[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-3683976":3,"bid-history-3683976":37,"bid-related-3683976":41,"union-latest":119},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":11,"bidCategoryName":17,"bidTypeName":18,"categoryText":19,"regionText":20,"deadlineTime":21,"openingDate":22,"qualificationText":23,"aiSummary":24,"aiSummaryGated":25,"aiSummaryTruncated":26,"sourceUrl":27,"dataSourceCode":28,"budgetTaxIncluded":26,"documentUrls":29,"businessExperience":26,"localOffice":26,"securityRequirement":31,"qualifications":32,"certifications":33,"organization":34},3683976,"社会資本整備総合交付金工事(早船道路改良工)",1935,12,2,15,1,"千葉県 県土整備部 山武土木事務所","千葉県","2026-08-20T15:00:00.000Z","2026-09-10T15:00:00.000Z",43153000,"active","舗装","一般競争入札","道路改良工","一般国道126号 山武市早船外","17:00:00","2026-09-14T15:00:00.000Z","・千葉県建設工事等入札参加資格者名簿に土木一式工事の格付がB等級である者\n・建設業の許可を有する者\n・東金市、山武市、大網白里市、山武郡九十九里町又は山武郡横芝光町（旧横芝町）の一部に資格者名簿に登載された主たる営業所（本店）を有する者\n・過去15年間に国道又は県道における路床工事を元請で施工した実績がある者\n・土木一式工事に係る完成工事高が43百万円以上である者\n・資格確認申請期限日から落札決定の時までの間、指名停止措置を受けていない者\n・手形交換所による取引停止処分を受けてから2年間を経過しており、入札日前6か月以内に手形・小切手を不渡りしていない者\n・会社更生法又は民事再生法に基づく裁判所からの手続開始決定を受けていない者\n・経常JVで参加した場合、その構成員は参加できない者\n・本案件に係る設計業務等の受託者又は当該受託者と資本若しくは人事面において関連がない者","【案件概要】\n千葉県山武土木事務所が社会資本整備総合交付金工事として、一般国道126号山武市早船地先における道路改良工事の一般競争入札を実施。事後審査Ⅱ型による価格競争方式で、予定価格は43,153,000円（税込み）。工事期間は150日間で、最低制限価格制度を適用。入札公告期間は令和8年8月21日～9月3日で、開札日は9月15日（火）10時20分の予定。\n","【業務内容】\n- 工事延長104.3m、基層226㎡、側溝工94mの道路改良工事\n- 道路土工（掘削工、路床盛土工、法面整形工）\n- 地盤改良工（路床安定処理、防草コンクリート）\n- 舗装工（下層路盤、上層路盤、基層、表層、透水性舗装）\n- 排水構造物工（プレキャストU型側溝、管渠工、集水桝・マンホール工）\n- 縁石工、防護柵工、仮設工（土留・仮締切工、交通管理工、水替工）\n- 構造物撤去工（旧橋撤去、舗装版破砕、コンクリート構造物取壊し）\n\n【応募要件】\n- 千葉県建設工事等入札参加資格者名簿に土木一式工事B等級で登載されている者\n- 建設業の許可を有する者\n- 東金市、山武市、大網白里市、山武郡九十九里町または山武郡横芝光町（旧横芝町）に本店を有する者\n- 過去15年間に、国道または県道における路床工事を元請で施工した実績がある者\n- 土木一式工事に係る完成工事高が43百万円以上である者\n- 指名停止措置を受けていない者\n- 設計業務受託者（株式会社福山コンサルタント、八紘測量開発株式会社）と資本・人事面で関連がない者\n\n【工期・期間】\n契約日の翌日から150日間。準備期間40日、後片付け期間20日、その他期間（函渠工材料調達）30日を見込んでいる。",true,"(redacted)","ppi-core-chiba",[30],{"url":27,"name":27},false,[],[],{"id":6,"name":11,"categoryId":35,"parentId":36,"parentName":36,"bidInfoUrl":36},50,null,[38],{"year":39,"count":40},2026,37,{"sameOrganization":42,"samePrefecture":66,"similar":88},[43,48,52,56,61],{"id":44,"title":45,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":46,"budget":47,"status":16},3683977,"県単砂防整備工事(馬場・法面復旧工)","2026-09-17T15:00:00.000Z",33407000,{"id":49,"title":50,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":51,"status":16},3683975,"防災・安全交付金(交通安全)工事(上谷歩道工)",34859000,{"id":53,"title":54,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":55,"status":16},3683974,"無電柱化推進計画工事(東金電線共同溝整備工)",45342000,{"id":57,"title":58,"organizationName":11,"prefectureName":12,"publishedDate":59,"deadlineDate":60,"budget":36,"status":16},3563350,"県単道路維持修繕委託(動物の死がい回収業務その2)","2026-08-17T15:00:00.000Z","2026-08-30T15:00:00.000Z",{"id":62,"title":63,"organizationName":11,"prefectureName":12,"publishedDate":64,"deadlineDate":65,"budget":36,"status":16},3562844,"県単河川管理工事(木戸外・河川陸閘修繕工)","2026-08-06T15:00:00.000Z","2026-08-31T15:00:00.000Z",[67,73,76,79,84],{"id":68,"title":69,"organizationName":70,"prefectureName":12,"publishedDate":71,"deadlineDate":72,"budget":36,"status":16},3893037,"千葉市稲毛区稲丘町11番地先外配水管整備工事に伴う設計業務委託","千葉県 