[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-3314010":3,"bid-related-3314010":40,"bid-history-3314010":109,"union-latest":115},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":11,"bidCategoryName":17,"bidTypeName":18,"categoryText":17,"regionText":19,"deadlineTime":20,"openingDate":21,"qualificationText":22,"aiSummary":23,"aiSummaryGated":24,"aiSummaryTruncated":25,"sourceUrl":26,"dataSourceCode":27,"budgetTaxIncluded":15,"documentUrls":28,"businessExperience":25,"localOffice":25,"securityRequirement":35,"qualifications":36,"certifications":37,"organization":38},3314010,"令和8年度ALSOKぐんま総合スポーツセンターテニスコート夜間照明LED化工事",2759,10,2,21,1,"群馬県県土整備部建築課","群馬県","2026-08-05T15:00:00.000Z","2026-09-02T15:00:00.000Z",null,"active","電気","一般競争入札","前橋市関根町　地内","16:00:00","2026-09-03T15:00:00.000Z","・群馬県建設工事入札参加資格者名簿に登載されていること\n・電気工事について建設業法に基づく特定建設業の許可を受けていること\n・群馬県令和8・9年度建設工事入札参加資格者名簿における電気工事の総合数値が840点以上であること\n・同種の電気工事を群馬県内で施工した実績を有すること（元請として平成28年4月1日から令和8年3月31日までに完成引渡し完了、または共同企業体の構成員で出資比率20%以上、かつ公共工事または地方公共団体委託工事であること）\n・一級管工事施工管理技士の資格を有する監理技術者または主任技術者を工事期間中に専任で配置できること\n・配置予定技術者は申請時点で3ヶ月以上継続して雇用されていること\n・配置予定技術者は平成28年4月1日から令和8年3月31日までに完成引渡しを完了した同種電気工事の経験を有すること\n・前橋土木事務所、渋川土木事務所、中之条土木事務所、または沼田土木事務所管内に建設業法に基づき設置された本店があること\n・設計業務受託者（羽鳥設備設計事務所）と資本関係または人的関係がないこと\n・親会社と子会社の関係、同一親会社を持つ双方の子会社の関係にないこと\n・役員の兼務、管財人の兼務、その他入札適正性を阻害する関係がないこと\n・健康保険法第48条、厚生年金保険法第27条、雇用保険法第7条の規定による届出義務を履行していること\n・契約能力がない者、破産者で復権を得ない者でないこと\n・群馬県財務規則第170条第2項に規定する入札参加制限を受けていない者\n・群馬県建設工事請負業者等指名停止措置要綱第2条第2項に規定する指名停止を受けていないこと\n・会社更生法または民事再生法に基づき手続開始決定後に資格者名簿に登載されていること（該当する場合）","【案件概要】\n群馬県県土整備部建築課が、令和8年度ALSOKぐんま総合スポーツセンターテニスコート夜間照明LED化工事の一般競争入札（事後審査方式）を実施。前橋市関根町に所在する当施設のテニスコート夜間照明を既存照明からLED照明に更新する工事。予算規模は別冊図面および仕様書による。フレックス工期制度により、落札者は契約工期の始期・終期を柔軟に設定できる。\n","【業務内容】\n- 受変電設備工事\n- 構内配電線路工事\n- 電灯設備工事\n- 既存夜間照明設備の撤去工事\n\n【応募要件】\n- 群馬県建設工事入札参加資格者名簿に登載されていること\n- 電気工事について特定建設業の許可を受けていること\n- 群馬県令和8・9年度建設工事入札参加資格者名簿における電気工事の総合数値が840点以上であること\n- 同種の電気工事を群馬県内で施工した実績を有すること（元請として平成28年4月1日～令和8年3月31日に完成引渡し完了、またはコンソーシアム構成員で出資比率20%以上）\n- 公共工事（国・特殊法人・地方公共団体発注）または地方道路公社・地方公共団体委託工事の施工実績があること\n- 一級管工事施工管理技士の資格を有する監理技術者または主任技術者を専任で配置できること\n- 当該技術者は申請時点で3ヶ月以上継続雇用されていること\n- 当該技術者は平成28年4月1日～令和8年3月31日に完成引渡しを完了した同種電気工事の経験を有すること\n- 前橋土木事務所、渋川土木事務所、中之条土木事務所、または沼田土木事務所管内に建設業法に基づく本店があること\n- 設計業務受託者（羽鳥設備設計事務所）と資本関係または人的関係がないこと\n- 健康保険、厚生年金保険、雇用保険の届出義務を履行していること\n- 法人登記簿に基づく能力確認、破産・指名停止・入札参加制限を受けていないこと\n\n【工期・期間】\n工事期間：令和8年9月～令和8年12月から令和9年3月までの約6ヶ月間（フレックス工期により柔軟に設定可能）\n完成期限日：令和9年3月12日\nテニスコート利用休止期間：令和9年1月25日(月)～令和9年3月5日(金)\n夜間照明利用停止期間：令和8年10月19日(月)～令和9年3月5日(金)",true,"(redacted)","gunma-cals",[29,30,31,32,33,34],{"url":26,"name":26},{"url":26,"name":26},{"url":26,"name":26},{"url":26,"name":26},{"url":26,"name":26},{"url":26,"name":26},false,[],[],{"id":6,"name":11,"categoryId":39,"parentId":15,"parentName":15,"bidInfoUrl":15},50,{"sameOrganization":41,"samePrefecture":66,"similar":86},[42,47,52,56,60],{"id":43,"title":44,"organizationName":11,"prefectureName":12,"publishedDate":45,"deadlineDate":46,"budget":15,"status":16},3875816,"令和8年度ぐんま学園体育館改修機械設備工事","2026-08-24T15:00:00.000Z","2026-09-08T15:00:00.000Z",{"id":48,"title":49,"organizationName":11,"prefectureName":12,"publishedDate":50