[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-3374630":3,"bid-history-3374630":37,"bid-related-3374630":50,"union-latest":116},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":17,"bidCategoryName":18,"bidTypeName":19,"categoryText":20,"regionText":21,"deadlineTime":22,"openingDate":23,"qualificationText":24,"aiSummary":25,"aiSummaryGated":26,"aiSummaryTruncated":27,"sourceUrl":28,"dataSourceCode":29,"budgetTaxIncluded":15,"documentUrls":30,"businessExperience":33,"localOffice":27,"securityRequirement":33,"qualifications":34,"certifications":35,"organization":36},3374630,"春口川1号暗渠改良工事",2970,42,2,14,1,"佐世保市","長崎県","2024-07-23T15:00:00.000Z","2024-08-04T15:00:00.000Z",null,"closed","財務部 契約課","土木","一般競争入札","とび・土工・コンクリート工事","佐世保市世知原町栗迎","17:00:00","2024-08-05T15:00:00.000Z","・令和6年度佐世保市建設工事入札参加資格者名簿に「とび・土工・コンクリート工事」として登録されていること\n・とび・土工・コンクリート工事に係る建設業の許可を有すること\n・佐世保市内に本店を有すること\n・佐世保市の市税・国民健康保険税、消費税及び地方消費税の滞納がないこと\n・入札参加資格申請の提出期限日及び入札期日以前6か月以内に取引銀行において不渡手形及び不渡小切手を出していないこと\n・本公告日以前3か月以内に佐世保市からとび・土工・コンクリート工事における工事成績評定点65点未満の通知を受けていないこと\n・会社更生法又は民事再生法に基づく手続き開始の申立てがなされていないこと（手続き開始決定後に経営事項審査を受け資格審査申請書を再度提出し受理された者を除く）\n・佐世保市電子入札システムにおいてICカードを使用し利用者登録を行っていること\n・直近に佐世保市に提出した経営規模等評価結果通知書等のとび・土工・コンクリート工事の平均完成工事高が0でないこと\n・本公告日が属する月を含み以前2か月以内に佐世保市が発注した災害復旧工事を除くとび・土工・コンクリート工事を制限付き一般競争入札により落札していないこと（共同企業体の構成員を含む。ただし契約が成立しなかった場合は除く）\n・佐世保市が発注した当初契約金額が2億円以上のとび・土工・コンクリート工事を受注した場合、入札参加資格申請時において当該工事が完成していないものでないこと（契約日以後6か月間を上限とする期間については可）\n・系列関係がある会社同士との入札参加でないこと（いずれか1社のみの入札参加申請を認める）","【案件概要】\n佐世保市が実施する春口川1号暗渠改良工事の事後審査型制限付き一般競争入札。工事場所は佐世保市世知原町栗迎。工事延長218.0m、断面修復工・ひび割れ補修工・表面含浸工を含む。工期は契約日から令和7年1月21日まで。週休2日試行工事として実施される。\n\n【業務内容】\n- 工事延長 L=218.0m\n- 断面修復工 N=1構造物（V=0.42㎥）\n","- ひび割れ補修工 N=1構造物（L=41.2m）\n- 表面含浸工 A=420㎡\n\n【応募要件】\n- 令和6年度佐世保市建設工事入札参加資格者名簿に「とび・土工・コンクリート工事」として登録されていること\n- とび・土工・コンクリート工事に係る建設業の許可を有すること\n- 佐世保市内に本店を有すること\n- 佐世保市の市税・国民健康保険税、消費税及び地方消費税の滞納がないこと\n- 入札参加資格申請の提出期限日及び入札期日以前6か月以内に取引銀行において不渡手形及び不渡小切手を出していないこと\n- 本公告日以前3か月以内に佐世保市からとび・土工・コンクリート工事における工事成績評定点65点未満の通知を受けていないこと\n- 会社更生法第17条又は民事再生法第21条第1項に基づく手続き開始の申立てがなされていないこと\n- 佐世保市電子入札システムにおいてICカードを使用し利用者登録を行っていること\n- 直近に佐世保市に提出した経営規模等評価結果通知書等のとび・土工・コンクリート工事の平均完成工事高が0でないこと\n- 本公告日が属する月を含み以前2か月以内に佐世保市が発注した災害復旧工事を除くとび・土工・コンクリート工事を制限付き一般競争入札により落札していないこと（共同企業体の構成員を含む）\n- 系列関係がある会社同士との入札参加でないこと\n\n【工期・期間】\n契約日から令和7年1月21日まで",true,"(redacted)","koukai-sasebo",[31,32],{"url":28,"name":28},{"url":28,"name":28},false,[],[],{"id":6,"name":11,"categoryId":15,"parentId":15,"parentName":15,"bidInfoUrl":15},[38,41,44,47],{"year":39,"count":40},2023,461,{"year":42,"count":43},2024,506,{"year":45,"count":46},2025,442,{"year":48,"count":49},2026,313,{"sameOrganization":51,"samePrefecture":71,"similar":92},[52,58,62,65,68],{"id":53,"title":54,"organizationName":11,"prefectureName":12,"publishedDate":55,"deadlineDate":56,"budget":15,"status":57},4388731,"佐世保相浦循環線法面補修工事","2026-09-03T15:00:00.000Z","2026-09-27T15:00:00.000Z","active",{"id":59,"title":60,"organizationName":11,"prefectureName":12,"publishedDate":55,"deadlineDate":61,"budget":15,"status":57},4388730,"広田浄水場汚泥脱水機設備修繕工事","2026-09-15T15:00:00.000Z",{"id":63,"title":64,"organizationName":11,"prefectureName":12,"publishedDate":55,"deadlineDate":56,"budget":15,"status":57},4388729,"俵町23-18付近配水管布設工事",{"id":66,"title":67,"organizationName":11,"prefectureName":12,"publishedDate":55,"deadlineDate":56,"budget":15,"status":57},4388728,"権常寺町付近配水管布設(その2)工事",{"id":69,"title":70,"organizationName":11,"prefectureName":12,"publishedDate":55,"deadlineDate":56,"budget":15,"status":57},4388727,"江迎町長坂140付近配水管布設工事",[72,77,81,85,88],{"id":73,"title":74,"organizationName":75,"prefectureName":12,"publishedDate":55,"deadlineDate":76,"budget":15,"status":57},4426781,"鏡田地区(田)災害復旧工事","長崎県雲仙市","2026-09-09T15:00:00.000Z",{"id":78,"title":79,"organizationName":75,"prefectureName":12,"publishedDate":55,"deadlineDate":80,"budget":15,"status":57},4426780,"市道国見旧県道1号線改良工事","2026-09-10T15:00:00.000Z",{"id":82,"title":83,"organizationName":12,"prefectureName":12,"publishedDate":55,"deadlineDate":84,"budget":15,"status":57},4425399,"ミーティングチェア","2026-09-28T15:00:00.000Z",{"id":86,"title":87,"organizationName":12,"prefectureName":12,"publishedDate":55,"deadlineDate":84,"budget":15,"status":57},4425398,"ローパーテーション",{"id":89,"title":90,"organizationName":12,"prefectureName":12,"publishedDate":55,"deadlineDate":91,"budget":15,"status":57},4425397,"8入札第59~61号 黒板機能付きプロジェクター(長崎・西海・五島地区)","2026-10-14T15:00:00.000Z",[93,96,101,106,111],{"id":94,"title":95,"organizationName":11,"prefectureName":12,"publishedDate":55,"deadlineDate":56,"budget":15,"status":57},4383799,"鹿子前排水区3号暗渠改良工事",{"id":97,"title":98,"organizationName":11,"prefectureName":12,"publishedDate":99,"deadlineDate":100,"budget":15,"status":57},3716876,"権常寺川排水区2号暗渠改良工事","2026-08-20T15:00:00.000Z","2026-09-08T15:00:00.000Z",{"id":102,"title":103,"organizationName":11,"prefectureName":12,"publishedDate":104,"deadlineDate":105,"budget":15,"status":16},3364086,"小佐世保川排水区2号暗渠改良工事","2025-08-28T15:00:00.000Z","2025-09-09T15:00:00.000Z",{"id":107,"title":108,"organizationName":11,"prefectureName":12,"publishedDate":109,"deadlineDate":110,"budget":15,"status":16},3364100,"大黒川排水区2号暗渠改良工事","2025-08-26T15:00:00.000Z","2025-09-07T15:00:00.000Z",{"id":112,"title":113,"organizationName":11,"prefectureName":12,"publishedDate":114,"deadlineDate":115,"budget":15,"status":16},3364154,"光月川排水区支流1号暗渠改良工事","2025-07-31T15:00:00.000Z","2025-08-18T15:00:00.000Z",[117,123,129,135],{"title":118,"link":119,"date":120,"thumb":121,"cat":122},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":124,"link":125,"date":126,"thumb":127,"cat":128},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":130,"link":131,"date":132,"thumb":133,"cat":134},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":136,"link":137,"date":138,"thumb":139,"cat":140},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]