[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-3584669":3,"bid-history-3584669":37,"bid-related-3584669":41,"union-latest":105},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":17,"bidCategoryName":18,"bidTypeName":19,"categoryText":20,"regionText":11,"deadlineTime":21,"openingDate":22,"qualificationText":23,"aiSummary":24,"aiSummaryGated":25,"aiSummaryTruncated":26,"sourceUrl":27,"dataSourceCode":28,"budgetTaxIncluded":26,"documentUrls":29,"businessExperience":26,"localOffice":26,"securityRequirement":31,"qualifications":32,"certifications":33,"organization":34},3584669,"08建設第57号市道大原8号線(庄島橋)橋りょう長寿命化改良工事",864,21,2,16,1,"岐阜県高山市","岐阜県","2026-08-16T15:00:00.000Z","2026-09-07T15:00:00.000Z",53161900,"active","高山市契約管財課","橋梁","一般競争入札","工事","16:00:00","2026-09-08T15:00:00.000Z","・地方自治法施行令第167条の4の規定に該当しないこと\n・高山市競争入札参加資格者名簿の「土木一式」において市内に本店、支店又は営業所等で登録されていること\n・本店以外を開設した場合は、法人設立（開設）申告書受理から3年以上の支店又は営業所等の形態及び営業実績があること\n・公告日から落札決定日までの間に指名停止措置を受けていないこと\n・この工事の設計業務受託者（㈱三進高山支店）及び当該受託者と資本若しくは人事面で関連がある業者でないこと\n・健康保険法第48条、厚生年金保険法第27条、雇用保険法第7条に定める届出義務を履行していること\n・高山市税・高山市公共料金について未納がないこと\n・土木工事業に関する主任（監理）技術者を配置できること\n・公告日から過去6ヵ月間に高山市発注の建設工事で「65点未満の工事成績評定」又は「不合格通知」を受けていないこと（検査日基準）\n・土木工事業に係る建設業法第27条の23に定める経営事項審査を受けていること\n・経営事項審査結果で「土木一式工事」の総合評定値が820点以上であり、かつ年間平均完成工事高があること\n・一般競争入札で高山市が発注した「土木一式工事」の手持ち工事件数が1件以内（高山市発注で過去3年度中の工事成績評定点平均が78点以上の場合は2件以内）","【案件概要】\n高山市が市道大原8号線の庄島橋橋りょう長寿命化改良工事について、条件付き一般競争入札（事後審査方式）を実施。対象地域は高山市清見町大原地内。予定価格は53,161,900円（税込）。総合評価落札方式による入札で、標準点100点に最大20点の加算点を加えた評価値で落札者を決定。低入札調査基準価格及び低入札失格基準価格が設定されている。\n\n【業務内","容】\n- 庄島橋（橋長L=30.8ｍ、幅員W=3.6ｍ）の橋梁補修工\n- RC沓座拡幅工（4箇所）、鋼材補修工、塗装塗替工（158㎡）\n- 素地調整工（159㎡、PCB対応循環式ブラスト工法）\n- 橋面舗装工（92㎡）、擦付舗装工（32㎡）\n- 防護柵補修工、排水管補修工（8箇所）、地覆補修工\n- 水切り設置工、伸縮装置取替工、断面補修工、ひび割れ補修工\n- 支承補修工、沓座モルタル補修工、仮設工、撤去処分工\n\n【応募要件】\n- 高山市競争入札参加資格者名簿の「土木一式」において市内に本店、支店又は営業所等で登録されていること\n- 本店以外を開設した場合は、法人設立申告書受理から3年以上の支店又は営業所の形態及び営業実績があること\n- 公告日から落札決定日までの間に高山市建設工事請負契約に係る指名停止を受けていないこと\n- 設計業務受託者（㈱三進　高山支店）及び当該受託者と資本又は人事面で関連がある業者でないこと\n- 健康保険法、厚生年金保険法、雇用保険法に定める届出義務を履行していること\n- 高山市税・公共料金について未納がないこと\n- 土木工事業に関する主任（監理）技術者を配置できること\n- 公告日から過去6ヵ月間に高山市発注の建設工事で「65点未満の工事成績評定」又は「不合格通知」を受けていないこと\n- 土木工事業に係る経営事項審査を受けていること\n- 経営事項審査結果で「土木一式工事」の総合評定値が820点以上かつ年間平均完成工事高があること\n- 高山市発注の「土木一式工事」の手持ち工事件数が1件以内（過去3年の工事成績評定点平均78点以上の場合は2件以内）\n\n【工期・期間】\n起工日：令和8年9月15日、竣工日：令和9年3月26日（193日間）\n工期：契約締結の日～令和9年3月26日\n完全週休2日制（土日）を原則とした工事実施",true,"(redacted)","kkj",[30],{"url":27,"name":27},false,[],[],{"id":6,"name":11,"categoryId":35,"parentId":36,"parentName":36,"bidInfoUrl":36},52,null,[38],{"year":39,"count":40},2026,73,{"sameOrganization":42,"samePrefecture":65,"similar":86},[43,48,52,56,61],{"id":44,"title":45,"organizationName":11,"prefectureName":12,"publishedDate":46,"deadlineDate":14,"budget":47,"status":16},3882655,"08荘支第37号桜香の湯 