,"deadlineDate":51,"budget":15,"status":16},3628785,"令和8年度ぐんま学園寮舎(赤城寮)個室化工事","2026-08-19T15:00:00.000Z","2026-08-27T15:00:00.000Z",{"id":53,"title":54,"organizationName":11,"prefectureName":12,"publishedDate":55,"deadlineDate":51,"budget":15,"status":16},3585746,"令和8年度ぐんま学園体育館改修電気設備工事","2026-08-18T15:00:00.000Z",{"id":57,"title":58,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":59,"budget":15,"status":16},3314011,"令和8年度しろがね学園一般棟浴室複室化改修工事","2026-08-26T15:00:00.000Z",{"id":61,"title":62,"organizationName":11,"prefectureName":12,"publishedDate":63,"deadlineDate":64,"budget":15,"status":65},3057738,"令和8年度地特事業県立森林公園赤城ふれあいの森あかぎ木の家改修工事","2026-07-30T15:00:00.000Z","2026-08-23T15:00:00.000Z","closed",[67,73,76,80,83],{"id":68,"title":69,"organizationName":70,"prefectureName":12,"publishedDate":45,"deadlineDate":71,"budget":72,"status":16},3887728,"補助公共 社会資本総合整備(防災・安全・一般) 小根山橋耐震補強設計業務 一般県道 小根山森林公園線 小根山橋 安中市松井田町横川 地内","群馬県県土整備部安中土木事務所","2026-10-15T15:00:00.000Z",40000000,{"id":74,"title":75,"organizationName":15,"prefectureName":12,"publishedDate":45,"deadlineDate":15,"budget":15,"status":16},3887727,"県央第二水道 1-2系PAC注入配管更新外工事",{"id":77,"title":78,"organizationName":79,"prefectureName":12,"publishedDate":45,"deadlineDate":15,"budget":15,"status":16},3887726,"単独公共 単独交通安全対策事業(交安)側溝整備工事 主要地方道 前橋長瀞線外 藤岡市鬼石外地内","群馬県県土整備部藤岡土木事務所",{"id":81,"title":82,"organizationName":79,"prefectureName":12,"publishedDate":45,"deadlineDate":15,"budget":15,"status":16},3887725,"単独公共 地域公共事業調整費路側復旧工事 主要地方道 高崎神流秩父線 多野郡 神流町大字万場外地内",{"id":84,"title":85,"organizationName":79,"prefectureName":12,"publishedDate":45,"deadlineDate":15,"budget":15,"status":16},3887724,"補助公共 社会資本総合整備(防災・安全)(国道防災)落石対策 重力式擁壁設置工事 国道 299号 多野郡 神流町大字神ヶ原地内",[87,94,98,103,106],{"id":88,"title":89,"organizationName":90,"prefectureName":91,"publishedDate":45,"deadlineDate":92,"budget":93,"status":16},3890176,"県単河川総合開発工事(富川橋警報局舎改良工)","千葉県 県土整備部 亀山・片倉ダム管理事務所","千葉県","2026-09-24T15:00:00.000Z",29403000,{"id":95,"title":96,"organizationName":90,"prefectureName":91,"publishedDate":45,"deadlineDate":97,"budget":15,"status":16},3888896,"県単河川総合開発委託(片倉ダム放流警報設備等点検整備)","2026-09-07T15:00:00.000Z",{"id":99,"title":100,"organizationName":101,"prefectureName":102,"publishedDate":45,"deadlineDate":15,"budget":15,"status":16},3887870,"令和8年度 配水管布設替工事(その2)","宮代町 企画財政課 企画財政室","埼玉県",{"id":104,"title":105,"organizationName":101,"prefectureName":102,"publishedDate":45,"deadlineDate":15,"budget":15,"status":16},3887869,"令和8年度 宮代第5号汚水幹線・枝線布設替工事",{"id":107,"title":108,"organizationName":101,"prefectureName":102,"publishedDate":45,"deadlineDate":15,"budget":15,"status":16},3887868,"令和8年度 舗装復旧工事(その3)",[110,112],{"year":111,"count":10},2024,{"year":113,"count":114},2026,9,[116,122,128,134],{"title":117,"link":118,"date":119,"thumb":120,"cat":121},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":123,"link":124,"date":125,"thumb":126,"cat":127},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":129,"link":130,"date":131,"thumb":132,"cat":133},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":135,"link":136,"date":137,"thumb":138,"cat":139},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]