[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-3590210":3,"bid-history-3590210":41,"bid-related-3590210":45,"union-latest":119},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":17,"bidCategoryName":18,"bidTypeName":19,"categoryText":20,"regionText":21,"deadlineTime":22,"openingDate":14,"qualificationText":23,"aiSummary":24,"aiSummaryGated":25,"aiSummaryTruncated":26,"sourceUrl":27,"dataSourceCode":28,"budgetTaxIncluded":15,"documentUrls":29,"businessExperience":26,"localOffice":26,"securityRequirement":35,"qualifications":36,"certifications":38,"organization":39},3590210,"令和8年度皇居外苑和田倉休憩所トイレ塗装等改修工事(再度公告)",1404,13,2,18,1,"環境省皇居外苑","東京都","2026-08-17T15:00:00.000Z","2026-09-13T15:00:00.000Z",null,"active","環境省自然環境局皇居外苑管理事務所","塗装","一般競争入札","工事","東京都千代田区","10:00:00","・予算決算及び会計令第70条及び第71条の規定に該当しないこと\n・開札時までに環境省における令和7・8年度一般競争参加資格者で建築工事のA、B、C又はD等級の認定を受けていること\n・東京都内に建設業法に基づく建築工事、屋根工事、塗装工事、防水工事、建具工事のすべての許可を受けた本店・支店及び営業所のいずれかを有すること\n・会社更生法又は民事再生法に基づき手続開始の申立てがなされていないこと\n・平成23年度以降に元請けとして完成した工事で、国民公園、国及び地方公共団体における建築工事であり、建築工事における取組で温室効果ガス排出削減を目的とした同一工事の施工実績を有すること（環境省発注工事は評定点合計65点以上）\n・1級建築施工管理技士又はこれと同等以上の資格を有する主任技術者又は監理技術者を配置できること\n・配置予定技術者が平成23年度以降に元請けとして完成した同要件の工事の施工経験を有すること（環境省発注工事は評定点合計65点以上）\n・監理技術者資格者証及び監理技術者講習修了証を保有していること（監理技術者の場合）\n・配置予定の監理技術者等との直接的かつ恒常的な雇用関係が必要（入札申込み日以前に3ヶ月以上）\n・競争参加資格確認申請書及び資料提出期限日から開札時までに指名停止措置を受けていないこと\n・設計業務等の受託者又は関連企業でないこと\n・入札に参加する者間に資本関係又は人的関係がないこと\n・警察当局から暴力団排除要請を受けていないこと\n・提出施工計画が適正であること\n・健康保険法、厚生年金保険法、雇用保険法の届出義務を履行していること（該当する場合）","【案件概要】\n環境省皇居外苑管理事務所が実施する令和8年度皇居外苑和田倉休憩所トイレ塗装等改修工事（再度公告）の一般競争入札。総合評価落札方式（施工能力評価型Ⅰ型）により、価格以外の要素と価格を総合的に評価して落札者を決定する。対象地域は東京都千代田区皇居外苑3-1和田倉噴水公園。予算規模は公告では明記されていない。スケジュール概要として、資料受付期間は令和","8年8月28日（金）17時00分まで、入札書受付期限は令和8年9月14日（月）で開札も同日11時00分に実施される。\n\n【業務内容】\n- 鉄筋コンクリート造一部木造平屋建築物（建築面積86.25㎡、延床面積86.25㎡）のトイレ塗装等改修工事\n- 仮設工事\n- 防水工事\n- 建具塗装工事\n- 屋根塗装工事\n- 撤去工事\n- 分別解体等及び特定建設資材廃棄物の再資源化等の実施が義務付けられた工事\n- 温室効果ガス排出削減を目的とした工事\n\n【応募要件】\n・開札時までに環境省における令和7・8年度一般競争参加資格者で建築工事のA、B、C又はD等級の認定を受けていること\n・東京都内に建設業法に基づく建築工事、屋根工事、塗装工事、防水工事、建具工事のすべての許可を受けた本店・支店及び営業所のいずれかを有すること\n・平成23年度以降に元請けとして完成した工事で、国民公園、国及び地方公共団体における建築工事かつ温室効果ガス排出削減を目的とした同一工事の施工実績を有すること（環境省発注の場合は評定点合計65点以上）\n・1級建築施工管理技士又はこれと同等以上の資格を有する主任技術者又は監理技術者を配置可能なこと\n・配置予定技術者は平成23年度以降に元請けとして完成した同要件の工事の施工経験を有すること（環境省発注の場合は評定点合計65点以上）\n・監理技術者の場合は監理技術者資格者証及び講習修了証を保有していること\n・配置予定の監理技術者等との直接的かつ恒常的な雇用関係（入札申込み日以前に3ヶ月以上）を明示する資料を保有していること\n・健康保険法、厚生年金保険法、雇用保険法の届出義務を履行していること\n・暴力団排除に関する誓約事項に誓約すること\n・入札に参加する者間に資本関係又は人的関係がないこと\n\n【工期・期間】\n契約締結日の翌日から令和9年3月15日（金）まで",true,"(redacted)","kkj",[30,31,32,33,34],{"url":27,"name":27},{"url":27,"name":27},{"url":27,"name":27},{"url":27,"name":27},{"url":27,"name":27},false,[37],3,[],{"id":6,"name":11,"categoryId":40,"parentId":15,"parentName":15,"bidInfoUrl":15},20,[42],{"year":43,"count":44},2026,8,{"sameOrganization":46,"samePrefecture":73,"similar":99},[47,52,57,63,68],{"id":48,"title":49,"organizationName":11,"prefectureName":12,"publishedDate":50,"deadlineDate":51,"budget":15,"status":16},3690437,"令和8年度皇居外苑清水濠雁木坂石垣復旧工事","2026-08-19T15:00:00.000Z","2026-09-09T15:00:00.000Z",{"id":53,"title":54,"organizationName":11,"prefectureName":12,"publishedDate":55,"deadlineDate":56,"budget":15,"status":16},2820687,"令和8年度皇居外苑和田倉休憩所トイレ塗装等改修工事","2026-07-23T15:00:00.000Z","2026-09-01T15:00:00.000Z",{"id":58,"title":59,"organizationName":11,"prefectureName":12,"publishedDate":60,"deadlineDate":61,"budget":15,"status":62},1920092,"令和8年度皇居外苑清水濠及び牛ヶ淵景観改善工事","2026-06-28T15:00:00.000Z","2026-07-08T15:00:00.000Z","closed",{"id":64,"title":65,"organizationName":11,"prefectureName":12,"publishedDate":66,"deadlineDate":67,"budget":15,"status":62},1727690,"令和8年度皇居外苑浄化施設撹拌機改修工事","2026-06-23T15:00:00.000Z","2026-07-12T15:00:00.000Z",{"id":69,"title":70,"organizationName":11,"prefectureName":12,"publishedDate":71,"deadlineDate":72,"budget":15,"status":62},1700445,"令和8年度皇居外苑桜田濠堤塘補強工事","2026-06-22T15:00:00.000Z","2026-07-13T15:00:00.000Z",[74,80,85,90,94],{"id":75,"title":76,"organizationName":77,"prefectureName":12,"publishedDate":78,"deadlineDate":79,"budget":15,"status":16},3885161,"R8東京国道管内電線共同溝調査設計等業務","国土交通省関東地方整備局","2026-08-24T15:00:00.000Z","2026-09-03T15:00:00.000Z",{"id":81,"title":82,"organizationName":83,"prefectureName":12,"publishedDate":84,"deadlineDate":14,"budget":15,"status":16},3883326,"令和8年度白衣・看護衣等調達契約(柏)一式","国立研究開発法人国立がん研究センター","2026-08-23T15:00:00.000Z",{"id":86,"title":87,"organizationName":88,"prefectureName":12,"publishedDate":84,"deadlineDate":89,"budget":15,"status":16},3882839,"馬主役員室バルコニーで用いる応接セットの調達","日本中央競馬会","2026-09-23T15:00:00.000Z",{"id":91,"title":92,"organizationName":93,"prefectureName":12,"publishedDate":84,"deadlineDate":14,"budget":15,"status":16},3882835,"原子時計用65nmプロセス試作チップ・評価ボード 製造・加工・実装 一式","国立大学法人東京工業大学",{"id":95,"title":96,"organizationName":97,"prefectureName":12,"publishedDate":84,"deadlineDate":98,"budget":15,"status":16},3882804,"高周波・高耐圧デバイスモデリング評価システム","国立研究開発法人産業技術総合研究所","2026-10-12T15:00:00.000Z",[100,105,110,113,116],{"id":101,"title":102,"organizationName":103,"prefectureName":104,"publishedDate":78,"deadlineDate":14,"budget":15,"status":16},3892009,"令和8年度漁業調査指導船「いばらき丸」点検整備工事(水産試験場)","茨城県 農林水産部 水産試験場","茨城県",{"id":106,"title":107,"organizationName":108,"prefectureName":109,"publishedDate":78,"deadlineDate":15,"budget":15,"status":16},3887870,"令和8年度 配水管布設替工事(その2)","宮代町 企画財政課 企画財政室","埼玉県",{"id":111,"title":112,"organizationName":108,"prefectureName":109,"publishedDate":78,"deadlineDate":15,"budget":15,"status":16},3887869,"令和8年度 宮代第5号汚水幹線・枝線布設替工事",{"id":114,"title":115,"organizationName":108,"prefectureName":109,"publishedDate":78,"deadlineDate":15,"budget":15,"status":16},3887868,"令和8年度 舗装復旧工事(その3)",{"id":117,"title":118,"organizationName":108,"prefectureName":109,"publishedDate":78,"deadlineDate":15,"budget":15,"status":16},3887867,"令和8年度 舗装復旧工事(その4)",[120,126,132,138],{"title":121,"link":122,"date":123,"thumb":124,"cat":125},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":127,"link":128,"date":129,"thumb":130,"cat":131},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":133,"link":134,"date":135,"thumb":136,"cat":137},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":139,"link":140,"date":141,"thumb":142,"cat":143},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]