[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-3559973":3,"bid-history-3559973":36,"bid-related-3559973":40,"union-latest":92},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":11,"bidCategoryName":17,"bidTypeName":18,"categoryText":5,"regionText":19,"deadlineTime":20,"openingDate":21,"qualificationText":22,"aiSummary":23,"aiSummaryGated":24,"aiSummaryTruncated":25,"sourceUrl":26,"dataSourceCode":27,"budgetTaxIncluded":25,"documentUrls":28,"businessExperience":25,"localOffice":25,"securityRequirement":30,"qualifications":31,"certifications":32,"organization":33},3559973,"栗山公園遊具改修工事",2033,12,2,17,1,"成田市 総務部 契約検査課","千葉県","2026-08-11T15:00:00.000Z","2026-08-26T15:00:00.000Z",17578000,"active","造園","一般競争入札","成田市花崎町地先","16:00:00","2026-08-27T15:00:00.000Z","・令和8・9年度成田市入札参加資格者名簿の「建設工事」部門に登載されていること\n・公告日から開札日までの間、成田市建設工事請負業者等指名停止措置を受けていないこと\n・資格者名簿に市内業者として登載されていること\n・とび・土工・コンクリート工事について建設業法第3条で規定する建設業の許可を有すること\n・とび・土工・コンクリート工事について経営事項審査の総合評点が740点以上1,000点未満で登載されていること\n・とび・土工・コンクリート工事について監理技術者又は主任技術者を配置すること\n・配置技術者は公告日現在、3か月以上の直接的・恒常的な雇用関係にあること\n・特例監理技術者の配置を行う場合は、監理技術者補佐を専任で配置すること\n・監理技術者補佐は一級施工管理技士補又は一級施工管理技士等の国家資格者であること\n・監理技術者補佐は入札参加者と直接的かつ恒常的な雇用関係にあること\n・同一の特例監理技術者が配置できる工事は本工事を含め同時に2件まで\n・特例監理技術者が兼務できる工事は成田市内の工事であること\n・特例監理技術者と監理技術者補佐との間で常に連絡が取れる体制であること\n・成田市建設工事請負契約書約款第10条第3項の現場代理人を常駐で配置すること\n・配置現場代理人は公告日現在、3か月以上の直接的・恒常的な雇用関係にあること\n・平成28年度以降に官公庁等が発注したとび・土工・コンクリート工事について、元請として受注し施工完了した実績があること\n・手形交換所による取引停止処分を受けて2年間を経過していないこと又は開札日前6か月以内に手形、小切手を不渡りにしていないこと\n・会社更生法又は民事再生法の適用を申請した場合は、裁判所からの開始決定がされていないこと\n・本工事に係る設計業務等の受託者又は当該受託者と資本若しくは人事面において関連がある建設業者でないこと\n・開札日以前3か月以内に工事完成検査結果通知書で評定点60点未満の通知を受けていないこと\n・健康保険法第48条、厚生年金保険法第27条、雇用保険法第7条の届出の義務を履行していること\n・開札の日の前日において自らの責めに帰すべき事由により成田市発注の工事を工期内に完成することができず、当該工事目的物の引渡しを行っていないこと\n・法定外の労災保険に付保していること","【案件概要】\n成田市が栗山公園遊具改修工事の制限付一般競争入札（事後審査型）を実施する。工事場所は成田市花崎町地先で、予定価格は17,578,000円（税込）。工事期限は令和9年2月26日までで、電子入札により実施される。本工事は複合遊具1基の新設と遊具1基の撤去からなり、建設工事部門での参加資格が必要。\n\n【業務内容】\n- 複合遊具新設（1基）：安全領域内","にISO9001・ISO14001認証企業製の複合遊具を設置\n- 遊具撤去（1基）：既設の8スパン遊具を撤去\n- スライダーマット新設（2枚）：リサイクルゴム製で透水性のある安全マット設置\n- 基礎工：再生クラッシャーラン（RC-40）敷設、高炉セメントコンクリート基礎施工\n- 建設副産物処理：無筋コンクリート殻、廃プラスチック、スクラップを指定処理施設に搬出・処分\n- 交通誘導警備：資材搬出入時に交通誘導員を配置\n\n【応募要件】\n- 令和8・9年度成田市入札参加資格者名簿の「建設工事」部門に登載されていること\n- 公告日から開札日までの間、成田市建設工事請負業者等指名停止措置を受けていないこと\n- 資格者名簿に市内業者として登載され、とび・土工・コンクリート工事について建設業の許可を有すること\n- とび・土工・コンクリート工事について経営事項審査の総合評点が740点以上1,000点未満で登載されていること\n- とび・土工・コンクリート工事について監理技術者または主任技術者を配置すること（公告日現在3か月以上の直接的・恒常的な雇用関係を要す）\n- 特例監理技術者の配置を行う場合は、監理技術者補佐を専任で配置し、同一特例監理技術者の兼務工事は同時に2件まで\n- 現場代理人を常駐配置すること（公告日現在3か月以上の直接的・恒常的な雇用関係を要す）\n- 平成28年度以降に官公庁等が発注したとび・土工・コンクリート工事について、元請として受注・施工完了した実績があること\n- 手形交換所による取引停止処分を受けていないこと、および本市工事を工期内に完成できない状況にないこと\n- 法定外労災保険に付保していること\n- 過去3か月以内に工事完成検査で評定点60点未満の通知を受けていないこと\n- 健康保険法、厚生年金保険法、雇用保険法の届出義務を履行していること\n\n【工期・期間】\n契約締結の翌日から令和9年2月26日（金）までの工期。