[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-3633970":3,"bid-history-3633970":36,"bid-related-3633970":40,"union-latest":82},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":17,"bidCategoryName":18,"bidTypeName":19,"categoryText":20,"regionText":11,"deadlineTime":21,"openingDate":22,"qualificationText":23,"aiSummary":24,"aiSummaryGated":25,"aiSummaryTruncated":26,"sourceUrl":27,"dataSourceCode":28,"budgetTaxIncluded":15,"documentUrls":29,"businessExperience":31,"localOffice":26,"securityRequirement":31,"qualifications":32,"certifications":33,"organization":34},3633970,"(都)上石井岩井線舗装工事(8−1)",459,33,2,15,1,"岡山県岡山市","岡山県","2026-08-18T15:00:00.000Z","2026-09-03T15:00:00.000Z",null,"active","都市整備局道路部西部幹線道路建設課","舗装","一般競争入札","工事","16:00:00","2026-09-06T15:00:00.000Z","・市内全域で舗装の格付が特A又はA等級を有していること\n・舗装工事業について建設業法第3条第1項に基づき建設業の許可を受けていること\n・舗装工事業に係る資格を有する者を配置すること\n・オペレータ資格取得者を3人以上有していること\n・市内業者又は準市内業者(岡山市分の従業員50人以上、かつ特別徴収対象従業員50人以上)であること\n・同種工事施工実績は不要\n・雇用保険、健康保険及び厚生年金保険に加入していること\n・岡山市指名停止基準に基づく指名停止期間中でないこと\n・令第167条の4及び岡山市契約規則第2条第1項の規定に該当しないこと","【案件概要】\n岡山市が(都)上石井岩井線舗装工事(8−1)の一般競争入札を実施。岡山市北区寿町地内における舗装工事を対象とする。公告日は令和8年8月19日。開札日は令和8年9月7日(月)午前10時30分、岡山市役所本庁舎5階入札室で実施。最低制限価格設定案件であり、契約不適合責任期間は2年。\n\n【業務内容】\n- アスファルト舗装工 56㎡\n- ブロック舗装工","236㎡\n- 排水構造物工 一式\n- 縁石工 一式\n- 道路付属施設工 一式\n- 施工延長 62.8m\n\n【応募要件】\n- 市内全域で舗装の格付が特A又はA等級を有していること\n- 舗装工事業について建設業法第3条第1項の規定に基づき建設業の許可を受けていること\n- 舗装工事業に係る資格を有する者を配置すること\n- オペレータ資格取得者を3人以上有していること\n- 市内業者又は準市内業者(岡山市分の従業員50人以上、かつ特別徴収対象従業員50人以上)であること\n- 同種工事施工実績は不要\n- 雇用保険、健康保険及び厚生年金保険に加入していること\n- 岡山市指名停止基準に基づく指名停止期間中でないこと\n\n【工期・期間】\n設計図書等質問受付期間：公告日(令和8年8月26日(水)午後4時まで)から\n設計図書等回答掲載期間：令和8年8月28日(金)午後4時から開札日まで\n入札受付期間：令和8年9月2日(水)午後4時から令和8年9月4日(金)午後4時まで\n積算疑義申立期限：令和8年9月9日(水)午後4時まで\n参加資格確認申請書類受付期限：確認対象者となった日の2日後午後5時15分まで(市の休日を除く)\n契約不適合責任期間：2年",true,"(redacted)","kkj",[30],{"url":27,"name":27},false,[],[],{"id":6,"name":11,"categoryId":35,"parentId":15,"parentName":15,"bidInfoUrl":15},52,[37],{"year":38,"count":39},2026,394,{"sameOrganization":41,"samePrefecture":62,"similar":81},[42,48,51,55,59],{"id":43,"title":44,"organizationName":11,"prefectureName":12,"publishedDate":45,"deadlineDate":46,"budget":47,"status":16},3906561,"県道佐伯長船線道路改良工事(8-1)","2026-08-24T15:00:00.000Z","2026-09-13T15:00:00.000Z",36000000,{"id":49,"title":50,"organizationName":11,"prefectureName":12,"publishedDate":45,"deadlineDate":46,"budget":15,"status":16},3906560,"国道250号百間川橋東交差点改良工事(8-1)に伴う舗装工事",{"id":52,"title":53,"organizationName":11,"prefectureName":12,"publishedDate":54,"deadlineDate":14,"budget":15,"status":16},3689353,"家屋調査等業務委託(8−東2)","2026-08-19T15:00:00.000Z",{"id":56,"title":57,"organizationName":11,"prefectureName":12,"publishedDate":54,"deadlineDate":58,"budget":15,"status":16},3689352,"犬島し尿中継施設整備工事詳細設計業務委託","2026-09-02T15:00:00.000Z",{"id":60,"title":61,"organizationName":11,"prefectureName":12,"publishedDate":54,"deadlineDate":58,"budget":15,"status":16},3689351,"(主)岡山赤穂線補償算定業務委託(8−2)",[63,69,72,75,78],{"id":64,"title":65,"organizationName":66,"prefectureName":12,"publishedDate":67,"deadlineDate":68,"budget":15,"status":16},3919638,"令和8年度高梁川水系環境調査業務","国土交通省中国地方整備局","2026-08-25T15:00:00.000Z","2026-09-08T15:00:00.000Z",{"id":70,"title":71,"organizationName":66,"prefectureName":12,"publishedDate":67,"deadlineDate":14,"budget":15,"status":16},3918034,"令和8年度笠岡バイパス茂平地区第13改良工事",{"id":73,"title":74,"organizationName":66,"prefectureName":12,"publishedDate":67,"deadlineDate":14,"budget":15,"status":16},3918033,"令和8年度笠岡バイパス鋼管地区第8改良工事",{"id":76,"title":77,"organizationName":66,"prefectureName":12,"publishedDate":67,"deadlineDate":14,"budget":15,"status":16},3918032,"令和8年度笠岡バイパス鋼管地区第9改良工事",{"id":79,"title":80,"organizationName":66,"prefectureName":12,"publishedDate":67,"deadlineDate":14,"budget":15,"status":16},3918031,"令和8年度笠岡バイパス茂平地区第12改良工事",[],[83,89,95,101],{"title":84,"link":85,"date":86,"thumb":87,"cat":88},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":90,"link":91,"date":92,"thumb":93,"cat":94},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":96,"link":97,"date":98,"thumb":99,"cat":100},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":102,"link":103,"date":104,"thumb":105,"cat":106},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]