[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-3634574":3,"bid-history-3634574":36,"bid-related-3634574":40,"union-latest":110},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":17,"bidCategoryName":18,"bidTypeName":19,"categoryText":20,"regionText":11,"deadlineTime":21,"openingDate":22,"qualificationText":23,"aiSummary":24,"aiSummaryGated":25,"aiSummaryTruncated":26,"sourceUrl":27,"dataSourceCode":28,"budgetTaxIncluded":15,"documentUrls":29,"businessExperience":26,"localOffice":26,"securityRequirement":31,"qualifications":32,"certifications":33,"organization":34},3634574,"(建第08056号)新道地区8号水路他測量設計委託業務【8月19日公告】",106,39,7,40,1,"高知県香南市","高知県","2026-08-18T15:00:00.000Z","2026-09-01T15:00:00.000Z",null,"active","香南市契約管財課","土木設計","一般競争入札","役務","22:00:00","2026-09-02T15:00:00.000Z","・香南市測量・建設コンサルタント等業務競争入札参加資格有資格者名簿の「測量一般」又は「道路」に登録されている者\n・地方自治法施行令第167条の４の規定に該当しない者\n・公告日から開札日までの間に香南市指名停止措置を受けていない者\n・暴力団排除規則の排除措置対象者に該当しない者\n・会社更生法に基づく更生手続開始の申立て又は民事再生法に基づく再生手続開始の申立てがなされていない者\n・高知県内に主たる営業所を置く者\n・以下のいずれかの要件を満たす管理技術者及び照査技術者を配置することができる者：測量法の規定により測量士として登録されている者、技術士（建設部門「道路」又は総合技術監理部門「建設-道路」）、建設コンサルタント登録規程に基づき国土交通大臣の認定を受けている者（登録部門「道路」）、RCCM（登録部門「道路」）\n・令和3年度以降に地方公共団体が発注した同種業務を元請として受注し、業務を完了した実績を有する者（（ア）の要件を満たす者の場合）\n・他の入札参加者との間に資本関係又は人的関係がないこと","【案件概要】\n香南市が新道地区の水路測量設計委託業務の制限付一般競争入札を実施。対象地域は高知県香南市野市町下井地先。業務規模は総延長1.430km（8号～12号水路）の測量・設計業務で、予定価格は事後公表（予定価格の10分の6～10分の8.5の範囲で最低制限価格を設定）。公告日は令和8年8月19日。\n\n【業務内容】\n- 8号水路（L=430.0m）、9号水","路（L=240.0m）、10号水路（L=300.0m）、11号水路（L=90.0m）、12号水路（L=370.0m）の測量設計\n- 基準点測量（4級）\n- 水準測量観測（4級）\n- 現地測量（縮尺1\u002F500）\n- 路線測量（中心線測量、横断測量、縦断測量）\n- 用地測量（復元測量、平面図作成、境界確認等）\n- 水路詳細設計（開水路、構造計算、構造図作成等）\n- 成果品提出（平面図、縦断図、横断図、電子データ）\n- TECRIS（測量調査設計業務実績情報サービス）への登録\n\n【応募要件】\n- 香南市測量・建設コンサルタント等業務競争入札参加資格有資格者名簿の「測量一般」又は「道路」に登録されている者\n- 地方自治法施行令第167条の４の規定に該当しない者\n- 公告日から開札日までの間に香南市指名停止措置を受けていない者\n- 暴力団排除規則に該当しない者\n- 会社更生法・民事再生法の手続開始申立てがなされていない者\n- 高知県内に主たる営業所を置く者\n- 管理技術者及び照査技術者の配置：測量士、技術士（建設部門「道路」又は総合技術監理部門「建設-道路」）、建設コンサルタント登録者（登録部門「道路」）、RCCM（登録部門「道路」）のいずれかを配置可能な者\n- （ア）の要件を満たす者については、令和3年度以降に地方公共団体が発注した同種業務を元請として受注し、業務を完了した実績を有すること\n- 他の入札参加者との間に資本関係又は人的関係がないこと\n\n【工期・期間】\n令和8年9月11日～令和9年2月27日（170日間）\n履行期限：令和9年2月28日\n\n【入札スケジュール】\n- 入札資格確認申請受付：公告日から令和8年8月26日（水）まで（電子入札システム運用時間内：8時～22時）\n- 質疑受付：公告日から令和8年8月26日（水）17時まで（メール）\n- 入札期間：令和8年8月31日（月）～令和8年9月2日（水）まで（電子入札システム運用時間内）\n- 開札日時：令和8年9月3日（木）9時35分\n- 開札場所：香南市役所本庁舎4階契約管財課\n- 金入り設計書閲覧申請期間：令和8年9月3日（木）13時～令和8年9月4日（金）16時\n- 疑義申立期間：令和8年9月3日（木）13時～令和8年9月8日（火）13時\n- 資格審査提出期限：令和8年9月7日（月）16時まで",true,"(redacted)","kkj",[30],{"url":27,"name":27},false,[],[],{"id":6,"name":11,"categoryId":35,"parentId":15,"parentName":15,"bidInfoUrl":15},52,[37],{"year":38,"count":39},2026,18,{"sameOrganization":41,"samePrefecture":58,"similar":83},[42,45,48,51,54],{"id":43,"title":44,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},3634579,"(建第08054号)下井西(2)地区10号水路測量設計委託業務【8月19日公告】",{"id":46,"title":47,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