[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-3288311":3,"bid-history-3288311":36,"bid-related-3288311":40,"union-latest":117},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":11,"bidCategoryName":17,"bidTypeName":18,"categoryText":19,"regionText":20,"deadlineTime":21,"openingDate":14,"qualificationText":22,"aiSummary":23,"aiSummaryGated":24,"aiSummaryTruncated":25,"sourceUrl":26,"dataSourceCode":27,"budgetTaxIncluded":28,"documentUrls":29,"businessExperience":25,"localOffice":25,"securityRequirement":28,"qualifications":31,"certifications":32,"organization":33},3288311,"市道第5-44号線舗装修繕工事",2071,12,2,15,1,"浦安市 市長部局 財務部契約課","千葉県","2026-08-05T15:00:00.000Z","2026-08-31T15:00:00.000Z",19990000,"closed","舗装","一般競争入札","土木一式工事（市道舗装修繕）","浦安市入船三丁目地先","09:00:00","・令和8・9年度浦安市入札参加資格者名簿に登載されていること\n・建設業法に基づく本件発注工種（土木一式工事）の特定建設業又は一般建設業許可を受けていること\n・公告公示日において指名停止措置を受けていないこと\n・公告公示日において市内に本店を有していること\n・公告公示日において資格者名簿に登載された同種工事の総合点数が最も高い者であること（官公需適格組合・経常建設共同企業体以外）\n・本市の格付けがC等級以上であること\n・本件発注工種に係る監理技術者又は主任技術者を法令等に基づき配置できること\n・過去10年間に同種工事（1件で11,000,000円以上の土木一式工事）を元請として施工実績があること\n・手形交換所による取引停止処分等の財務状況不良要件に該当しないこと\n・会社更生法・民事再生法の適用申請をしていないこと（手続開始決定がされていない場合を除く）\n・社会保険等に加入していること","【案件概要】\n浦安市が実施する一般競争入札。市道第5-44号線舗装修繕工事（土木一式工事）を浦安市入船三丁目地先で実施。予定価格は19,990,000円（税抜）。契約締結日の翌日から101日間の工期。フレックス工期契約制度・週休2日制工事を適用。\n\n【業務内容】\n- 市道第5-44号線の舗装修繕工事\n- 土木一式工事として実施\n- 別紙仕様書に基づく施工\n\n","【応募要件】\n・令和8・9年度浦安市入札参加資格者名簿に登載されていること\n・建設業法に基づく本件発注工種（土木一式工事）の特定建設業又は一般建設業許可を受けていること\n・公告公示日において指名停止措置を受けていないこと\n・公告公示日において市内に本店を有していること\n・公告公示日において資格者名簿に登載された同種工事の総合点数が最も高い者であること（官公需適格組合・経常建設共同企業体以外）\n・公告公示日において浦安市の格付けがC等級以上であること\n・本件発注工種に係る監理技術者又は主任技術者を法令等に基づき配置できること\n・過去10年間に同種工事（1件で11,000,000円以上の土木一式工事）を元請として施工実績があること（共同企業体の場合は代表者又は50%以上出資者として実績があること）\n・手形交換所による取引停止処分、不渡手形・不渡小切手を開札日前2年以内に受けていないこと\n・会社更生法・民事再生法の適用申請をしていないこと（裁判所からの手続開始決定がされていない場合を除く）\n・社会保険等に加入していること\n\n【工期・期間】\n契約締結日の翌日から101日間。工事着手期限は契約締結日から30日以内。",true,"(redacted)","ppi-core-chiba",false,[30],{"url":26,"name":26},[],[],{"id":6,"name":11,"categoryId":34,"parentId":35,"parentName":35,"bidInfoUrl":35},16,null,[37],{"year":38,"count":39},2026,48,{"sameOrganization":41,"samePrefecture":66,"similar":93},[42,49,54,58,62],{"id":43,"title":44,"organizationName":11,"prefectureName":12,"publishedDate":45,"deadlineDate":46,"budget":47,"status":48},4291245,"総合体育館・屋内水泳プール雨漏り等改修工事","2026-09-02T15:00:00.000Z","2026-09-28T15:00:00.000Z",57950000,"active",{"id":50,"title":51,"organizationName":11,"prefectureName":12,"publishedDate":45,"deadlineDate":52,"budget":53,"status":48},4291244,"五丁歩排水機場・堀江第2排水機場更新に係る吐口構造等検討業務委託","2026-09-24T15:00:00.000Z",20950000,{"id":55,"title":56,"organizationName":11,"prefectureName":12,"publishedDate":45,"deadlineDate":52,"budget":57,"status":48},4291243,"猫実五丁目地区まちづくり方針検討に向けた基礎調査業務委託",6020000,{"id":59,"title":60,"organizationName":