[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-3305033":3,"bid-history-3305033":35,"bid-related-3305033":39,"union-latest":75},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":11,"bidCategoryName":17,"bidTypeName":18,"categoryText":19,"regionText":20,"deadlineTime":21,"openingDate":22,"qualificationText":23,"aiSummary":24,"aiSummaryGated":25,"aiSummaryTruncated":26,"sourceUrl":27,"dataSourceCode":28,"budgetTaxIncluded":15,"documentUrls":29,"businessExperience":31,"localOffice":26,"securityRequirement":31,"qualifications":32,"certifications":33,"organization":34},3305033,"杉原川予防治山事業(8Y第2号)",2680,28,2,14,1,"兵庫県 北播磨県民局 本局(総務防災課 - 農林水産・環境)","兵庫県","2026-08-05T15:00:00.000Z","2026-09-02T15:00:00.000Z",null,"closed","土木","一般競争入札","一般土木","多可郡多可町加美区山寄上字オリト地内","12:00:00","2026-09-03T15:00:00.000Z","・兵庫県の建設工事入札参加資格者名簿に登載されている者\n・入札参加資格工種：一般土木工事\n・多可郡多可町または西脇市に建設業の許可を受けた主たる営業所を有すること\n・確認基準日に有効な一般土木工事における格付等級がA等級（社会貢献評価数値40点以上）、B等級、またはC等級（格付点数5点以上45点以下で平均工事成績75点以上）であること\n・一般土木工事における技術・社会貢献評価数値の合計が60点以上であること\n・土木工事業に係る建設業の許可を有すること\n・建設業法に定める必要な有資格者を配置でき、配置予定技術者は参加申込期限日以前に3ヶ月以上の直接的かつ恒常的な雇用関係があること\n・単独企業による応募（共同企業体不可）","【案件概要】\n兵庫県北播磨県民局が杉原川予防治山事業（8Y第2号）の制限付き一般競争入札を実施。多可郡多可町加美区山寄上字オリト地内において、谷止工469.0m³、流路工11.0mの一般土木工事を予定している。工期は令和9年3月29日限りで、契約締結予定日は令和8年9月上旬。最低制限価格が設定され、事後審査型の入札方式が採用されている。週休2日制度の対象工事","で、ICT活用による加点評価の対象でもある。\n\n【業務内容】\n- 谷止工：469.0m³の施工\n- 流路工：11.0mの施工\n- 一般土木工事（工種：一般土木）\n- ICT治山ダム工またはICT土工、ICT法面工の活用（受注者希望型）\n- 週休2日制度に対応した工事実施\n\n【応募要件】\n- 兵庫県の建設工事入札参加資格者名簿に登載されている者\n- 入札参加資格工種：一般土木工事\n- 多可郡多可町または西脇市に建設業の許可を受けた主たる営業所を有すること\n- 確認基準日に有効な入札参加資格者名簿の一般土木工事における格付等級がA等級（社会貢献評価数値40点以上）、B等級、またはC等級（格付点数5点以上45点以下で平均工事成績75点以上）であること\n- 一般土木工事における技術・社会貢献評価数値の合計が60点以上であること\n- 土木工事業に係る建設業の許可を有すること\n- 建設業法に定める必要な有資格者を配置でき、配置予定技術者は参加申込期限日以前に3ヶ月以上の直接的かつ恒常的な雇用関係があること\n- 単独企業による応募（共同企業体は不可）\n\n【工期・期間】\n契約締結予定日：令和8年9月上旬\n工期：令和9年3月29日限り\n建設工事請負契約書等の閲覧：令和8年8月6日（木）から令和8年9月1日（火）まで\n設計図書交付・提出資料様式交付：令和8年8月6日（木）から令和8年9月1日（火）まで\n入札参加申込書受付：令和8年8月6日（木）から令和8年8月17日（月）まで\n質問書受付：令和8年8月6日（木）から令和8年8月25日（火）まで\n回答書閲覧：令和8年8月28日（金）から令和8年9月1日（火）まで\n入札書・工事費内訳書受付：令和8年9月2日（水）から令和8年9月3日（木）正午まで\n開札日時：令和8年9月4日（金）午前10時00分",true,"(redacted)","ppi-core-hyogo",[30],{"url":27,"name":27},false,[],[],{"id":6,"name":11,"categoryId":9,"parentId":15,"parentName":15,"bidInfoUrl":15},[36],{"year":37,"count":38},2026,3,{"sameOrganization":40,"samePrefecture":50,"similar":74},[41,45],{"id":42,"title":43,"organizationName":11,"prefectureName":12,"publishedDate":44,"deadlineDate":13,"budget":15,"status":16},2616595,"支流野間川山地災害重点地域総合対策事業","2026-07-13T15:00:00.000Z",{"id":46,"title":47,"organizationName":11,"prefectureName":12,"publishedDate":48,"deadlineDate":49,"budget":15,"status":16},2616594,"加古川流域予防治山事業(8Y第1号)","2026-07-06T15:00:00.000Z","2026-07-29T15:00:00.000Z",[51,57,62,65,69],{"id":52,"title":53,"organizationName":54,"prefectureName":12,"publishedDate":55,"deadlineDate":15,"budget":15,"status":56},2954301,"播磨中継加圧ポンプ場電気設備更新工事","兵庫県 企業庁 利水事務所","2027-03-24T15:00:00.000Z","active",{"id":58,"title":59,"organizationName":60,"prefectureName":12,"publishedDate":22,"deadlineDate":61,"budget":15,"status":56},4439147,"第2工場排水処理設備塔類保守点検業務委託","尼崎市","2026-09-24T15:00:00.000Z",{"id":63,"title":64,"organizationName":60,"prefectureName":12,"publishedDate":22,"deadlineDate":61,"budget":15,"status":56},4433338,"尼崎市遊具点検業務委託",{"id":66,"title":67,"organizationName":60,"prefectureName":12,"publishedDate":22,"deadlineDate":68,"budget":15,"status":56},4433327,"燃料油(令和8年10月・11月分)","2026-09-23T15:00:00.000Z",{"id":70,"title":71,"organizationName":72,"prefectureName":12,"publishedDate":22,"deadlineDate":73,"budget":15,"status":56},4433322,"軽4輪車(バン型EV車)借上","西宮市","2026-09-29T15:00:00.000Z",[],[76,82,88,94],{"title":77,"link":78,"date":79,"thumb":80,"cat":81},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":83,"link":84,"date":85,"thumb":86,"cat":87},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":89,"link":90,"date":91,"thumb":92,"cat":93},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":95,"link":96,"date":97,"thumb":98,"cat":99},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]