[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-3364094":3,"bid-history-3364094":37,"bid-related-3364094":50,"union-latest":93},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":17,"bidCategoryName":18,"bidTypeName":19,"categoryText":20,"regionText":21,"deadlineTime":22,"openingDate":23,"qualificationText":24,"aiSummary":25,"aiSummaryGated":26,"aiSummaryTruncated":27,"sourceUrl":28,"dataSourceCode":29,"budgetTaxIncluded":15,"documentUrls":30,"businessExperience":33,"localOffice":27,"securityRequirement":33,"qualifications":34,"certifications":35,"organization":36},3364094,"小森橋橋梁補修工事",2970,42,2,18,1,"佐世保市","長崎県","2025-08-26T15:00:00.000Z","2025-09-07T15:00:00.000Z",null,"closed","財務部 契約課","塗装","一般競争入札","塗装工事","佐世保市江迎町長坂","17:00:00","2025-09-08T15:00:00.000Z","・令和7年度佐世保市建設工事入札参加資格者名簿の「塗装工事」に登録されていること\n・塗装工事業に係る建設業の許可を有すること\n・佐世保市内に本店を有すること\n・佐世保市の市税・国民健康保険税、消費税及び地方消費税の滞納がないこと\n・入札参加資格申請の提出期限日及び入札期日以前6か月以内に、取引銀行において不渡手形及び不渡小切手を出していないこと\n・本公告日以前3か月以内に佐世保市から塗装工事における工事成績評定点65点未満の通知を受けていないこと\n・会社更生法第17条及び民事再生法第21条第1項の規定に基づく手続き開始申立てがなされていないこと\n・佐世保市電子入札システムにおいてICカードを使用し、利用者登録を行っていること\n・直近に佐世保市に提出した経営規模等評価結果通知書の塗装工事の平均完成工事高が350万円以上であること","【案件概要】\n佐世保市が小森橋の橋梁補修工事を一般競争入札（事後審査型）で実施。工事場所は佐世保市江迎町長坂、工期は令和8年3月10日までで、工事延長L=26.5m。週休2日試行工事であり、猛暑日12日分を工期に見込んでいる。本工事は部材取替工・排水管取替・紫外線硬化型FRPシート設置工・塗替塗装工を実施する塗装工事である。\n\n【業務内容】\n- 部材取替工（","N=11部材）\n- 排水管取替（N=6箇所）\n- 紫外線硬化型FRPシート設置工（紫外線照射なし A=7.3㎡、紫外線照射あり A=3.0㎡）\n- 塗替塗装工（A=260㎡）\n\n【応募要件】\n- 令和7年度佐世保市建設工事入札参加資格者名簿の「塗装工事」に登録されていること\n- 塗装工事業に係る建設業の許可を有すること\n- 佐世保市内に本店を有すること\n- 佐世保市の市税・国民健康保険税、消費税及び地方消費税の滞納がないこと\n- 入札参加資格申請の提出期限日及び入札期日以前6か月以内に、取引銀行において不渡手形及び不渡小切手を出していないこと\n- 本公告日以前3か月以内に佐世保市から塗装工事における工事成績評定点65点未満の通知を受けていないこと\n- 会社更生法及び民事再生法の手続き開始申立てがなされていないこと\n- 佐世保市電子入札システムにおいてICカードを使用し、利用者登録を行っていること\n- 直近に佐世保市に提出した経営規模等評価結果通知書の塗装工事の平均完成工事高が350万円以上であること\n- 本公告日が属する月を含み、以前2か月以内に佐世保市が発注した塗装工事を制限付き一般競争入札により落札していないこと（ただし契約が成立しなかった場合は除く）\n- 佐世保市等が発注した当初契約金額2億円以上の塗装工事を受注した場合、入札参加資格申請時において当該工事が完成していないことがないこと\n- 系列関係がある会社同士での入札参加は不可（いずれか1社のみ）\n\n【工期・期間】\n令和8年3月10日まで。入札参加申請期間：令和7年8月27日（水）から令和7年9月2日（火）午後0時まで。入札期間：令和7年9月3日（水）午後1時から令和7年9月8日（月）午後5時まで。開札日時：令和7年9月9日（火）午前11時40分。落札候補者の審査資料提出期限：開札日時から令和7年9月11日（木）午後0時まで。",true,"(redacted)","koukai-sasebo",[31,32],{"url":28,"name":28},{"url":28,"name":28},false,[],[],{"id":6,"name":11,"categoryId":15,"parentId":15,"parentName":15,"bidInfoUrl":15},[38,41,44,47],{"year":39,"count":40},2023,461,{"year":42,"count":43},2024,506,{"year":45,"count":46},2025,442,{"year":48,"count":49},2026,313,{"sameOrganization":51,"samePrefecture":71,"similar":92},[52,58,62,65,68],{"id":53,"title":54,"organizationName":11,"prefectureName":12,"publishedDate":55,"deadlineDate":56,"budget":15,"status":57},4388731,"佐世保相浦循環線法面補修工事","2026-09-03T15:00:00.000Z","2026-09-27T15:00:00.000Z","active",{"id":59,"title":60,"organizationName":11,"prefectureName":12,"publishedDate":55,"deadlineDate":61,"budget":15,"status":57},4388730,"広田浄水場汚泥脱水機設備修繕工事","2026-09-15T15:00:00.000Z",{"id":63,"title":64,"organizationName":11,"prefectureName":12,"publishedDate":55,"deadlineDate":56,"budget":15,"status":57},4388729,"俵町23-18付近配水管布設工事",{"id":66,"title":67,"organizationName":11,"prefectureName":12,"publishedDate":55,"deadlineDate":56,"budget":15,"status":57},4388728,"権常寺町付近配水管布設(その2)工事",{"id":69,"title":70,"organizationName":11,"prefectureName":12,"publishedDate":55,"deadlineDate":56,"budget":15,"status":57},4388727,"江迎町長坂140付近配水管布設工事",[72,77,81,85,88],{"id":73,"title":74,"organizationName":75,"prefectureName":12,"publishedDate":55,"deadlineDate":76,"budget":15,"status":57},4426781,"鏡田地区(田)災害復旧工事","長崎県雲仙市","2026-09-09T15:00:00.000Z",{"id":78,"title":79,"organizationName":75,"prefectureName":12,"publishedDate":55,"deadlineDate":80,"budget":15,"status":57},4426780,"市道国見旧県道1号線改良工事","2026-09-10T15:00:00.000Z",{"id":82,"title":83,"organizationName":12,"prefectureName":12,"publishedDate":55,"deadlineDate":84,"budget":15,"status":57},4425399,"ミーティングチェア","2026-09-28T15:00:00.000Z",{"id":86,"title":87,"organizationName":12,"prefectureName":12,"publishedDate":55,"deadlineDate":84,"budget":15,"status":57},4425398,"ローパーテーション",{"id":89,"title":90,"organizationName":12,"prefectureName":12,"publishedDate":55,"deadlineDate":91,"budget":15,"status":57},4425397,"8入札第59~61号 黒板機能付きプロジェクター(長崎・西海・五島地区)","2026-10-14T15:00:00.000Z",[],[94,100,106,112],{"title":95,"link":96,"date":97,"thumb":98,"cat":99},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":101,"link":102,"date":103,"thumb":104,"cat":105},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":107,"link":108,"date":109,"thumb":110,"cat":111},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":113,"link":114,"date":115,"thumb":116,"cat":117},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]