企業局管理部 千葉水道事務所","2026-08-24T15:00:00.000Z","2026-09-08T15:00:00.000Z",{"id":74,"title":75,"organizationName":70,"prefectureName":12,"publishedDate":71,"deadlineDate":72,"budget":36,"status":16},3893036,"千葉市花見川区柏井町644番地先花見川水管橋外修繕工事に伴う設計業務委託",{"id":77,"title":78,"organizationName":70,"prefectureName":12,"publishedDate":71,"deadlineDate":72,"budget":36,"status":16},3893035,"千葉市中央区登戸1丁目6番地先外配水管整備工事に伴う設計業務委託",{"id":80,"title":81,"organizationName":82,"prefectureName":12,"publishedDate":71,"deadlineDate":83,"budget":36,"status":16},3892835,"県単河川総合開発委託(亀山ダム外資材価格等特別調査その2)","千葉県 県土整備部 亀山・片倉ダム管理事務所","2026-09-09T15:00:00.000Z",{"id":85,"title":86,"organizationName":82,"prefectureName":12,"publishedDate":71,"deadlineDate":87,"budget":36,"status":16},3892235,"県単河川総合開発委託(矢那川ダム堤体変位観測)","2026-09-02T15:00:00.000Z",[89,95,101,106,112],{"id":90,"title":91,"organizationName":92,"prefectureName":92,"publishedDate":93,"deadlineDate":64,"budget":36,"status":94},3046128,"県道甲浦インター線((仮称)1号橋下部工)社会資本整備総合交付金工事(道交地(改築)第101-015-4号)(令和8年7月30日公告)","高知県","2026-07-29T15:00:00.000Z","closed",{"id":96,"title":97,"organizationName":11,"prefectureName":12,"publishedDate":98,"deadlineDate":99,"budget":100,"status":94},2197103,"社会資本整備総合交付金工事(田越道路改良工)","2026-07-02T15:00:00.000Z","2026-07-27T15:00:00.000Z",37708000,{"id":102,"title":103,"organizationName":104,"prefectureName":12,"publishedDate":105,"deadlineDate":36,"budget":36,"status":16},1906034,"社会資本整備総合交付金工事(松野補強土壁工その2) ※添付有","千葉県 県土整備部 夷隅土木事務所","2026-06-25T15:00:00.000Z",{"id":107,"title":108,"organizationName":109,"prefectureName":12,"publishedDate":110,"deadlineDate":111,"budget":36,"status":94},2197088,"社会資本整備総合交付金工事(北賑橋A2橋台工)","千葉県 県土整備部 香取土木事務所","2026-06-22T15:00:00.000Z","2026-07-21T15:00:00.000Z",{"id":113,"title":114,"organizationName":115,"prefectureName":12,"publishedDate":116,"deadlineDate":117,"budget":118,"status":94},2201282,"社会資本整備総合交付金工事(磯ヶ谷道路改良工)","千葉県 県土整備部 市原土木事務所","2026-06-18T15:00:00.000Z","2026-07-16T15:00:00.000Z",42691000,[120,126,132,138],{"title":121,"link":122,"date":123,"thumb":124,"cat":125},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":127,"link":128,"date":129,"thumb":130,"cat":131},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":133,"link":134,"date":135,"thumb":136,"cat":137},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":139,"link":140,"date":141,"thumb":142,"cat":143},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]