[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-3292414":3,"bid-history-3292414":36,"bid-related-3292414":40,"union-latest":87},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":17,"bidCategoryName":18,"bidTypeName":19,"categoryText":20,"regionText":11,"deadlineTime":21,"openingDate":22,"qualificationText":23,"aiSummary":24,"aiSummaryGated":25,"aiSummaryTruncated":26,"sourceUrl":27,"dataSourceCode":28,"budgetTaxIncluded":15,"documentUrls":29,"businessExperience":26,"localOffice":26,"securityRequirement":31,"qualifications":32,"certifications":33,"organization":34},3292414,"赤坂団地市営住宅敷地測量業務",30,2,7,39,1,"青森県五所川原市","青森県","2026-08-04T15:00:00.000Z","2026-08-18T15:00:00.000Z",null,"closed","建設部 建築住宅課","測量","一般競争入札","測量業務","12:00:00","2026-08-23T15:00:00.000Z","・地方自治法施行令第167条の4第1項に規定する者に該当しないこと\n・五所川原市契約事務規則第2条に規定する一般競争入札に参加させない者でないこと\n・五所川原市から指名停止の措置を受けた場合、その期間が本公告の日から開札の日までにないこと\n・会社更生法（平成14年法律第154号）又は民事再生法（平成11年法律第225号）に基づき更生又は再生手続開始の申立てがなされている者ではないこと\n・五所川原市内に本店を有すること\n・市の令和8年度測量･建設コンサルタント等競争入札参加資格者名簿に登録され、法に基づく登録（測量業者）がされていること\n・測量士の資格を有し、当該入札参加者と直接的かつ恒常的な雇用関係にある管理技術者を配置できること\n・本件業務に係る入札参加資格審査申請書提出日以前10年以内に官公庁発注の測量業務の元請業務実績があること","【案件概要】\n五所川原市が赤坂団地市営住宅敷地の測量業務を条件付き一般競争入札で発注。業務場所は五所川原市金木町芦野地内、敷地面積2,361.74㎡の測量一式。予定価格は未記載だが最低制限価格を設定。資格審査を経た後、令和8年8月24日に入開札を実施。契約締結は落札者決定から7日以内。発注担当課は建設部建築住宅課。\n\n【業務内容】\n- 赤坂団地市営住宅敷地面","積2,361.74㎡の測量業務一式\n\n【応募要件】\n- 地方自治法施行令第167条の4第1項に規定する者に該当しないこと\n- 五所川原市契約事務規則第2条に規定する一般競争入札に参加させない者でないこと\n- 五所川原市から指名停止の措置を受けていないこと（公告日から開札日までの期間）\n- 会社更生法または民事再生法に基づく手続開始申立てを受けていないこと\n- 五所川原市内に本店を有すること\n- 市の令和8年度測量・建設コンサルタント等競争入札参加資格者名簿に登録され、法に基づく測量業者登録がなされていること\n- 測量士の資格を有し、入札参加者と直接的かつ恒常的な雇用関係にある管理技術者を配置できること\n- 入札参加資格審査申請書提出日以前10年以内に官公庁発注の測量業務の元請業務実績があること\n\n【工期・期間】\n履行期限は令和8年12月25日。資格審査受付期間は令和8年8月5日（水）から令和8年8月19日（水）まで（閉庁日を除く）。受付時間は午前9時から正午、午後1時から午後4時（最終日は午前9時から正午）。入開札執行日は令和8年8月24日（月）午前9時30分から。設計図書縦覧期間は公告日から令和8年8月24日まで。設計図書等への質問受付期限は令和8年8月20日まで。",true,"(redacted)","kkj",[30],{"url":27,"name":27},false,[],[],{"id":6,"name":11,"categoryId":35,"parentId":15,"parentName":15,"bidInfoUrl":15},52,[37],{"year":38,"count":39},2026,22,{"sameOrganization":41,"samePrefecture":62,"similar":86},[42,48,52,55,58],{"id":43,"title":44,"organizationName":11,"prefectureName":12,"publishedDate":45,"deadlineDate":46,"budget":15,"status":47},4298643,"除細動器一式","2026-09-01T15:00:00.000Z","2026-09-08T15:00:00.000Z","active",{"id":49,"title":50,"organizationName":11,"prefectureName":12,"publishedDate":45,"deadlineDate":51,"budget":15,"status":47},4295982,"広報ごしょがわら印刷","2026-09-13T15:00:00.000Z",{"id":53,"title":54,"organizationName":11,"prefectureName":12,"publishedDate":45,"deadlineDate":46,"budget":15,"status":47},4295981,"相内処理区管路施設調査業務",{"id":56,"title":57,"organizationName":11,"prefectureName":12,"publishedDate":45,"deadlineDate":46,"budget":15,"status":47},4295980,"西部枝線管路施設調査業務",{"id":59,"title":60,"organizationName":11,"prefectureName":12,"publishedDate":61,"deadlineDate":45,"budget":15,"status":16},3953843,"市浦庁舎屋根及び外壁修繕","2026-08-25T15:00:00.000Z",[63,70,74,78,82],{"id":64,"title":65,"organizationName":66,"prefectureName":12,"publishedDate":67,"deadlineDate":68,"budget":69,"status":47},4427009,"新屋町学校2号線側溝整備工事","青森県平川市","2026-09-03T15:00:00.000Z","2026-09-23T15:00:00.000Z",13112000,{"id":71,"title":72,"organizationName":66,"prefectureName":12,"publishedDate":67,"deadlineDate":68,"budget":73,"status":47},4427008,"石畑岡元本町線側溝整備工事",12276000,{"id":75,"title":76,"organizationName":66,"prefectureName":12,"publishedDate":67,"deadlineDate":68,"budget":77,"status":47},4427007,"日沼地区防火水槽新設工事",11550000,{"id":79,"title":80,"organizationName":66,"prefectureName":12,"publishedDate":67,"deadlineDate":68,"budget":81,"status":47},4427006,"中佐渡地区農村公園解体工事",8217000,{"id":83,"title":84,"organizationName":66,"prefectureName":12,"publishedDate":67,"deadlineDate":68,"budget":85,"status":47},4427005,"尾上野球場トイレ洋式化工事",4873000,[],[88,94,100,106],{"title":89,"link":90,"date":91,"thumb":92,"cat":93},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":95,"link":96,"date":97,"thumb":98,"cat":99},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":101,"link":102,"date":103,"thumb":104,"cat":105},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":107,"link":108,"date":109,"thumb":110,"cat":111},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]