の整備：二次製品水路（BF200～BF300）、現場打ちコンクリート桝の設置\n- 自動給水ゲート（150×150～250×250、複数仕様）の設置（計88箇所）\n- 通信中継機の設置（2基）\n- 付帯工整備：二次製品水路、分岐部ゲート（150×150～300×300、複数仕様）の設置\n- ICT技術の活用による自動制御・遠隔監視システムの構築\n- 無効放流削減、水管理労力削減に資する施設整備\n\n【応募要件】\n- 熊本県内又は大分県内に建設業法に基づく本社（店）を有すること\n- 令和7・8年度一般競争参加資格で土木一式工事「B等級又はC等級」の確認を受けていること（開札時までに確認必須）\n- 水路・管路工事の同種工事施工実績を、平成23年4月1日～令和8年3月31日の期間に元請として完成・引渡し済みであること\n- 配置予定技術者として、以下いずれかの資格を有する者を当該工事に専任で配置可能であること：①監理技術者（監理技術者資格者証および監理技術者講習修了証保有者）②1級土木施工管理技士または建設機械施工技士③2級土木施工管理技士（土木）または建設機械施工技士④技術士（建設部門、農業部門、森林部門、水産部門、総合技術監理部門のいずれか）⑤10年以上の土木一式工事実務経験者\n- 配置予定技術者が、同種工事について別表１①の期間内に、1年未満工期で1\u002F2以上、1年以上工期で6ヶ月以上の従事経験を有すること\n- 申請書提出から開札時までの期間に九州農政局工事請負契約指名停止等措置要領に基づく指名停止を受けていないこと\n- 暴力団排除推進について警察当局から排除要請を受けていないこと\n- 会社更生法または民事再生法に基づき手続開始の申立てがなされていないこと（既に手続開始決定を受けた場合は再確認必須）\n- 健康保険法、厚生年金保険法、雇用保険法の届出義務を履行していることの確認書類（通知書の写し）を提出すること\n- 設計業務等の受託者及びその関連建設業者でないこと\n- 複数者間に資本関係または人的関係がないこと\n- 共同企業体の場合は構成員のうち1者が同種工事施工実績を有し、出資比率20%以上であること\n\n【工期・期間】\n契約締結日から165日間（余裕工期30日含む）",true,"(redacted)","ippi-koji",[30],{"url":27,"name":27},false,[],[],{"id":6,"name":11,"categoryId":35,"parentId":15,"parentName":15,"bidInfoUrl":15},141,[37],{"year":38,"count":39},2026,63,{"sameOrganization":41,"samePrefecture":68,"similar":91},[42,48,53,59,63],{"id":43,"title":44,"organizationName":11,"prefectureName":45,"publishedDate":46,"deadlineDate":47,"budget":15,"status":16},3860441,"令和 8年度 筑後川下流右岸農地防災事業 標準地評価業務","佐賀県","2026-08-23T15:00:00.000Z","2026-10-15T15:00:00.000Z",{"id":49,"title":50,"organizationName":11,"prefectureName":51,"publishedDate":46,"deadlineDate":52,"budget":15,"status":16},3859952,"八代平野農業水利事業 流藻川排水機場ポンプ製作据付建設工事","熊本県","2026-11-11T15:00:00.000Z",{"id":54,"title":55,"organizationName":11,"prefectureName":56,"publishedDate":57,"deadlineDate":58,"budget":15,"status":16},3651182,"令和 8年度 地域整備方向検討調査 耳納山麓地域用水計画検討業務","福岡県","2026-08-19T15:00:00.000Z","2026-10-12T15:00:00.000Z",{"id":60,"title":61,"organizationName":11,"prefectureName":45,"publishedDate":62,"deadlineDate":47,"budget":15,"status":16},3573352,"令和 8年度 広域農業基盤整備管理調査 多良岳地区耐震対策検討その他業務","2026-08-17T15:00:00.000Z",{"id":64,"title":65,"organizationName":11,"prefectureName":12,"publishedDate":66,"deadlineDate":67,"budget":15,"status":16},3575415,"令和7年度 駅館川農地整備事業 減圧水槽等実施設計業務","2026-08-09T15:00:00.000Z","2026-10-14T15:00:00.000Z",[69,74,79,83,86],{"id":70,"title":71,"organizationName":12,"prefectureName":12,"publishedDate":46,"deadlineDate":72,"budget":73,"status":16},3882942,"一般競争入札に付する事項","2026-09-02T15:00:00.000Z",2475817,{"id":75,"title":76,"organizationName":77,"prefectureName":12,"publishedDate":13,"deadlineDate":78,"budget":15,"status":16},3746347,"合瀬芋笠101作業道新設工事","林野庁九州森林管理局大分西部森林管理署","2026-09-29T15:00:00.000Z",{"id":80,"title":81,"organizationName":82,"prefectureName":12,"publishedDate":13,"deadlineDate":15,"budget":15,"status":16},3746346,"入札公告の取り止めに関する公告(切込1054林道新設工事)","林野庁九州森林管理局大分森林管理署",{"id":84,"title":85,"organizationName":12,"prefectureName":12,"publishedDate":13,"deadlineDate":78,"budget":15,"status":16},3746345,"一般競争入札のお知らせ(庁内無線LAN機器等一式の賃貸借)",{"id":87,"title":88,"organizationName":89,"prefectureName":12,"publishedDate":13,"deadlineDate":90,"budget":15,"status":16},3746344,"大分大学医学部附属病院病棟等クラーク業務 一式","国立大学法人大分大学","2026-09-08T15:00:00.000Z",[92,99,104,107,110],{"id":93,"title":94,"organizationName":95,"prefectureName":96,"publishedDate":97,"deadlineDate":98,"budget":15,"status":16},3892009,"令和8年度漁業調査指導船「いばらき丸」点検整備工事(水産試験場)","茨城県 農林水産部 水産試験場","茨城県","2026-08-24T15:00:00.000Z","2026-09-13T15:00:00.000Z",{"id":100,"title":101,"organizationName":102,"prefectureName":103,"publishedDate":97,"deadlineDate":15,"budget":15,"status":16},3887870,"令和8年度 配水管布設替工事(その2)","宮代町 企画財政課 企画財政室","埼玉県",{"id":105,"title":106,"organizationName":102,"prefectureName":103,"publishedDate":97,"deadlineDate":15,"budget":15,"status":16},3887869,"令和8年度 宮代第5号汚水幹線・枝線布設替工事",{"id":108,"title":109,"organizationName":102,"prefectureName":103,"publishedDate":97,"deadlineDate":15,"budget":15,"status":16},3887868,"令和8年度 舗装復旧工事(その3)",{"id":111,"title":112,"organizationName":102,"prefectureName":103,"publishedDate":97,"deadlineDate":15,"budget":15,"status":16},3887867,"令和8年度 舗装復旧工事(その4)",[114,120,126,132],{"title":115,"link":116,"date":117,"thumb":118,"cat":119},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":121,"link":122,"date":123,"thumb":124,"cat":125},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":127,"link":128,"date":129,"thumb":130,"cat":131},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":133,"link":134,"date":135,"thumb":136,"cat":137},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]