[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-3633927":3,"bid-history-3633927":48,"bid-related-3633927":52,"union-latest":120},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":17,"bidCategoryName":18,"bidTypeName":19,"categoryText":20,"regionText":11,"deadlineTime":21,"openingDate":22,"qualificationText":23,"aiSummary":24,"aiSummaryGated":25,"aiSummaryTruncated":26,"sourceUrl":27,"dataSourceCode":28,"budgetTaxIncluded":15,"documentUrls":29,"businessExperience":26,"localOffice":26,"securityRequirement":43,"qualifications":44,"certifications":45,"organization":46},3633927,"(高潮第1-2号)吉川漁港海岸高潮対策工事(鋼矢板圧入)【8月19日公告】",106,39,2,14,1,"高知県香南市","高知県","2026-08-18T15:00:00.000Z","2026-09-15T15:00:00.000Z",null,"active","香南市契約管財課","土木","一般競争入札","工事","22:00:00","2026-09-16T15:00:00.000Z","・香南市内に主たる営業所を置き、土木一式工事のランクがA又はB等級である者\n・令和8年度香南市建設工事競争入札参加資格有資格者名簿に登載されている者\n・土木一式工事の主任技術者となり得る国家資格等を有し、入札参加資格確認申請の日以前に申請者に採用されている者で、採用から申請日以前3ヶ月以上ある者\n・地方自治法施行令第167条の4に該当しない者\n・公告日から開札日までの間に香南市指名停止措置を受けていない者\n・香南市の暴力団排除に関する規則の排除措置対象者に該当しない者\n・会社更生法又は民事再生法に基づく手続開始申立てを受けていない者（ただし決定後に再審査を受けた場合を除く）\n・他の入札参加者との間に資本関係又は人的関係がない者\n・現場に常駐する現場代理人及び主任技術者を適切に配置できる者","【案件概要】\n香南市が吉川漁港海岸高潮対策工事（鋼矢板圧入）の制限付一般競争入札を実施する。施工延長41.0m、高知県香南市吉川町吉原を対象地域とし、令和8年8月19日に公告。予定工期は令和9年3月10日までで、予定価格の10分の7.5から10分の9.2の範囲で設定（事後公表）。週休2日制工事の適用対象であり、電子入札により実施される。\n\n【業務内容】\n- ","鋼矢板圧入工（SP-ⅥL L=16m、29枚）\n- 鋼矢板打込工（SP-Ⅱw L=3.5m、22枚）\n- 被覆ブロック製作（75個）\n- 被覆ブロック据付（75個）\n- 擁壁工（場所打ち式）一式\n- 土工（床掘り、盛土、法面整形等）\n- コンクリート基礎工・舗装工・構造物撤去工\n- 交通誘導警備員配置（63人）\n\n【応募要件】\n- 香南市内に主たる営業所を置き、土木一式工事のランクがA又はB等級である者\n- 令和8年度香南市建設工事競争入札参加資格有資格者名簿に登載されている者\n- 土木一式工事の主任技術者となり得る国家資格等を有する者で、入札参加資格確認申請の日以前に申請者に採用されている者（雇用期間が3ヶ月以上）\n- 地方自治法施行令第167条の4に該当しない者\n- 公告日から開札日までの間に香南市指名停止措置の対象となっていない者\n- 香南市の暴力団排除に関する規則に基づく排除措置対象者に該当しない者\n- 会社更生法又は民事再生法に基づく手続開始申立てを受けていない者（ただし手続開始決定後に再審査を受けた場合を除く）\n- 他の入札参加者との間に資本関係又は人的関係がない者\n- 現場代理人及び主任技術者を適切に配置できる者\n\n【工期・期間】\n契約締結日から令和9年3月10日まで。入札参加資格確認申請の受付期間は公告日から令和8年9月2日（水）17時まで。入札期間は令和8年9月14日（月）から令和8年9月16日（水）まで。開札日は令和8年9月17日（木）9時20分。疑義申立期間は令和8年9月17日（木）13時から令和8年9月18日（金）16時まで（土日祝除く）。金入り設計書閲覧期間は令和8年9月17日（木）13時から令和8年9月25日（金）13時まで（土日祝除く）。",true,"(redacted)","kkj",[30,31,32,33,34,35,36,37,38,39,40,41,42],{"url":27,"name":27},{"url":27,"name":27},{"url":27,"name":27},{"url":27,"name":27},{"url":27,"name":27},{"url":27,"name":27},{"url":27,"name":27},{"url":27,"name":27},{"url":27,"name":27},{"url":27,"name":27},{"url":27,"name":27},{"url":27,"name":27},{"url":27,"name":27},false,[],[],{"id":6,"name":11,"categoryId":47,"parentId":15,"parentName":15,"bidInfoUrl":15},52,[49],{"year":50,"count":51},2026,46,{"sameOrganization":53,"samePrefecture":71,"similar":91},[54,58,62,65,68],{"id":55,"title":56,"organizationName":11,"prefectureName":12,"publishedDate":57,"deadlineDate":14,"budget":15,"status":16},3906644,"(上水第08036号)第1水源配水池更新工事【8月19日公告】","2026-08-23T15:00:00.000Z",{"id":59,"title":60,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":61,"budget":15,"status":16},3634579,"(建第08054号)下井西(2)地区10号水路測量設計委託業務【8月19日公告】","2026-09-01