[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-3655059":3,"bid-history-3655059":38,"bid-related-3655059":42,"union-latest":111},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":17,"bidCategoryName":18,"bidTypeName":19,"categoryText":20,"regionText":21,"deadlineTime":22,"openingDate":23,"qualificationText":24,"aiSummary":25,"aiSummaryGated":26,"aiSummaryTruncated":27,"sourceUrl":28,"dataSourceCode":29,"budgetTaxIncluded":15,"documentUrls":30,"businessExperience":27,"localOffice":32,"securityRequirement":32,"qualifications":33,"certifications":35,"organization":36},3655059,"海自大湊(8)桟橋工事監理業務",1622,2,7,40,1,"防衛省東北防衛局","青森県","2026-08-19T15:00:00.000Z","2026-09-02T15:00:00.000Z",null,"active","総務部","土木設計","一般競争入札","コンサルタント 土木","青森県むつ市","12:00:00","2026-11-12T15:00:00.000Z","・防衛省令和7・8年度一般競争参加資格における土木コンサルタントA等級の格付を受けていること（共同体の場合、代表者がA等級、構成員がB以上）\n・予決令第70条及び第71条の規定に該当しないこと\n・会社更生法又は民事再生法に基づく手続開始申立てを受けていないこと（手続開始決定後に再度格付を受けた場合を除く）\n・平成28年4月1日から入札公告日までに桟橋新設工事の監理業務又は設計業務、若しくは港湾施設工事の監理業務又は設計業務について、元請けまたは防衛省総合発注業務の再委託業者として完了した実績を有すること（業務成績評定点65点以上）\n・配置予定管理技術者が次の資格のいずれかを有すること：技術士（総合技術監理部門：建設部門関連科目又は建設部門）、1級土木施工管理技士、土木学会特別上級技術者・上級技術者・1級技術者、公共工事品質確保技術者(I)又は(II)、RCCM又は同等能力を有する者\n・配置予定管理技術者が過去10年以内に国・都道府県・政令市・特殊法人が発注した設計業務又は工事監理業務の経験を有すること\n・配置予定管理技術者が平成28年4月1日以降に完了した同種又は類似業務の経験を有し、業務成績評定点が65点以上であること（原則として着手時から完了時まで従事）\n・配置予定管理技術者の手持ち業務量が5億円未満かつ20件未満であること（調査基準価格以下の業務がある場合は2億5千万円未満かつ5件未満）\n・配置予定管理技術者が入札公告日時点で申請者と直接的な雇用関係にあること\n・申請書提出期限から開札時点までの間に指名停止を受けていないこと\n・入札参加者間に資本関係、人的関係又はそれらと同視しうる関係がないこと\n・令和6年度及び令和7年度完了業務の実績がある場合、評定点平均が65点以上であること\n・都道府県警察から暴力団関係業者として排除要請を受けておらず、当該状態が継続していないこと\n・業務実施体制の妥当性が確認できること（再委託が主たる部分でなく、分担構成が明確かつ自然であること）\n・情報保全に係る履行体制について懸念が存在せず、特定の国籍等要件を満たすこと","【案件概要】\n防衛省東北防衛局が、海自大湊(8)桟橋工事監理業務の一般競争入札を実施します。青森県むつ市における桟橋新設工事の監理業務で、予定価格が1,000万円を超える業務です。本業務は価格と価格以外の要素を総合的に評価する総合評価落札方式が適用されます。履行期間は契約締結日の翌日から令和11年2月28日までの約25ヶ月間です。低価格入札による品質低下を防","ぐため第三者履行確認の義務付けと履行確実性の審査が実施されます。\n\n【業務内容】\n- 管理技術者による巡回監理（延べ32人・日）\n- 技術者の常駐配置（25ヶ月間）\n- 技術者による巡回業務（延べ12人・日）\n- 設計変更業務に対応する技術者の配置（延べ20人・日）\n\n【応募要件】\n- 防衛省令和7・8年度一般競争参加資格において土木コンサルタントA等級の格付を受けている者（共同体の場合、代表者がA等級、構成員がB以上）\n- 平成28年4月1日から入札公告日（令和8年8月20日）までに、桟橋新設工事の監理業務又は設計業務、若しくは港湾施設工事の監理業務又は設計業務について、元請けまたは防衛省総合発注業務の再委託業者として実績を有すること（業務成績評定点65点以上）\n- 配置予定管理技術者は、技術士（総合技術監視部門：建設関連科目または建設部門）、1級土木施工管理技士、土木学会認定技術者、公共工事品質確保技術者、またはRCCM認定者のいずれかの資格を有すること\n- 配置予定管理技術者は、過去10年以内に国・都道府県・政令市・特殊法人が発注した設計業務または工事監理業務の経験を有すること\n- 配置予定管理技術者は、同種または類似業務において平成28年4月1日以降に完了した業務経験を有し、業務成績評定点が65点以上であること\n- 配置予定管理技術者の手持ち業務量が5億円未満かつ20件未満（調査基準価格以下の業務がある場合は2億5千万円未満かつ5件未満）\n- 配置予定管理技術者は入札公告日時点で申請者と直接的な雇用関係にあること\n- 申請書提出期限から開札までの期間に指名停止を受けていないこと\n- 令和6・7年度完了業務の実績がある場合、評定点平均が65点以上であること\n- 都道府県警察から暴力団関係業者として排除されていないこと\n- 