空調冷温水機更新工事","2026-08-23T15:00:00.000Z",44781000,{"id":49,"title":50,"organizationName":11,"prefectureName":12,"publishedDate":46,"deadlineDate":14,"budget":51,"status":16},3882654,"08市ス第85号国府B&G・清見B&Gプール照明LED改修工事",23232000,{"id":53,"title":54,"organizationName":11,"prefectureName":12,"publishedDate":46,"deadlineDate":14,"budget":55,"status":16},3882653,"08市建第25号市営久々野火葬場照明LED化改修工事",15015000,{"id":57,"title":58,"organizationName":11,"prefectureName":12,"publishedDate":46,"deadlineDate":59,"budget":60,"status":16},3882652,"08市ス第91号学校グラウンド照明LED化工事","2026-09-14T15:00:00.000Z",94083000,{"id":62,"title":63,"organizationName":11,"prefectureName":12,"publishedDate":46,"deadlineDate":14,"budget":64,"status":16},3882651,"08消総第75号国府支団1−2広瀬班団車庫新築工事",40282000,[66,71,75,79,83],{"id":67,"title":68,"organizationName":12,"prefectureName":12,"publishedDate":69,"deadlineDate":70,"budget":36,"status":16},3886562,"県単 道路新設改良(一般分) 道路詳細設計 委託","2026-08-24T15:00:00.000Z","2026-08-31T15:00:00.000Z",{"id":72,"title":73,"organizationName":12,"prefectureName":12,"publishedDate":69,"deadlineDate":74,"budget":36,"status":16},3886560,"公共 砂防メンテナンス事業(債務)クレ石谷(松尾谷)堰堤補修工事","2026-08-30T15:00:00.000Z",{"id":76,"title":77,"organizationName":78,"prefectureName":12,"publishedDate":69,"deadlineDate":14,"budget":36,"status":16},3885174,"令和8年度 156号岩田坂歩道整備用地調査業務","国土交通省中部地方整備局",{"id":80,"title":81,"organizationName":78,"prefectureName":12,"publishedDate":69,"deadlineDate":82,"budget":36,"status":16},3885173,"令和8年度 東海環状事業計画検討業務","2026-09-23T15:00:00.000Z",{"id":84,"title":85,"organizationName":78,"prefectureName":12,"publishedDate":69,"deadlineDate":59,"budget":36,"status":16},3885168,"令和8年度 岐阜国道事務所管内積算技術業務",[87,92,96,99,102],{"id":88,"title":89,"organizationName":90,"prefectureName":91,"publishedDate":69,"deadlineDate":36,"budget":36,"status":16},3887866,"町道第1381号線道路整備工事","宮代町 企画財政課 企画財政室","埼玉県",{"id":93,"title":94,"organizationName":95,"prefectureName":91,"publishedDate":69,"deadlineDate":36,"budget":36,"status":16},3885277,"荒川幹線118号線配水管布設替工事(荒川白久地内)","秩父広域市町村圏組合 事務局 財務課",{"id":97,"title":98,"organizationName":95,"prefectureName":91,"publishedDate":69,"deadlineDate":36,"budget":36,"status":16},3885276,"小鹿野町町道両神18号線配水管布設替工事",{"id":100,"title":101,"organizationName":95,"prefectureName":91,"publishedDate":69,"deadlineDate":36,"budget":36,"status":16},3885273,"横瀬町町道7号線配水管布設替工事(芦ヶ久保地内)",{"id":103,"title":104,"organizationName":95,"prefectureName":91,"publishedDate":69,"deadlineDate":36,"budget":36,"status":16},3885272,"市道幹線1号線配水管布設替工事(寺尾工区)",[106,112,118,124],{"title":107,"link":108,"date":109,"thumb":110,"cat":111},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":113,"link":114,"date":115,"thumb":116,"cat":117},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":119,"link":120,"date":121,"thumb":122,"cat":123},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":125,"link":126,"date":127,"thumb":128,"cat":129},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]