[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-3591965":3,"bid-history-3591965":38,"bid-related-3591965":41,"union-latest":114},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":17,"bidCategoryName":18,"bidTypeName":19,"categoryText":20,"regionText":21,"deadlineTime":22,"openingDate":23,"qualificationText":24,"aiSummary":25,"aiSummaryGated":26,"aiSummaryTruncated":27,"sourceUrl":28,"dataSourceCode":29,"budgetTaxIncluded":15,"documentUrls":30,"businessExperience":27,"localOffice":32,"securityRequirement":32,"qualifications":33,"certifications":35,"organization":36},3591965,"役務の提供等",167,23,8,44,1,"農林水産省東海農政局","愛知県","2026-08-17T15:00:00.000Z","2026-09-01T15:00:00.000Z",null,"active","農林水産省東海農政局土地改良技術事務所","建物管理","一般競争入札","役務の提供等、建物管理等各種保守管理、電気機械設備運転保守外管理業務","愛知県名古屋市","12:00:00","2026-09-16T15:00:00.000Z","・令和07・08・09年度全省庁統一資格「役務の提供等」の「建物管理等各種保守管理」においてA～Dいずれかの等級で東海・北陸地域の競争参加有資格者であること\n・予算決算及び会計令第70条の規定に該当しない者であること\n・予算決算及び会計令第71条の規定に該当しない者であること\n・会社更生法又は民事再生法に基づく手続開始申立てがなされている者でないこと\n・東海農政局指名停止措置要領に基づく指名停止期間中でないこと\n・管理責任者は電気設備及び機械設備の保守管理業務並びに建築物環境衛生管理業務について3年以上の実務経験を有すること\n・技術員2名を常駐させ、うち1名は第三種電気主任技術者以上及び建築物環境衛生管理技術者の資格を有すること\n・他の1名は電気設備又は機械設備の保守・保安・設計施工監理もしくは運転の経験を有すること\n・代替要員も同等の資格・経験を有すること\n・管理責任者及び使用人は競争参加資格証明書と同一の者であること\n・入札説明書6(1)に示す書類を提出できること","【案件概要】\n農林水産省東海農政局土地改良技術事務所が、愛知県名古屋市中区三の丸所在の東海農政局三の丸庁舎における電気機械設備運転保守外管理業務の一般競争入札を実施する。履行期間は令和8年10月1日から令和9年3月31日までの6か月間。対象庁舎は地上4階地下1階、延床面積約1万平方メートルの特定建築物であり、電気事業法及びビル管理法に基づく法定管理業務を含む","包括的な設備管理を委託する。入札公告日は令和8年8月18日、入札説明書交付期間は同日9時から9月2日12時まで、開札日は9月17日10時。電子調達システムを利用した入札を原則とするが、紙入札方式にも対応可能。\n\n【業務内容】\n- 電気機械設備（受変電設備、非常用発電装置、配電盤、バッテリー設備等）の運転・保守・日常巡視点検\n- 空調設備（空気調和装置12系統、真空式温水発生機、冷温水循環装置、ファンコイルユニット等）の運転管理・点検整備\n- 給排水衛生設備（受水槽、高架水槽、揚水ポンプ、汚水槽、消火用ポンプ等）の保守点検\n- 建築物環境衛生管理業務（空気環境測定隔月1回、遊離残留塩素測定週1回、飲料水水質検査、貯水槽清掃年1回、ねずみ等害虫駆除等）\n- 真空式温水発生機（タクマ製GFL-800BN）の暖房開始前整備保守作業（10月下旬～11月上旬）\n- 消防設備外観点検月1回及び法定点検立会\n- 予備発電装置の月次試運転及び監視\n- 電気主任技術者（第三種以上）及び建築物環境衛生管理技術者の常駐配置による法令遵守体制の構築\n- 各種設備の運転日報・点検記録の作成及び監督職員への報告\n- 異常事態発生時の緊急対応・応急処置及び事故報告書作成\n- エレベーター（NO.2機能維持のため毎週金曜夜間NO.1を休止）の運用管理\n\n【応募要件】\n- 令和07・08・09年度全省庁統一資格「役務の提供等」の「建物管理等各種保守管理」においてA～Dいずれかの等級で東海・北陸地域の競争参加有資格者であること\n- 予算決算及び会計令第70条及び第71条の規定に該当しないこと\n- 会社更生法又は民事再生法に基づく手続開始申立てがなされている者でないこと\n- 東海農政局指名停止措置要領に基づく指名停止期間中でないこと\n- 管理責任者は電気設備及び機械設備の保守管理業務並びに建築物環境衛生管理業務について3年以上の実務経験を有すること\n- 技術員2名を常駐させ、うち1名は第三種電気主任技術者以上及び建築物環境衛生管理技術者の資格を有すること\n- 他の1名は電気設備又は機械設備の保守・保安・設計施工監理もしくは運転の経験を有すること\n- 代替要員も同等の資格・経験を有すること\n- 管理責任者及び使用人は競争参加資格証明書と同一の者であること\n- 入札説明書6(1)に示す書類を提出できること\n\n【工期・期間】\n履行期間：令和8年10月1日から令和9年3月31日まで\n\n作業日時：\n通常管理期間（10月1日～11月30日）：技術員1名8:00～16:30（実働7.5時間）、1名9:00～17:30（実働7.5時間）、休日を除く毎日\n暖房実施期間（12月1日～3月31日）：技術員1名7:30～16:30（実働8時間）、1名9:00～18:30（実働8.5時間）、休日を除く毎日\n休日勤務：4人日（電気機械設備保守点検等で必要な場合）8:00～17:00（実働8時間）\n緊急時勤務：発注者から要請があった場合は受注者として対応\n\n証明書等提出期限：令和8年9月2日12時00分\n入札書受付期間（電子）：令和8年9月14日9時00分～9月16日17時00分\n開札日時：令和8年9月17日10時00分",true,"(redacted)","kkj",[31],{"url":28,"name":28},false,[34],2,[],{"id":6,"name":11,"categoryId":37,"parentId":15,"parentName":15,"bidInfoUrl":15},141,[39],{"year":40,"count":8},2026,{"sameOrganization":42,"samePrefecture":67,"similar":89},[43,49,53,58,62],{"id":44,"title":45,"organizationName":11,"prefectureName":46,"publishedDate":47,"deadlineDate":48,"budget":15,"status":16},3919621,"新濃尾(二期)地区 