},3634578,"(建第08067号)深渕北線1号橋外長寿命化補修設計委託業務【8月19日公告】",{"id":49,"title":50,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},3634577,"(建第08066号)平成橋外長寿命化補修設計委託業務【8月19日公告】",{"id":52,"title":53,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},3634576,"(建第08053号)下井西(1)地区12号道路他測量設計委託業務【8月19日公告】",{"id":55,"title":56,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":57,"budget":15,"status":16},3634575,"(水公第08004号)夜須北部クリーンセンター実施設計委託業務【8月19日公告】","2026-08-25T15:00:00.000Z",[59,65,69,72,78],{"id":60,"title":61,"organizationName":62,"prefectureName":12,"publishedDate":63,"deadlineDate":64,"budget":15,"status":16},3882606,"令和8年度 収穫調査業務委託(官行造林)","林野庁四国森林管理局安芸森林管理署","2026-08-23T15:00:00.000Z","2026-09-28T15:00:00.000Z",{"id":66,"title":67,"organizationName":12,"prefectureName":12,"publishedDate":63,"deadlineDate":68,"budget":15,"status":16},3882605,"上八川川 河川改修(魚道工)工事(河改 第6-11-1号)","2026-09-13T15:00:00.000Z",{"id":70,"title":71,"organizationName":12,"prefectureName":12,"publishedDate":63,"deadlineDate":68,"budget":15,"status":16},3882604,"中の谷川 河川改修工事(河改 第6-1-2号)",{"id":73,"title":74,"organizationName":75,"prefectureName":12,"publishedDate":76,"deadlineDate":77,"budget":15,"status":16},3747967,"令和8年度四万十森林管理署官用自動車点検等業務","林野庁四国森林管理局四万十森林管理署","2026-08-20T15:00:00.000Z","2026-09-24T15:00:00.000Z",{"id":79,"title":80,"organizationName":81,"prefectureName":12,"publishedDate":76,"deadlineDate":82,"budget":15,"status":16},3747966,"令和8年度燃料調達(単価契約)10月~3月期","林野庁四国森林管理局嶺北森林管理署","2026-09-06T15:00:00.000Z",[84,91,94,99,104],{"id":85,"title":86,"organizationName":87,"prefectureName":88,"publishedDate":63,"deadlineDate":89,"budget":90,"status":16},3882653,"08市建第25号市営久々野火葬場照明LED化改修工事","岐阜県高山市","岐阜県","2026-09-07T15:00:00.000Z",15015000,{"id":92,"title":93,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},3634571,"(建第08045号)市道坂目・宮ノ首線路側改修工事【R8.08.19公告】",{"id":95,"title":96,"organizationName":87,"prefectureName":88,"publishedDate":97,"deadlineDate":89,"budget":98,"status":16},3584665,"08市建第23号市道天性寺吹屋線融雪設備(電気設備)工事","2026-08-16T15:00:00.000Z",55573100,{"id":100,"title":101,"organizationName":87,"prefectureName":88,"publishedDate":97,"deadlineDate":102,"budget":103,"status":16},3584651,"08市建第24号市道天性寺吹屋線融雪設備(舗装)工事","2026-08-31T15:00:00.000Z",46609200,{"id":105,"title":106,"organizationName":107,"prefectureName":108,"publishedDate":109,"deadlineDate":15,"budget":15,"status":16},3417974,"2_08国建第44号・07国建第142号合併 道路改良工事(筒戸2工区)","茨城県つくばみらい市","茨城県","2026-08-06T15:00:00.000Z",[111,117,123,129],{"title":112,"link":113,"date":114,"thumb":115,"cat":116},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":118,"link":119,"date":120,"thumb":121,"cat":122},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":124,"link":125,"date":126,"thumb":127,"cat":128},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":130,"link":131,"date":132,"thumb":133,"cat":134},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]