[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-3374743":3,"bid-related-3374743":38,"bid-history-3374743":106,"union-latest":119},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":17,"bidCategoryName":18,"bidTypeName":19,"categoryText":20,"regionText":21,"deadlineTime":22,"openingDate":23,"qualificationText":24,"aiSummary":25,"aiSummaryGated":26,"aiSummaryTruncated":27,"sourceUrl":28,"dataSourceCode":29,"budgetTaxIncluded":15,"documentUrls":30,"businessExperience":27,"localOffice":27,"securityRequirement":34,"qualifications":35,"certifications":36,"organization":37},3374743,"花高1住宅2番館建替(特殊基礎)工事",2970,42,2,28,1,"佐世保市","長崎県","2024-04-30T15:00:00.000Z","2024-05-21T15:00:00.000Z",null,"closed","財務部 契約課","その他工事","一般競争入札","とび・土工・コンクリート工事","佐世保市花高一丁目","17:00:00","2024-05-22T15:00:00.000Z","・令和6年度佐世保市建設工事入札参加資格者名簿の「とび・土工・コンクリート工事」に登録されていること\n・とび・土工・コンクリート工事業に係る特定建設業の許可を有すること\n・佐世保市内に本店を有すること\n・建設業法に基づく監理技術者又は国家資格を有する主任技術者を工事現場に専任で配置できること（3か月以上の雇用関係必須）\n・佐世保市の市税・国民健康保険税、消費税及び地方消費税の滞納がないこと\n・入札期日以前6か月以内に不渡手形及び不渡小切手を出していないこと\n・公告日以前3か月以内の工事成績評定点が65点以上であること\n・会社更生法又は民事再生法の手続き開始申立てがなされていないこと\n・平成21年度以降、既製コンクリート杭、鋼杭、場所打ちコンクリート杭のいずれかの施工実績を有すること（元請実績）\n・佐世保市電子入札システムでICカード利用者登録を行っていること\n・直近の経営規模等評価結果通知書のとび・土工・コンクリート工事の平均完成工事高が1,000万円以上であること\n・本公告日が属する月を含み以前2か月以内にとび・土工・コンクリート工事を制限付き一般競争入札により落札していないこと\n・系列関係がある会社同士の複数入札申請は不可","【案件概要】\n佐世保市が花高1住宅2番館の建替に伴う特殊基礎工事を一般競争入札により実施する。本工事は事前審査型制限付き一般競争入札で、対象地域は佐世保市花高一丁目。工期は令和6年10月30日までの予定である。工事内容は場所打ちコンクリート杭工法による特殊基礎工事で、φ2.0m×18本、φ1.0m×6本の計24本、杭長6.1m～11.63mの施工を対象とする","。\n\n【業務内容】\n- 場所打ちコンクリート杭工事（全周回転式オールケーシング工法）\n- 杭径φ2.0m×18本、φ1.0m×6本の施工\n- 杭長6.1m～11.63mの範囲での施工\n- 花高1住宅2番館建替に伴う特殊基礎工事全般\n\n【応募要件】\n- 令和6年度佐世保市建設工事入札参加資格者名簿の「とび・土工・コンクリート工事」に登録されていること\n- とび・土工・コンクリート工事業に係る特定建設業の許可を有すること\n- 佐世保市内に本店を有すること\n- 建設業法に基づく監理技術者又は国家資格を有する主任技術者を工事現場に専任で配置できること（3か月以上の雇用関係が必要）\n- 佐世保市の市税・国民健康保険税、消費税及び地方消費税の滞納がないこと\n- 入札期日以前6か月以内に取引銀行において不渡手形及び不渡小切手を出していないこと\n- 公告日以前3か月以内の工事成績評定点が65点以上であること\n- 会社更生法又は民事再生法の手続き開始申立てがなされていないこと\n- 平成21年度以降、国・独立行政法人等又は地方公共団体を相手方として、既製コンクリート杭、鋼杭、場所打ちコンクリート杭のいずれかの施工実績を有すること（元請実績）\n- 佐世保市電子入札システムでICカード利用者登録を行っていること\n- 直近の経営規模等評価結果通知書のとび・土工・コンクリート工事の平均完成工事高が1,000万円以上であること\n- 本公告日が属する月を含み以前2か月以内にとび・土工・コンクリート工事を制限付き一般競争入札により落札していないこと（当初契約金額2億円以上工事は完成していないこと、ただし契約日から6か月を上限）\n- 系列関係がある会社同士の複数入札申請は不可（いずれか1社のみ）\n\n【工期・期間】\n契約締結日から令和6年10月30日まで\n\n【入札参加申請期間】\n令和6年5月1日（水）から令和6年5月16日（木）午後0時まで\n（書類提出は開庁日の午前8時30分から午後5時15分まで、午後0時から午後1時を除く）\n\n【入札期間】\n令和6年5月17日（金）午後1時から令和6年5月22日（水）午後5時まで",true,"(redacted)","koukai-sasebo",[31,32,33],{"url":28,"name":28},{"url":28,"name":28},{"url":28,"name":28},false,[],[],{"id":6,"name":11,"categoryId":15,"parentId":15,"parentName":15,"bidInfoUrl":15},{"sameOrganization":39,"samePrefecture":59,"similar":80},[40,46,50,53,56],{"id":41,"title":42,"organizationName":11,"prefectureName":12,"publishedDate":43,"deadlineDate":44,"budget":15,"status":45},4388731,"佐世保相浦循環線法面補修工事","2026-09-03T15:00:00.000Z","2026-09-27T15:00:00.000Z","active",{"id":47,"title":48,"organizationName":11,"prefectureName":12,"publishedDate":43