新濃尾事業誌収集・構成検討業務","岐阜県","2026-08-25T15:00:00.000Z","2026-09-06T15:00:00.000Z",{"id":50,"title":51,"organizationName":11,"prefectureName":12,"publishedDate":47,"deadlineDate":52,"budget":15,"status":16},3919620,"新濃尾(二期)地区 新木津用水路付帯施設等補足設計業務","2026-10-22T15:00:00.000Z",{"id":54,"title":55,"organizationName":11,"prefectureName":46,"publishedDate":56,"deadlineDate":57,"budget":15,"status":16},3575431,"令和8年度 頭首工健全性評価資料作成業務","2026-08-06T15:00:00.000Z","2026-10-05T15:00:00.000Z",{"id":59,"title":60,"organizationName":11,"prefectureName":12,"publishedDate":56,"deadlineDate":61,"budget":15,"status":16},3418183,"物品の販売","2026-09-10T15:00:00.000Z",{"id":63,"title":64,"organizationName":11,"prefectureName":12,"publishedDate":65,"deadlineDate":66,"budget":15,"status":16},3577595,"新濃尾(二期)地区 事業成績書基礎資料作成等業務","2026-08-05T15:00:00.000Z","2026-09-28T15:00:00.000Z",[68,74,78,82,86],{"id":69,"title":70,"organizationName":71,"prefectureName":12,"publishedDate":72,"deadlineDate":73,"budget":15,"status":16},3906794,"20260825.pdf","国立研究開発法人国立長寿医療研究センター","2026-08-24T15:00:00.000Z","2026-09-08T15:00:00.000Z",{"id":75,"title":76,"organizationName":77,"prefectureName":12,"publishedDate":72,"deadlineDate":23,"budget":15,"status":16},3906790,"令和8年度 長島ダム光線路測定装置購入一式","国土交通省中部地方整備局",{"id":79,"title":80,"organizationName":81,"prefectureName":12,"publishedDate":72,"deadlineDate":48,"budget":15,"status":16},3906760,"令和8年度 車載用通信機器搭載等作業","国家公安委員会(警察庁)中部管区警察局",{"id":83,"title":84,"organizationName":77,"prefectureName":12,"publishedDate":72,"deadlineDate":85,"budget":15,"status":16},3885171,"令和8年度 蒲郡BP道路設計業務","2026-09-07T15:00:00.000Z",{"id":87,"title":88,"organizationName":77,"prefectureName":12,"publishedDate":72,"deadlineDate":85,"budget":15,"status":16},3885170,"令和8年度 茶ノ木根橋詳細設計業務",[90,96,102,107,110],{"id":91,"title":92,"organizationName":93,"prefectureName":94,"publishedDate":72,"deadlineDate":95,"budget":15,"status":16},3906722,"防衛大学校共同利用電子計算機システムのセキュリティ調査役務","防衛省","神奈川県","2026-09-27T15:00:00.000Z",{"id":97,"title":98,"organizationName":93,"prefectureName":99,"publishedDate":100,"deadlineDate":101,"budget":15,"status":16},3882688,"NATOStratComCOE教育(招へい)に係る支援役務","東京都","2026-08-23T15:00:00.000Z","2026-09-29T15:00:00.000Z",{"id":103,"title":104,"organizationName":93,"prefectureName":99,"publishedDate":105,"deadlineDate":106,"budget":15,"status":16},3745622,"紙媒体の行政文書の電子媒体化役務(その2)","2026-08-20T15:00:00.000Z","2026-09-30T15:00:00.000Z",{"id":108,"title":109,"organizationName":93,"prefectureName":99,"publishedDate":105,"deadlineDate":15,"budget":15,"status":16},3745611,"ネットワーク管理装置用ソフトウェアの適合化及びデータ移行等役務",{"id":111,"title":112,"organizationName":93,"prefectureName":99,"publishedDate":113,"deadlineDate":15,"budget":15,"status":16},3690471,"既存伝送路の最適化整備に関する役務","2026-08-19T15:00:00.000Z",[115,121,127,133],{"title":116,"link":117,"date":118,"thumb":119,"cat":120},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":122,"link":123,"date":124,"thumb":125,"cat":126},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":128,"link":129,"date":130,"thumb":131,"cat":132},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":134,"link":135,"date":136,"thumb":137,"cat":138},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]