[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-3309611":3,"bid-history-3309611":37,"bid-related-3309611":41,"union-latest":110},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":7,"bidCategoryChildId":8,"bidTypeId":9,"organizationName":10,"prefectureName":11,"publishedDate":12,"deadlineDate":13,"budget":14,"status":15,"department":16,"bidCategoryName":17,"bidTypeName":18,"categoryText":19,"regionText":20,"deadlineTime":21,"openingDate":22,"qualificationText":23,"aiSummary":24,"aiSummaryGated":25,"aiSummaryTruncated":26,"sourceUrl":27,"dataSourceCode":28,"budgetTaxIncluded":14,"documentUrls":29,"businessExperience":26,"localOffice":31,"securityRequirement":31,"qualifications":32,"certifications":34,"organization":35},3309611,"海自大湊(8)火薬庫新設進入路整備土木工事",1622,2,14,1,"防衛省東北防衛局","青森県","2026-08-05T15:00:00.000Z","2026-08-26T15:00:00.000Z",null,"active","総務部","土木","一般競争入札","土木工事（進入路整備、舗装、補強土壁、函渠工）","青森県むつ市","12:00:00","2026-11-19T15:00:00.000Z","・防衛省令和７・８年度一般競争参加資格のうち「土木一式工事」で級別格付を受けていること\n・「土木一式工事」に係る等級が「Ａ」であること\n・平成23年度から入札公告日までに、コンクリート製壁面材を使用した補強土壁の元請施工実績（工事成績評定点65点以上）またはこれを防衛省総合発注工事の一次下請けとして施工した実績を有すること\n・監理技術者は１級土木施工管理技士以上、主任技術者は２級土木施工管理技士以上の資格を有すること\n・配置予定技術者は、平成23年度以降に完成・引渡しが完了した擁壁新設工事で、現場施工期間の１／２以上の経験を有すること（工事成績評定点65点以上）\n・監理技術者は、監理技術者資格者証及び監理技術者講習修了証を有すること\n・配置予定技術者との直接的かつ恒常的な雇用関係を証明できる資料を提出できること\n・令和６年度及び令和７年度に東北防衛局発注の「土木一式工事」で完成・引渡しが完了した工事の施工実績がある場合、当該工事の評定点合計平均が65点以上であること\n・入札時に監理技術者等を支援し品質を確保する旨を誓約すること\n・上記工事の設計業務等の受注者又はこれと資本若しくは人事面で関連がある建設業者でないこと\n・予決令第70条及び第71条に該当しない者であること\n・会社更生法または民事再生法に基づく手続開始の申立てを受けていないこと\n・申請書提出期限日から開札時点までの間に指名停止を受けていないこと\n・暴力団関係業者でないこと\n・情報保全に係る履行体制に懸念がないこと","【案件概要】\n防衛省東北防衛局が海自大湊火薬庫新設進入路整備土木工事を一般競争入札（標準型）として実施する。青森県むつ市の海上自衛隊大湊弾薬整備補給所において、進入路の整備工事を行う。本工事は施工体制確認型総合評価落札方式の試行対象工事であり、価格と価格以外の要素（企業施工能力、信頼性・社会性、施工体制、賃上げ実施等）を総合的に評価して落札者を決定する。予算","規模および詳細は入札説明書による。\n\n【業務内容】\n- アスファルト舗装：約1,500㎡\n- 補強土壁（コンクリート製壁面材使用）：約1,800㎡\n- 函渠工：約13ｍ\n\n【応募要件】\n- 防衛省令和７・８年度一般競争参加資格のうち「土木一式工事」で級別格付を受けていること\n- 「土木一式工事」に係る等級が「Ａ」であること\n- 平成23年度から入札公告日（令和８年８月６日）までに、以下のいずれかの施工実績を有すること：①コンクリート製壁面材を使用した補強土壁の元請施工実績（工事成績評定点65点以上）、または②防衛省総合発注工事の一次下請けとしてコンクリート製壁面材を使用した補強土壁を施工した実績\n- 監理技術者は１級土木施工管理技士以上、主任技術者は２級土木施工管理技士以上の資格を有すること\n- 監理技術者は、平成23年度以降に完成・引渡しが完了した擁壁新設工事で、現場施工期間の１／２以上の経験を有すること（工事成績評定点65点以上）\n- 監理技術者は、監理技術者資格者証及び監理技術者講習修了証を有すること\n- 配置予定技術者との直接的かつ恒常的な雇用関係を証明できる資料の提出が必要\n- 令和６年度及び令和７年度に東北防衛局が発注した「土木一式工事」で完成・引渡しが完了した工事の施工実績がある場合、当該工事の評定点合計平均が65点以上であること\n- 入札時に監理技術者等を支援し品質を確保する旨を誓約すること\n- 上記１に示した工事の設計業務等の受注者又はこれと資本若しくは人事面において関連がある建設業者でないこと\n- 予決令第70条及び第71条に該当しない者であること\n- 会社更生法又は民事再生法に基づく手続開始の申立てを受けていないこと（再度格付を受けた場合を除く）\n- 申請書提出期限日から開札時点までの期間に指名停止を受けていないこと\n- 暴力団関係業者として防衛省が発注する工事から排除されていないこと\n- 情報保全に係る履行体制について懸念がなく、特定国籍に該当しないこと\n\n【工期・期間】\n契約締結日の翌日から令和10年12月15日まで。