[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-3554676":3,"bid-history-3554676":38,"bid-related-3554676":42,"union-latest":91},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":17,"bidCategoryName":18,"bidTypeName":19,"categoryText":20,"regionText":21,"deadlineTime":22,"openingDate":23,"qualificationText":24,"aiSummary":25,"aiSummaryGated":26,"aiSummaryTruncated":27,"sourceUrl":28,"dataSourceCode":29,"budgetTaxIncluded":15,"documentUrls":30,"businessExperience":27,"localOffice":27,"securityRequirement":32,"qualifications":33,"certifications":35,"organization":36},3554676,"R8荒川第二調節池二ツ宮地区橋梁下部工事",9,11,2,16,1,"国土交通省関東地方整備局","埼玉県","2026-08-16T15:00:00.000Z","2026-08-27T15:00:00.000Z",null,"closed","荒川調節池工事事務所","橋梁","一般競争入札","橋梁下部工事","埼玉県さいたま市西区二ツ宮地先","15:00:00","2026-10-07T15:00:00.000Z","・関東地方整備局（港湾空港関係を除く）令和7・8年度一般競争参加資格で、一般土木工事C等級に認定されていること\n・別紙【近�silon地域一覧】に示す区域内に建設業法に基づく本店、支店又は営業所を有すること\n・平成23年4月1日以降に橋梁下部（橋脚・橋台）工事の元請けとして完成・引渡しが完了した施工実績を有すること（申請は1件のみ）\n・国土交通省発注工事の場合、工事成績評定点合計が65点以上であること\n・過去2年間の工事成績評定点の平均点が2年連続で60点未満でないこと\n・1級土木施工管理技士又はこれと同等以上の資格を有する主任（監理）技術者を本発注工事に専任で配置できること\n・主任（監理）技術者は橋梁下部工事の経験を有する者であること（経験申請は1件のみ）\n・監理技術者は監理技術者資格者証を有し、監理技術者講習を修了していること\n・配置予定の主任（監理）技術者は直接的かつ恒常的な雇用関係にあること\n・施工計画（簡易な施工計画）が適正であること\n・経常建設共同企業体の構成員は、対応建設業種許可を有してから営業年数が3年以上であること\n・資料提出期限から開札時までに指名停止を受けていないこと\n・本工事の設計業務等受託者又は関連建設業者でないこと\n・入札参加者間に資本関係又は人的関係がないこと","【案件概要】\n国土交通省関東地方整備局荒川調節池工事事務所が、荒川第二調節池二ツ宮地区における橋梁下部工事の一般競争入札（同時提出型）を実施する。埼玉県さいたま市西区二ツ宮地先を工事場所とし、総合評価落札方式（施工能力評価型Ⅰ型）を採用している。工期は契約締結翌日から令和9年9月15日までで、余裕期間制度（フレックス方式）が適用される。本工事は施工体制確認型","総合評価落札方式の試行工事であり、契約後VE方式も導入される。\n\n【業務内容】\n- 橋梁下部（橋脚・橋台）工事\n- 道路土工\n- 揚水機場工\n- 法覆護岸工\n- 仮設工\n- ICT活用工事（土工、基礎工、構造物工、作業土工）\n- BIM\u002FCIM適用工事\n- 建設リサイクル法対応業務\n\n【応募要件】\n- 関東地方整備局（港湾空港関係を除く）令和7・8年度一般競争参加資格で、一般土木工事C等級に認定されていること\n- 別紙【近隣地域一覧】に示す区域内（埼玉県全域を含む）に建設業法に基づく本店、支店又は営業所を有すること\n- 過去において橋梁下部（橋脚・橋台）工事の元請けとして完成・引渡しが完了した施工実績を有すること。ただし申請できる同種工事施工実績は1件のみ\n- 国土交通省発注工事の場合、評定点合計が65点以上であること\n- 過去2年間の工事成績評定点の平均点が2年連続で60点未満でないこと\n- 1級土木施工管理技士又はこれと同等以上の資格を有する主任（監理）技術者を専任で配置できること。また当該技術者は橋梁下部工事の経験を有する者であること\n- 監理技術者は監理技術者資格者証を有し、監理技術者講習を修了していること\n- 配置予定の主任（監理）技術者は直接的かつ恒常的な雇用関係にあること\n- 施工計画（簡易な施工計画）が適正であること\n- 事業協同組合として申請した場合、構成員は単体での申請ができないこと\n- 経常建設共同企業体の構成員は、対応する建設業種許可を有してから営業年数が3年以上であること\n- 資料提出期限から開札時までに指名停止を受けていないこと\n- 本工事の設計業務等受託者又はその関連建設業者でないこと\n- 入札参加者間に資本関係又は人的関係がないこと\n- 暴力団員が実質的に経営を支配する建設業者でないこと\n\n【工期・期間】\n契約締結の翌日から令和9年9月15日まで。