,"deadlineDate":49,"budget":15,"status":45},4388730,"広田浄水場汚泥脱水機設備修繕工事","2026-09-15T15:00:00.000Z",{"id":51,"title":52,"organizationName":11,"prefectureName":12,"publishedDate":43,"deadlineDate":44,"budget":15,"status":45},4388729,"俵町23-18付近配水管布設工事",{"id":54,"title":55,"organizationName":11,"prefectureName":12,"publishedDate":43,"deadlineDate":44,"budget":15,"status":45},4388728,"権常寺町付近配水管布設(その2)工事",{"id":57,"title":58,"organizationName":11,"prefectureName":12,"publishedDate":43,"deadlineDate":44,"budget":15,"status":45},4388727,"江迎町長坂140付近配水管布設工事",[60,65,69,73,76],{"id":61,"title":62,"organizationName":63,"prefectureName":12,"publishedDate":43,"deadlineDate":64,"budget":15,"status":45},4426781,"鏡田地区(田)災害復旧工事","長崎県雲仙市","2026-09-09T15:00:00.000Z",{"id":66,"title":67,"organizationName":63,"prefectureName":12,"publishedDate":43,"deadlineDate":68,"budget":15,"status":45},4426780,"市道国見旧県道1号線改良工事","2026-09-10T15:00:00.000Z",{"id":70,"title":71,"organizationName":12,"prefectureName":12,"publishedDate":43,"deadlineDate":72,"budget":15,"status":45},4425399,"ミーティングチェア","2026-09-28T15:00:00.000Z",{"id":74,"title":75,"organizationName":12,"prefectureName":12,"publishedDate":43,"deadlineDate":72,"budget":15,"status":45},4425398,"ローパーテーション",{"id":77,"title":78,"organizationName":12,"prefectureName":12,"publishedDate":43,"deadlineDate":79,"budget":15,"status":45},4425397,"8入札第59~61号 黒板機能付きプロジェクター(長崎・西海・五島地区)","2026-10-14T15:00:00.000Z",[81,87,93,98,101],{"id":82,"title":83,"organizationName":84,"prefectureName":84,"publishedDate":43,"deadlineDate":85,"budget":86,"status":45},4427566,"公告日 令和8\u002F9\u002F4 令和8年度営繕第0480-分2009号 県営住宅一身田団地P15棟ほか長寿命化型改善及び住戸内改善工事設計業務委託","三重県","2026-09-14T15:00:00.000Z",4111800,{"id":88,"title":89,"organizationName":90,"prefectureName":91,"publishedDate":43,"deadlineDate":92,"budget":15,"status":45},4424828,"令和8年度民間住宅ローンの実態に関する調査","国土交通省","東京都","2026-09-16T15:00:00.000Z",{"id":94,"title":95,"organizationName":96,"prefectureName":97,"publishedDate":43,"deadlineDate":85,"budget":15,"status":45},4424648,"【入札公告117号】令和8年 市営城南住宅集会所修繕工事","宮城県白石市","宮城県",{"id":99,"title":100,"organizationName":96,"prefectureName":97,"publishedDate":43,"deadlineDate":64,"budget":15,"status":45},4424647,"入札公告(令和8年度 市営城南住宅4号棟共用階段手摺設置工事)",{"id":102,"title":103,"organizationName":104,"prefectureName":105,"publishedDate":43,"deadlineDate":72,"budget":15,"status":45},4404551,"(仮称)からと中央住宅4号棟給排水ガス設備工事","神戸市","兵庫県",[107,110,113,116],{"year":108,"count":109},2023,461,{"year":111,"count":112},2024,506,{"year":114,"count":115},2025,442,{"year":117,"count":118},2026,313,[120,126,132,138],{"title":121,"link":122,"date":123,"thumb":124,"cat":125},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":127,"link":128,"date":129,"thumb":130,"cat":131},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":133,"link":134,"date":135,"thumb":136,"cat":137},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":139,"link":140,"date":141,"thumb":142,"cat":143},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]