[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-3575052":3,"bid-history-3575052":35,"bid-related-3575052":39,"union-latest":90},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":11,"bidCategoryName":17,"bidTypeName":18,"categoryText":19,"regionText":20,"deadlineTime":21,"openingDate":14,"qualificationText":22,"aiSummary":23,"aiSummaryGated":24,"aiSummaryTruncated":25,"sourceUrl":26,"dataSourceCode":27,"budgetTaxIncluded":15,"documentUrls":28,"businessExperience":25,"localOffice":30,"securityRequirement":30,"qualifications":31,"certifications":33,"organization":34},3575052,"島田台997番地先配水管改良工事",2065,12,2,25,1,"八千代市 上下水道局 上下水道局経営企画課","千葉県","2026-08-17T15:00:00.000Z","2026-09-10T15:00:00.000Z",null,"active","上水道","一般競争入札","配水管改良工事","八千代市島田台997番地先","09:00:00","・全省庁統一資格「土木工事」又は「上下水道工事」等級を有すること\n・建設業許可（土木工事業、管工事業等）を受けていること\n・過去に同種・同規模の配水管改良工事の実績があること\n・参加資格確認申請書を提出すること\n・排出ガス対策型建設機械指定要領に基づく機械を使用できること\n・配管技能者及び不断水穿孔技能者を配置できること\n・工事用資機材等の搬入路として一般道路（市道）を使用することを承知していること","【案件概要】\n八千代市上下水道局が実施する配水管改良工事の一般競争入札。老朽化した配水管をダクタイル鋳鉄管に改良する工事で、工事場所は八千代市島田台997番地先。総工事費は設計書に記載される金額（消費税相当額含む）。工期は令和9年3月11日が工事期限で、契約締結日から同日までの履行。予算規模は大規模な上水道改良工事を想定。\n\n【業務内容】\n- DIP-E(G","X) φ200mm配水管改良工 L=280.9m、仕切弁2基（不断水弁1基含む）の施工\n- DIP-E(GX) φ100mm配水管改良工 L=35.7m、仕切弁1基の施工\n- 仮設工 φ75～φ150 L=350.2m\n- 給水管工 13箇所\n- 消火栓改良工 2箇所\n- 舗装本復旧工 A=963.06㎡\n- 既設DIP(T) φ200 L=320.0m及びφ100 L=2.2mの撤去\n- 管明示テープ・シート工及び防食工\n- 安全管理工、技術管理費、共通仮設費の計上\n\n【応募要件】\n- 八千代市上下水道局工事設計施行指針・水道工事標準仕様書の適用条件を遵守すること\n- 排出ガス対策型建設機械指定要領に基づいた建設機械の使用\n- 交通誘導員B（昼間）195人の配置\n- 掘削深さ1.5mを超える場合は山留め設置\n- 継手接合に関しては継手チェックシートに基づく全箇所測定と施工確認写真の撮影\n- 建設副産物情報交換システム（COBRIS）を利用した再資源利用計画等の作成\n- 地下埋設物等の十分な調査と適切な施工\n- 舗装版切断時の排水は産業廃棄物として適正処理\n- 電子契約への対応\n\n【工期・期間】\n契約締結日から令和9年3月11日まで。工事期限内に完成検査を行い、工事期限の14日前までに現場作業終了及び完成書類提出。着手時期は関係機関との協議の上、交通規制等を考慮して契約後1ヶ月以内に着手すること。",true,"(redacted)","ppi-core-chiba",[29],{"url":26,"name":26},false,[32],3,[],{"id":6,"name":11,"categoryId":15,"parentId":15,"parentName":15,"bidInfoUrl":15},[36],{"year":37,"count":38},2026,13,{"sameOrganization":40,"samePrefecture":65,"similar":89},[41,45,50,55,59],{"id":42,"title":43,"organizationName":11,"prefectureName":12,"publishedDate":44,"deadlineDate":15,"budget":15,"status":16},3606001,"マッピングシステム等プリンタ機器賃貸借","2026-08-18T15:00:00.000Z",{"id":46,"title":47,"organizationName":11,"prefectureName":12,"publishedDate":48,"deadlineDate":49,"budget":15,"status":16},3308397,"高津8号井戸交換工事","2026-08-05T15:00:00.000Z","2026-09-03T15:00:00.000Z",{"id":51,"title":52,"organizationName":11,"prefectureName":12,"publishedDate":53,"deadlineDate":54,"budget":15,"status":16},3026290,"睦浄水場No1配水ポンプ修繕","2026-07-29T15:00:00.000Z","2026-08-24T15:00:00.000Z",{"id":56,"title":57,"organizationName":11,"prefectureName":12,"publishedDate":58,"deadlineDate":54,"budget":15,"status":16},2742138,"村上1055番地先配水管改良工事","2026-07-22T15:00:00.000Z",{"id":60,"title":61,"organizationName":11,"prefectureName":12,"publishedDate":62,"deadlineDate":63,"budget":15,"status":64},2262557,"ストックマネジメント計画に基づく雨水管渠改築工事","2026-07-09T15:00:00.000Z","2026-08-03T15:00:00.000Z","closed",[66,71,77,81,86],{"id":67,"title":68,"organizationName":69,"prefectureName":12,"publishedDate":54,"deadlineDate":70,"budget":15,"status":16},3890177,"県単道路調査委託(法面点検)","千葉県 県土整備部 夷隅土木事務所","2026-09-09T15:00:00.000Z",{"id":72,"title":73,"organizationName":74,"prefectureName":12,"publishedDate":54,"deadlineDate":75,"budget":76,"status":16},3890176,"県単河川総合開発工事(富川橋警報局舎改良工)","千葉県 県土整備部 亀山・片倉ダム管理事務所","2026-09-24T15:00:00.000Z",29403000,{"id":78,"title":79,"organizationName":74,"prefectureName":12,"publishedDate":54,"deadlineDate":80,"budget":15,"status":16},3888896,"県単河川総合開発委託(片倉ダム放流警報設備等点検整備)","2026-09-07T15:00:00.000Z",{"id":82,"title":83,"organizationName":84,"prefectureName":12,"publishedDate":54,"deadlineDate":85,"budget":15,"status":16},3887589,"配水管改良工事(8-31-2)","柏市 上下水道局 総務課","2026-09-14T15:00:00.000Z",{"id":87,"title":88,"organizationName":84,"prefectureName":12,"publishedDate":54,"deadlineDate":80,"budget":15,"status":16},3887189,"配水管布設工事(8-101-0)",[],[91,97,103,109],{"title":92,"link":93,"date":94,"thumb":95,"cat":96},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":98,"link":99,"date":100,"thumb":101,"cat":102},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":104,"link":105,"date":106,"thumb":107,"cat":108},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":110,"link":111,"date":112,"thumb":113,"cat":114},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]