T15:00:00.000Z",{"id":63,"title":64,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":61,"budget":15,"status":16},3634578,"(建第08067号)深渕北線1号橋外長寿命化補修設計委託業務【8月19日公告】",{"id":66,"title":67,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":61,"budget":15,"status":16},3634577,"(建第08066号)平成橋外長寿命化補修設計委託業務【8月19日公告】",{"id":69,"title":70,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":61,"budget":15,"status":16},3634576,"(建第08053号)下井西(1)地区12号道路他測量設計委託業務【8月19日公告】",[72,76,80,85,88],{"id":73,"title":74,"organizationName":12,"prefectureName":12,"publishedDate":75,"deadlineDate":61,"budget":15,"status":16},3906646,"高知港海岸(桟橋通地区)高潮対策工事(港高潮(広域)第6-21号)","2026-08-24T15:00:00.000Z",{"id":77,"title":78,"organizationName":12,"prefectureName":12,"publishedDate":75,"deadlineDate":79,"budget":15,"status":16},3906645,"高知港維持修繕工事(港維(緊自)第06-1-2号)","2026-09-13T15:00:00.000Z",{"id":81,"title":82,"organizationName":83,"prefectureName":12,"publishedDate":57,"deadlineDate":84,"budget":15,"status":16},3906643,"春野町6号線道路改良工事(その2)","高知県高知市","2026-09-07T15:00:00.000Z",{"id":86,"title":87,"organizationName":83,"prefectureName":12,"publishedDate":57,"deadlineDate":84,"budget":15,"status":16},3906642,"北本町三丁目非耐震性防火水槽撤去工事",{"id":89,"title":90,"organizationName":83,"prefectureName":12,"publishedDate":57,"deadlineDate":84,"budget":15,"status":16},3906641,"大津乙字下ノ町水路整備工事",[92,98,102,110,115],{"id":93,"title":94,"organizationName":95,"prefectureName":96,"publishedDate":97,"deadlineDate":15,"budget":15,"status":16},3239079,"河川高潮第7322-0-001号 (二)千種川水系 千種川 堤防 改修工事(その7)","兵庫県 西播磨県民局 本局(総務防災課 - 土木・まちづくり)","兵庫県","2026-08-03T15:00:00.000Z",{"id":99,"title":100,"organizationName":95,"prefectureName":96,"publishedDate":97,"deadlineDate":101,"budget":15,"status":16},3239075,"河川高潮第7323-0-002号 (二)千種川水系 加里屋川 柳 橋 橋梁下部工事(その2)","2026-09-06T15:00:00.000Z",{"id":103,"title":104,"organizationName":105,"prefectureName":106,"publishedDate":107,"deadlineDate":108,"budget":109,"status":16},3057825,"(電子契約対象)【情報共有・週休2日・快適トイレ】07国補高潮第07-06-428-A-008号 日川海岸ブロック製作・据付工事","茨城県 土木部 鹿島港湾事務所","茨城県","2026-07-27T15:00:00.000Z","2026-08-26T15:00:00.000Z",53350000,{"id":111,"title":112,"organizationName":12,"prefectureName":12,"publishedDate":113,"deadlineDate":57,"budget":15,"status":114},2943852,"宿毛湾港海岸高潮対策工事(港高潮第19-10号)(令和8年7月27日公告)","2026-07-26T15:00:00.000Z","closed",{"id":116,"title":117,"organizationName":12,"prefectureName":12,"publishedDate":118,"deadlineDate":119,"budget":15,"status":114},2586732,"宇佐漁港海岸(塩浜地区) 高潮対策実施設計委託業務(漁高潮第26-8-1号)","2026-07-16T15:00:00.000Z","2026-08-16T15:00:00.000Z",[121,127,133,139],{"title":122,"link":123,"date":124,"thumb":125,"cat":126},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":128,"link":129,"date":130,"thumb":131,"cat":132},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":134,"link":135,"date":136,"thumb":137,"cat":138},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":140,"link":141,"date":142,"thumb":143,"cat":144},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]