情報保全に係る履行体制について懸念がなく、国籍等に関する制限に適合すること\n\n【工期・期間】\n契約締結日の翌日から令和11年2月28日まで（約25ヶ月間）",true,"(redacted)","ippi-gyomu",[31],{"url":28,"name":28},false,[34],4,[],{"id":6,"name":11,"categoryId":37,"parentId":15,"parentName":15,"bidInfoUrl":15},11,[39],{"year":40,"count":41},2026,6,{"sameOrganization":43,"samePrefecture":61,"similar":89},[44,48,51,54,57],{"id":45,"title":46,"organizationName":11,"prefectureName":47,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},3655062,"仙台外(8)設備工事監理業務","宮城県",{"id":49,"title":50,"organizationName":11,"prefectureName":47,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},3655061,"松島(8)設備工事監理業務",{"id":52,"title":53,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},3655060,"海自八戸外(8)設備工事監理業務",{"id":55,"title":56,"organizationName":11,"prefectureName":47,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},3655058,"霞目外(8)建築工事監理業務",{"id":58,"title":59,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":60,"budget":15,"status":16},3650684,"三沢米軍(8)格納庫新設機械工事","2026-10-05T15:00:00.000Z",[62,68,74,79,84],{"id":63,"title":64,"organizationName":65,"prefectureName":12,"publishedDate":66,"deadlineDate":67,"budget":15,"status":16},3886559,"青森港油川地区航路・泊地(-12m)外浚渫工事","国土交通省東北地方整備局","2026-08-24T15:00:00.000Z","2026-10-25T15:00:00.000Z",{"id":69,"title":70,"organizationName":71,"prefectureName":12,"publishedDate":72,"deadlineDate":73,"budget":15,"status":16},3882752,"元素分析装置 一式(⁨143KB)","国立大学法人弘前大学","2026-08-23T15:00:00.000Z","2026-09-06T15:00:00.000Z",{"id":75,"title":76,"organizationName":77,"prefectureName":12,"publishedDate":72,"deadlineDate":78,"budget":15,"status":16},3882674,"(RE-10111)核融合原型炉における密度分布及びプラズマ位置診断のための反射計の適用性の検討【掲載期間:2026-8-24~2026-9-14】","国立研究開発法人量子科学技術研究開発機構核融合エネルギー研究開発部門六ヶ所核融合研究所","2026-09-14T15:00:00.000Z",{"id":80,"title":81,"organizationName":77,"prefectureName":12,"publishedDate":82,"deadlineDate":83,"budget":15,"status":16},3744487,"(RE-09577)微細構造解析装置の移設作業【掲載期間:2026-8-21~2026-9-10】","2026-08-20T15:00:00.000Z","2026-09-09T15:00:00.000Z",{"id":85,"title":86,"organizationName":87,"prefectureName":12,"publishedDate":13,"deadlineDate":88,"budget":15,"status":16},3744485,"森林環境保全整備事業(北来満山地区)","林野庁東北森林管理局三八上北森林管理署","2026-10-01T15:00:00.000Z",[90,95,100,104,107],{"id":91,"title":92,"organizationName":11,"prefectureName":12,"publishedDate":93,"deadlineDate":94,"budget":15,"status":16},3309611,"海自大湊(8)火薬庫新設進入路整備土木工事","2026-08-05T15:00:00.000Z","2026-08-26T15:00:00.000Z",{"id":96,"title":97,"organizationName":11,"prefectureName":12,"publishedDate":98,"deadlineDate":99,"budget":15,"status":16},3012021,"海自大湊(8)桟橋新設工事","2026-07-29T15:00:00.000Z","2026-09-16T15:00:00.000Z",{"id":101,"title":102,"organizationName":11,"prefectureName":12,"publishedDate":98,"deadlineDate":13,"budget":15,"status":103},3012020,"海自大湊(近川)(8)外柵新設等土木工事","closed",{"id":105,"title":106,"organizationName":11,"prefectureName":12,"publishedDate":98,"deadlineDate":13,"budget":15,"status":103},3012019,"海自大湊(樺山)(8)外柵新設等土木工事",{"id":108,"title":109,"organizationName":11,"prefectureName":12,"publishedDate":110,"deadlineDate":83,"budget":15,"status":16},2743430,"海自大湊(8)浚渫工事","2026-07-22T15:00:00.000Z",[112,118,124,130],{"title":113,"link":114,"date":115,"thumb":116,"cat":117},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":119,"link":120,"date":121,"thumb":122,"cat":123},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":125,"link":126,"date":127,"thumb":128,"cat":129},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":131,"link":132,"date":133,"thumb":134,"cat":135},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]