本工事は受注者が工事の始期と終期を設定することができる工事であり、契約締結日の翌日から工事の始期までの間は、主任（監理）技術者の配置を要しない。",true,"(redacted)","ippi-koji",[31],{"url":28,"name":28},false,[34],3,[],{"id":6,"name":11,"categoryId":37,"parentId":15,"parentName":15,"bidInfoUrl":15},17,[39],{"year":40,"count":41},2026,346,{"sameOrganization":43,"samePrefecture":67,"similar":90},[44,51,55,59,62],{"id":45,"title":46,"organizationName":11,"prefectureName":47,"publishedDate":48,"deadlineDate":49,"budget":15,"status":50},4379362,"R8J相武国道事務所管内CCTV設備他設計業務","東京都","2026-09-03T15:00:00.000Z","2026-09-13T15:00:00.000Z","active",{"id":52,"title":53,"organizationName":11,"prefectureName":54,"publishedDate":48,"deadlineDate":49,"budget":15,"status":50},4379361,"R8・R9あづみの公園満足度調査業務","長野県",{"id":56,"title":57,"organizationName":11,"prefectureName":58,"publishedDate":48,"deadlineDate":49,"budget":15,"status":50},4379360,"R8圏央道道路修正設計他8K7業務","茨城県",{"id":60,"title":61,"organizationName":11,"prefectureName":54,"publishedDate":48,"deadlineDate":49,"budget":15,"status":50},4379359,"R8中部横断道環境影響・保全検討業務",{"id":63,"title":64,"organizationName":11,"prefectureName":65,"publishedDate":48,"deadlineDate":66,"budget":15,"status":50},4377087,"R8横環南栄・戸塚間改良その2工事","神奈川県","2026-09-17T15:00:00.000Z",[68,72,77,80,84],{"id":69,"title":70,"organizationName":71,"prefectureName":12,"publishedDate":48,"deadlineDate":49,"budget":15,"status":50},4425133,"令和8年度マリンワーカー事業小笠原国立公園周辺海域における水温計測等業務","環境省関東地方環境事務所",{"id":73,"title":74,"organizationName":75,"prefectureName":12,"publishedDate":48,"deadlineDate":76,"budget":15,"status":50},4425132,"ヘリウム3ガス","国立研究開発法人理化学研究所","2026-09-23T15:00:00.000Z",{"id":78,"title":79,"organizationName":75,"prefectureName":12,"publishedDate":48,"deadlineDate":76,"budget":15,"status":50},4425131,"放射性同位体 Cf-252 非密封放射性線源",{"id":81,"title":82,"organizationName":75,"prefectureName":12,"publishedDate":48,"deadlineDate":83,"budget":15,"status":50},4425130,"局所排気装置及び特定施設の点検等業務","2026-09-24T15:00:00.000Z",{"id":85,"title":86,"organizationName":87,"prefectureName":12,"publishedDate":48,"deadlineDate":88,"budget":89,"status":50},4425129,"管財課:【第468号】旧春日部市勤労者会館用地測量業務委託","埼玉県春日部市","2026-09-27T15:00:00.000Z",6498800,[],[92,98,104,110],{"title":93,"link":94,"date":95,"thumb":96,"cat":97},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":99,"link":100,"date":101,"thumb":102,"cat":103},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":105,"link":106,"date":107,"thumb":108,"cat":109},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":111,"link":112,"date":113,"thumb":114,"cat":115},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]