監理技術者等の専任期間は令和９年１月４日から令和10年12月15日までの期間（監理技術者制度運用マニュアルに該当する期間を除く）。",true,"(redacted)","ippi-koji",[30],{"url":27,"name":27},false,[33],3,[],{"id":6,"name":10,"categoryId":36,"parentId":14,"parentName":14,"bidInfoUrl":14},11,[38],{"year":39,"count":40},2026,33,{"sameOrganization":42,"samePrefecture":61,"similar":89},[43,49,52,55,58],{"id":44,"title":45,"organizationName":10,"prefectureName":46,"publishedDate":47,"deadlineDate":48,"budget":14,"status":15},3655062,"仙台外(8)設備工事監理業務","宮城県","2026-08-19T15:00:00.000Z","2026-09-02T15:00:00.000Z",{"id":50,"title":51,"organizationName":10,"prefectureName":46,"publishedDate":47,"deadlineDate":48,"budget":14,"status":15},3655061,"松島(8)設備工事監理業務",{"id":53,"title":54,"organizationName":10,"prefectureName":11,"publishedDate":47,"deadlineDate":48,"budget":14,"status":15},3655060,"海自八戸外(8)設備工事監理業務",{"id":56,"title":57,"organizationName":10,"prefectureName":11,"publishedDate":47,"deadlineDate":48,"budget":14,"status":15},3655059,"海自大湊(8)桟橋工事監理業務",{"id":59,"title":60,"organizationName":10,"prefectureName":46,"publishedDate":47,"deadlineDate":48,"budget":14,"status":15},3655058,"霞目外(8)建築工事監理業務",[62,68,74,79,84],{"id":63,"title":64,"organizationName":65,"prefectureName":11,"publishedDate":66,"deadlineDate":67,"budget":14,"status":15},3886559,"青森港油川地区航路・泊地(-12m)外浚渫工事","国土交通省東北地方整備局","2026-08-24T15:00:00.000Z","2026-10-25T15:00:00.000Z",{"id":69,"title":70,"organizationName":71,"prefectureName":11,"publishedDate":72,"deadlineDate":73,"budget":14,"status":15},3882752,"元素分析装置 一式(⁨143KB)","国立大学法人弘前大学","2026-08-23T15:00:00.000Z","2026-09-06T15:00:00.000Z",{"id":75,"title":76,"organizationName":77,"prefectureName":11,"publishedDate":72,"deadlineDate":78,"budget":14,"status":15},3882674,"(RE-10111)核融合原型炉における密度分布及びプラズマ位置診断のための反射計の適用性の検討【掲載期間:2026-8-24~2026-9-14】","国立研究開発法人量子科学技術研究開発機構核融合エネルギー研究開発部門六ヶ所核融合研究所","2026-09-14T15:00:00.000Z",{"id":80,"title":81,"organizationName":77,"prefectureName":11,"publishedDate":82,"deadlineDate":83,"budget":14,"status":15},3744487,"(RE-09577)微細構造解析装置の移設作業【掲載期間:2026-8-21~2026-9-10】","2026-08-20T15:00:00.000Z","2026-09-09T15:00:00.000Z",{"id":85,"title":86,"organizationName":87,"prefectureName":11,"publishedDate":47,"deadlineDate":88,"budget":14,"status":15},3744485,"森林環境保全整備事業(北来満山地区)","林野庁東北森林管理局三八上北森林管理署","2026-10-01T15:00:00.000Z",[90,95,99,102,106],{"id":91,"title":92,"organizationName":10,"prefectureName":11,"publishedDate":93,"deadlineDate":94,"budget":14,"status":15},3012021,"海自大湊(8)桟橋新設工事","2026-07-29T15:00:00.000Z","2026-09-16T15:00:00.000Z",{"id":96,"title":97,"organizationName":10,"prefectureName":11,"publishedDate":93,"deadlineDate":47,"budget":14,"status":98},3012020,"海自大湊(近川)(8)外柵新設等土木工事","closed",{"id":100,"title":101,"organizationName":10,"prefectureName":11,"publishedDate":93,"deadlineDate":47,"budget":14,"status":98},3012019,"海自大湊(樺山)(8)外柵新設等土木工事",{"id":103,"title":104,"organizationName":10,"prefectureName":11,"publishedDate":105,"deadlineDate":83,"budget":14,"status":15},2743430,"海自大湊(8)浚渫工事","2026-07-22T15:00:00.000Z",{"id":107,"title":108,"organizationName":10,"prefectureName":11,"publishedDate":109,"deadlineDate":82,"budget":14,"status":98},1973476,"海自大湊(8)火薬庫新設造成工事","2026-07-01T15:00:00.000Z",[111,117,123,129],{"title":112,"link":113,"date":114,"thumb":115,"cat":116},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":118,"link":119,"date":120,"thumb":121,"cat":122},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":124,"link":125,"date":126,"thumb":127,"cat":128},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":130,"link":131,"date":132,"thumb":133,"cat":134},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]