11,"prefectureName":12,"publishedDate":45,"deadlineDate":52,"budget":61,"status":48},4291242,"猫実第4市営住宅外壁等改修工事",23340000,{"id":63,"title":64,"organizationName":11,"prefectureName":12,"publishedDate":45,"deadlineDate":52,"budget":65,"status":48},4291241,"富岡小学校・美浜南小学校外周フェンス改修工事",19220000,[67,74,79,84,88],{"id":68,"title":69,"organizationName":70,"prefectureName":12,"publishedDate":71,"deadlineDate":72,"budget":73,"status":48},4427000,"松契一般第211号 松戸駅西口地下駐車場空調設備等交換修繕 (PDF:135KB)","千葉県松戸市","2026-09-03T15:00:00.000Z","2026-10-01T15:00:00.000Z",5500000,{"id":75,"title":76,"organizationName":70,"prefectureName":12,"publishedDate":71,"deadlineDate":77,"budget":78,"status":48},4426999,"松契一般第208号 松戸市消防局空調設備改修その他電気設備工事(第3期)(PDF:139KB)","2026-09-09T15:00:00.000Z",12180000,{"id":80,"title":81,"organizationName":82,"prefectureName":12,"publishedDate":71,"deadlineDate":83,"budget":35,"status":48},4426998,"成田市部活動地域展開事業における認定地域クラブの運営業務に関するプロポーザルの実施について","千葉県成田市","2026-09-23T15:00:00.000Z",{"id":85,"title":86,"organizationName":87,"prefectureName":12,"publishedDate":71,"deadlineDate":35,"budget":35,"status":48},4425144,"テルモBCT株式会社製 遠心型血液成分分離装置 スペクトラオプティア 一式","国立大学法人千葉大学",{"id":89,"title":90,"organizationName":91,"prefectureName":12,"publishedDate":71,"deadlineDate":92,"budget":35,"status":48},4425143,"R8首都国道事務所連絡車(4×2、7人乗)1台交換購入 [PDF:133KB]","国土交通省関東地方整備局首都国道事務所","2026-10-08T15:00:00.000Z",[94,102,106,111,114],{"id":95,"title":96,"organizationName":97,"prefectureName":98,"publishedDate":99,"deadlineDate":100,"budget":101,"status":48},4296384,"R8-180 令和8年度 市道122号線舗装修繕工事 公告 (PDFファイル: 594.4KB)","埼玉県加須市","埼玉県","2026-09-01T15:00:00.000Z","2026-09-16T15:00:00.000Z",9892000,{"id":103,"title":104,"organizationName":97,"prefectureName":98,"publishedDate":99,"deadlineDate":100,"budget":105,"status":48},4296383,"R8-181 令和8年度 市道145号線舗装修繕工事 公告 (PDFファイル: 593.1KB)",9860000,{"id":107,"title":108,"organizationName":109,"prefectureName":98,"publishedDate":99,"deadlineDate":100,"budget":110,"status":48},4265729,"令和8年度 市道147号線舗装修繕工事","加須市 総合政策部 管理契約課",9070000,{"id":112,"title":113,"organizationName":109,"prefectureName":98,"publishedDate":99,"deadlineDate":100,"budget":101,"status":48},4265724,"令和8年度 市道122号線舗装修繕工事",{"id":115,"title":116,"organizationName":109,"prefectureName":98,"publishedDate":99,"deadlineDate":100,"budget":105,"status":48},4265723,"令和8年度 市道145号線舗装修繕工事",[118,124,130,136],{"title":119,"link":120,"date":121,"thumb":122,"cat":123},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":125,"link":126,"date":127,"thumb":128,"cat":129},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":131,"link":132,"date":133,"thumb":134,"cat":135},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":137,"link":138,"date":139,"thumb":140,"cat":141},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]