準備期間（材料納入含む）120日間、後片付け期間20日間を見込んでいる。雨休率は0.78。工事は昼間作業を原則とする。週休2日制適用工事（受注者希望型）の試行対象。",true,"(redacted)","ppi-core-chiba",[29],{"url":26,"name":26},false,[],[],{"id":6,"name":11,"categoryId":34,"parentId":35,"parentName":35,"bidInfoUrl":35},15,null,[37],{"year":38,"count":39},2026,81,{"sameOrganization":41,"samePrefecture":64,"similar":91},[42,48,52,56,60],{"id":43,"title":44,"organizationName":11,"prefectureName":12,"publishedDate":45,"deadlineDate":46,"budget":47,"status":16},3923281,"地質調査委託(吉岡前林線)","2026-08-25T15:00:00.000Z","2026-09-09T15:00:00.000Z",13926000,{"id":49,"title":50,"organizationName":11,"prefectureName":12,"publishedDate":45,"deadlineDate":46,"budget":51,"status":16},3923280,"測量調査委託(台方地内線)",4312000,{"id":53,"title":54,"organizationName":11,"prefectureName":12,"publishedDate":45,"deadlineDate":46,"budget":55,"status":16},3923279,"本庁舎空冷チラー圧縮機交換修繕",4301000,{"id":57,"title":58,"organizationName":11,"prefectureName":12,"publishedDate":45,"deadlineDate":46,"budget":59,"status":16},3923278,"成田観光館防火シャッター危害防止装置等改修工事",2662000,{"id":61,"title":62,"organizationName":11,"prefectureName":12,"publishedDate":45,"deadlineDate":46,"budget":63,"status":16},3923277,"江川幹線6号マンホールポンプ場機器修繕",3454000,[65,70,76,81,86],{"id":66,"title":67,"organizationName":68,"prefectureName":12,"publishedDate":45,"deadlineDate":46,"budget":69,"status":16},3926594,"萩生漁港整備工事","富津市 市長部局 管財契約検査課",6710000,{"id":71,"title":72,"organizationName":73,"prefectureName":12,"publishedDate":45,"deadlineDate":74,"budget":75,"status":16},3926394,"千葉県立館山総合高等学校水産校舎ヨット艇庫シャッター改修工事","千葉県 教育庁(県立学校) 千葉県立館山総合高等学校","2026-09-15T15:00:00.000Z",22858000,{"id":77,"title":78,"organizationName":79,"prefectureName":12,"publishedDate":45,"deadlineDate":46,"budget":80,"status":16},3923290,"市道高崎5号線道路維持工事","南房総市 建設環境部 建設課",3223000,{"id":82,"title":83,"organizationName":84,"prefectureName":12,"publishedDate":45,"deadlineDate":46,"budget":85,"status":16},3923289,"原岡桟橋駐車場整備工事","南房総市 商工観光部 観光プロモーション課",11913000,{"id":87,"title":88,"organizationName":89,"prefectureName":12,"publishedDate":45,"deadlineDate":46,"budget":90,"status":16},3923288,"林道小川線道路維持工事","南房総市 農林水産部 農林水産課",3905000,[],[93,99,105,111],{"title":94,"link":95,"date":96,"thumb":97,"cat":98},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":100,"link":101,"date":102,"thumb":103,"cat":104},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":106,"link":107,"date":108,"thumb":109,"cat":110},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":112,"link":113,"date":114,"thumb":115,"cat":116},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]