[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-3374382":3,"bid-history-3374382":37,"bid-related-3374382":50,"union-latest":122},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":17,"bidCategoryName":18,"bidTypeName":19,"categoryText":20,"regionText":21,"deadlineTime":22,"openingDate":23,"qualificationText":24,"aiSummary":25,"aiSummaryGated":26,"aiSummaryTruncated":27,"sourceUrl":28,"dataSourceCode":29,"budgetTaxIncluded":15,"documentUrls":30,"businessExperience":33,"localOffice":27,"securityRequirement":33,"qualifications":34,"certifications":35,"organization":36},3374382,"本ヶ浦川1号暗渠改良工事",2970,42,2,14,1,"佐世保市","長崎県","2024-11-26T15:00:00.000Z","2024-12-08T15:00:00.000Z",null,"closed","財務部 契約課","土木","一般競争入札","とび・土工・コンクリート工事","佐世保市鹿町町下歌ヶ浦","17:00:00","2024-12-09T15:00:00.000Z","・令和6年度佐世保市建設工事入札参加資格者名簿に「とび・土工・コンクリート工事」として登録されている者\n・とび・土工・コンクリート工事に係る建設業の許可を有する者\n・佐世保市内に本店を有する者\n・佐世保市の市税・国民健康保険税、消費税及び地方消費税の滞納がない者\n・入札参加資格申請提出期限日及び入札期日以前6か月以内に取引銀行において不渡手形及び不渡小切手を出していない者\n・本公告日以前3か月以内に佐世保市からとび・土工・コンクリート工事における工事成績評定点65点未満の通知を受けていない者\n・会社更生法第17条の規定に基づく更生手続き開始の申立て又は民事再生法第21条第1項の規定に基づく再生手続き開始の申立てがなされていない者\n・佐世保市電子入札システムにおいてICカードを使用し利用者登録を行っている者\n・直近に佐世保市に提出した経営規模等評価結果通知書・総合評定値通知書のとび・土工・コンクリート工事の平均完成工事高が0でない者","【案件概要】\n佐世保市が本ヶ浦川1号暗渠改良工事の一般競争入札（事後審査型）を実施。対象地域は佐世保市鹿町町下歌ヶ浦。工期は令和7年3月18日まで。本工事は佐世保市週休2日工事の試行要領に基づく週休2日試行工事。予定価格及び最低制限価格は市財務規則に基づき定める。\n\n【業務内容】\n- 工事延長L=24.3m\n- 断面修復工 N=1構造物（V=0.12㎥）\n-","ひび割れ補修工 N=1構造物（L=6.5m）\n- 表面含浸工 A=166㎡\n\n【応募要件】\n・令和6年度佐世保市建設工事入札参加資格者名簿に「とび・土工・コンクリート工事」として登録されている者\n・とび・土工・コンクリート工事に係る建設業の許可を有する者\n・佐世保市内に本店を有する者\n・佐世保市の市税・国民健康保険税、消費税及び地方消費税の滞納がない者\n・入札参加資格申請提出期限日及び入札期日以前6か月以内に取引銀行において不渡手形及び不渡小切手を出していない者\n・本公告日以前3か月以内に佐世保市からとび・土工・コンクリート工事における工事成績評定点65点未満の通知を受けていない者\n・会社更生法第17条の規定に基づく更生手続き開始の申立て又は民事再生法第21条第1項の規定に基づく再生手続き開始の申立てがなされていない者\n・佐世保市電子入札システムにおいてICカードを使用し利用者登録を行っている者\n・直近に佐世保市に提出した経営規模等評価結果通知書・総合評定値通知書のとび・土工・コンクリート工事の平均完成工事高が0でない者\n・本公告日から落札決定までの間に指名停止措置又は指名除外の措置を受けていない者\n・下請代金等の未払い業者等に対する入札参加規制の措置を受けていない者\n・系列関係のある会社同士での入札参加は不可（いずれか1社のみ）\n\n【工期・期間】\n契約締結日から令和7年3月18日まで\n\n【入札スケジュール】\n入札参加申請期間：令和6年11月27日（水）から令和6年12月3日（火）午後0時まで（土日祝日及び午後8時から午前8時30分までは除く）\n入札期間：令和6年12月4日（水）午後1時から令和6年12月9日（月）午後5時まで（土日祝日及び午後8時から午前8時30分までは除く）\n開札日時：令和6年12月10日（火）午前11時00分\n落札候補者審査資料提出期限：開札日時から令和6年12月12日（木）午後0時まで（開庁日の午前8時30分から午後5時15分、午後0時から午後1時までは除く）",true,"(redacted)","koukai-sasebo",[31,32],{"url":28,"name":28},{"url":28,"name":28},false,[],[],{"id":6,"name":11,"categoryId":15,"parentId":15,"parentName":15,"bidInfoUrl":15},[38,41,44,47],{"year":39,"count":40},2023,461,{"year":42,"count":43},2024,506,{"year":45,"count":46},2025,442,{"year":48,"count":49},2026,285,{"sameOrganization":51,"samePrefecture":71,"similar":94},[52,58,61,64,67],{"id":53,"title":54,"organizationName":11,"prefectureName":12,"publishedDate":55,"deadlineDate":56,"budget":15,"status":57},3716882,"針尾漁港(鯛ノ浦地区)防波堤磁気探査及び潜水探査業務委託","2026-08-20T15:00:00.000Z","2026-09-08T15:00:00.000Z","active",{"id":59,"title":60,"organizationName":11,"prefectureName":12,"publishedDate":55,"deadlineDate":56,"budget":15,"status":57},3716881,"高島漁港東防波堤機能強化設計業務委託",{"id":62,"title":63,"organizationName":11,"prefectureName":12,"publishedDate":55,"deadlineDate":56,"budget":15,"status":57},3716879,"佐世保相浦循環線外4線道路照明灯更新工事",{"id":65,"title":66,"organizationName":11,"prefectureName":12,"publishedDate":55,"deadlineDate":56,"budget":15,"status":57},3716878,"花高団地高架橋橋梁補修工事",{"id":68,"title":69,"organizationName":11,"prefectureName":12,"publishedDate":55,"deadlineDate":70,"budget":15,"status":57},3716877,"日野町下水道マンホール蓋取替工事","2026-09-01T15:00:00.000Z",[72,77,82,86,89],{"id":73,"title":74,"organizationName":12,"prefectureName":12,"publishedDate":75,"deadlineDate":76,"budget":15,"status":57},3888863,"8上河ダ第2－1号 宮ノ川ダム他メンテナンス工事（取水放流設備点検業務委託）","2026-08-24T15:00:00.000Z","2026-09-07T15:00:00.000Z",{"id":78,"title":79,"organizationName":80,"prefectureName":12,"publishedDate":75,"deadlineDate":81,"budget":15,"status":57},3883341,"【総合評価】８債単造第１号 長崎北陽台高校運動場全面改修工事","土木部 営繕課","2026-09-15T15:00:00.000Z",{"id":83,"title":84,"organizationName":85,"prefectureName":12,"publishedDate":75,"deadlineDate":81,"budget":15,"status":57},3883340,"【総合評価】８総防地改第３－３号 一般県道富川渓線道路改良工事（８工区）","県央振興局",{"id":87,"title":88,"organizationName":12,"prefectureName":12,"publishedDate":75,"deadlineDate":76,"budget":15,"status":57},3882903,"令和８年度森林経営管理制度市町支援業務",{"id":90,"title":91,"organizationName":92,"prefectureName":12,"publishedDate":75,"deadlineDate":93,"budget":15,"status":57},3874543,"軽自動車税申告書","税務課","2026-09-02T15:00:00.000Z",[95,98,103,108,115],{"id":96,"title":97,"organizationName":11,"prefectureName":12,"publishedDate":55,"deadlineDate":56,"budget":15,"status":57},3716876,"権常寺川排水区2号暗渠改良工事",{"id":99,"title":100,"organizationName":101,"prefectureName":12,"publishedDate":102,"deadlineDate":56,"budget":15,"status":57},3571571,"【総合評価】8債県北河総第１－３号 雪浦川河川改修工事（３工区）","県北振興局","2026-08-17T15:00:00.000Z",{"id":104,"title":105,"organizationName":15,"prefectureName":106,"publishedDate":107,"deadlineDate":15,"budget":15,"status":57},2274820,"単独公共 単独砂防維持管理事業転落防止柵更新工事 烏川支川 浦川 高崎市箕郷町善地地先","群馬県","2026-07-09T15:00:00.000Z",{"id":109,"title":110,"organizationName":111,"prefectureName":112,"publishedDate":113,"deadlineDate":114,"budget":15,"status":16},1936199,"桜島地区治山工事(松浦川第3支流)","林野庁九州森林管理局鹿児島森林管理署","鹿児島県","2026-06-29T15:00:00.000Z","2026-07-30T15:00:00.000Z",{"id":116,"title":117,"organizationName":118,"prefectureName":119,"publishedDate":120,"deadlineDate":121,"budget":15,"status":16},1572085,"日浦川測量及び実施設計業務(8-1)","広島県広島市","広島県","2026-06-18T15:00:00.000Z","2026-07-02T15:00:00.000Z",[123,129,135,141],{"title":124,"link":125,"date":126,"thumb":127,"cat":128},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":130,"link":131,"date":132,"thumb":133,"cat":134},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":136,"link":137,"date":138,"thumb":139,"cat":140},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":142,"link":143,"date":144,"thumb":145,"cat":146},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]